Road closed block

Roadworks and road closures: 3rd September 2014

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

A3020 Newport Road, Northwood, Isle Of Wight
04 September — 17 September
Delays likely Traffic control (two-way signals)
Works location: A3020 Jnc Coronation Avenue On Newport Road, Newport Road
Works description: Install 1x 100m Of Fibre Cable And Sub-Duct Into Duct,Locate 1 Blockages In Existing Duct,Locate And Excavate 1 Blockage In Existing Duct
Responsibility for works: BT
Current status: Advanced planning

A3055 Esplanade, Ryde, Isle Of Wight
04 September — 04 October
Delays likely Road closure
Works location: Ryde: From North Walk To The Strand (Ml310059): Esplanade-Ryde:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Br-Stren:R/H1, Barell Cambered Roads – F1 – 100mm Channel Strengthen, Shaping And 30mm Fibrovia Surfac Course Overlay) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Doctors Lane, Gatcombe, Isle Of Wight
04 September — 04 October
Delays likely Road closure
Works location: Gatcombe: From Gatcombe Road To Rectory Lane (Ml640436): Doctors Lane-Gatcombe:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4) Gatcom
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

St Thomas Street, Ryde, Isle Of Wight
04 September — 04 October
Delays likely Road closure
Works location: Ryde: From Lind Street To Buckingham Road (Ml341297): St Thomas Street-Ryde:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Br-Stren:R/H4, Barell Cambered Roads – F1 – 100mm Channel Strengthen, Shaping And 30mm Fibrovia Surfac Course Overlay) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

West Street, Seaview, Isle Of Wight
03 September — 29 September
Delays likely Road closure
Works location: Seaview: From Rope Walk To High Street (Ml341506): West Street-Seaview:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Fibrovia:U/H4, Resurface 30mm Fibrovia Plus Regulating/Patching (Kerbed=Inlay/Unkerbed=Overlay)-Urban:H4) Seavie
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Woodnutt Close, Bembridge, Isle Of Wight
03 September — 03 October
Delays likely Road closure
Works location: Bembridge: From Trelawny Way 72m North (Ml363285): Woodnutt Close-Bembridge:; Cw Cip Scheme Cw Cip Scheme
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Bembri
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Sandown Road, Lake, Isle Of Wight
03 September — 05 September
Delays possible Some carriageway incursion
Works location: 53, Sandown Road,Lake,Iow.
Works description: – Interim To Perm Reinstatment
Responsibility for works: Southern Water
Current status: Advanced planning

B3341 Medina Avenue, Newport, Isle Of Wight
03 September — 16 September
Delays possible Traffic control (two-way signals)
Works location: Newport: From Terrace Road, East, Then South To Shide Road (Ml 210082, Ml 210083, Ml 240140 And Ml 240141): :; Sl Cip Sc
Works description: Install No 28 Lanterns (No 25 Columns) 2 Bus Stops, 1 Neighbourhood Watch Sign, 3 No Waiting Signs, 6 Route/Direction Signs, 5 Warning Signs, 1 Cctv Related Sign And 1 Traffic Sign Head Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3341 St Johns Place, Newport, Isle Of Wight
04 September — 17 September
Delays possible Traffic control (two-way signals)
Works location: Newport: From Trafalgar Road, South To Medina Avenue (Ml 210082): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install No 2 Lanterns (No 2 Columns) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3341 Trafalgar Road, Newport, Isle Of Wight
04 September — 17 September
Delays possible Traffic control (two-way signals)
Works location: Newport: From St James Street Upper, West To Carisbrooke Road (Ml 230090 And Ml 230089): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install No 16 Lanterns (No 11columns) 3 Lit Warning Signs, 1 Power Supply Socket, 1 Lit Amber Flashing Sign And 1 Lit Vehicle Speed Activated Sign Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3395 Sandown Road, Bembridge, Isle Of Wight
03 September — 04 September
Delays possible Traffic control (two-way signals)
Works location: Bembridge: On The W/B C/Way Just Past The Entrance To Bembridge A Farm Opposite The Propeller Inn: Sandown Road-Bembridg
Works description: Idr – Loose Gully Cover Frame Needs Resetting Tm – Two Way Temp Lights Or Stop And Go Boards On 40mph Road (Gl: Ironwork Rocking/Corrosion) Bembri
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Dodnor Lane, Newport, Isle Of Wight
03 September — 05 September
Delays possible Lane closure
Works location: Newport: From Medina Way, North To Junction Of Monks Brook (Ml 210012, Ml 240175, Ml 240176, Ml 240177, Ml 241177 And Ml
Works description: Install No 28 Lanterns (No 18 Columns) 3 Bus/Tram/Cycle Facilities, 1 Cctv Sign, 3 Route/Direction Signs And 2 Warning Signs Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Image: Ell R Brown under CC BY 2.0