Road closed by traffic lights

Roadworks and road closures: 21st October 2014

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

A3055 Afton Road, Freshwater, Isle Of Wight
22 October — 01 December
Delays likely Road closure
Works location: Freshwater: From 170m North Of Newport Road To 420m North Of Newport Road (Ml620057) : Afton Road-Freshwater:; Stacey
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H2, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural: H2) Freshw
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Newport Road, Cowes, Isle Of Wight
21 October — 23 October
Delays possible Some carriageway incursion
Works location: 83 Newport Rd
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

A3055 Alpine Road, Ventnor, Isle Of Wight
22 October — 24 October
Delays possible Traffic control (two-way signals)
Works location: From Church St To Zig Zag Road
Works description: Cable Recovery Using Rolling Traffic Lights
Responsibility for works: BT
Current status: Advanced planning

B3330/B3340 Nettlestone Hill, Seaview, Isle Of Wight
21 October — 23 October
Delays possible Traffic control (multi-way signals)
Works location: Seaview: Jnc Of Nettlestone Hill And Seaview Lane: Nettlestone Hill-Seaview:; Ops Hub
Works description: Idr – P/H .70 X .50 And 40mm Deep Tm – Three Way Temp Lights Seavie
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3330 Eddington Road, Seaview, Isle Of Wight
21 October — 23 October
Delays possible Traffic control (two-way signals)
Works location: Seaview: O/S Kerry Fields Play Area On The St. Helens Bound Side Of The C/Way: Eddington Road-Seaview:; Scheduler Ops Hu
Works description: Idr – Infill Make Safe Dip Between Kers And Bt Cover Approx Size F 45mm Has Developed Overa Length Of 2.90m Tm – Two Way Temp Lights Because Of Bend In Road Here (Cw: Pothole) Seavie
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning