Roadworks lights:

Roadworks and road closures: 31st October 2014

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

A3055 Alpine Road, Ventnor, Isle Of Wight
01 November — 01 January 2015
Delays likely Road closure
Works location: Ventnor: From 80 Metres Northwest Of Marlborough Road To Belgrave Road (Ml530055) : Alpine Road-Ventnor:; Stacey Terr
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Cc-Ul-Mandflexiand30%Recon:U/H3, Resurface 40 Mm Ul-M 65psv With Flexiplast System And 30% Reconstrucion-Urban:H3) Ventno
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Alpine Road, Ventnor, Isle Of Wight
01 November — 01 January 2015
Delays likely Road closure
Works location: Ventnor: From High Street To 80 Metres Northwest Of Marlborough Road (Ml530056) : Alpine Road-Ventnor:; Stacey Terret
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Cc-Ul-Mandflexiand30%Recon:U/H3, Resurface 40 Mm Ul-M 65psv With Flexiplast System And 30% Reconstrucion-Urban:H3) Ventno
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 East Hill Road, Ryde, Isle Of Wight
01 November — 01 January 2015
Delays likely Road closure
Works location: Ryde: From Alexandra Road To 200 Metres North Thereof (Ml310056) : East Hill Road-Ryde:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Br-Stren:R/H1, Barell Cambered Roads – F1 – 100mm Channel Strengthen, Shaping And 30mm Fibrovia Surfac Course Overlay) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 High Street, Brading, Isle Of Wight
01 November — 01 January 2015
Delays likely Road closure
Works location: Brading: From Quay Lane To The Mall (Ml310038) : High Street-Brading:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren150:R/H1, Strengthen 25mm Ul-M 65psv And 125mm Hdm50-Rural:H1) Bradin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 High Street, Brading, Isle Of Wight
01 November — 01 January 2015
Delays likely Road closure
Works location: Brading: From Quay Lane To The Mall (Ml310038) : High Street-Brading:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren150:R/H1, Strengthen 25mm Ul-M 65psv And 125mm Hdm50-Rural:H1) Bradin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3056 Arreton Road, Arreton, Isle Of Wight
01 November — 01 December
Delays likely Road closure
Works location: Arreton: From East Lane To 340 Metres North Thereof (Ml410055) : Arreton Road-Arreton:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H1, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Rural:H1) Arreto
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3056 Blackwater Shute, Arreton, Isle Of Wight
01 November — 01 January 2015
Delays likely Road closure
Works location: Arreton: From Blackwater Hollow To 540 Metres Southeast Therof (Ml410051) : Blackwater Shute-Arreton:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Cc-Ul-Mandflexiand30%Recon:U/H1, Resurface 40 Mm Ul-M 65psv With Flexiplast System And 30% Reconstrucion-Urban:H1) Arreto
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Alexandra Lane, Newport, Isle Of Wight
01 November — 01 December
Delays likely Road closure
Works location: Newport: From Drill Hall Road To Cavendish Place (Ml260428) : Alexandra Lane-Newport:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Alverstone Road, East Cowes, Isle Of Wight
31 October — 01 December
Delays likely Road closure
Works location: East Cowes: From Whippingham Road (Southern Junction) 500m North East (Ml240147) : Alverstone Road-East Cowes:; Stace
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4) East C
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Ash Grove, Cowes, Isle Of Wight
01 November — 01 December
Delays likely Road closure
Works location: Cowes: From Mill Hill Road To Love Lane (Ml140197) : Ash Grove-Cowes:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3322 Alum Bay New Road, Totland, Isle Of Wight
01 November — 01 December
Delays likely Road closure
Works location: Totland: From Cliff Road To York Road (Ml630098) : Alum Bay New Road-Totland:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Totlan
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3330/A3055 Appley Road, Ryde, Isle Of Wight
01 November — 01 December
Delays likely Road closure
Works location: Ryde: From Marlborough Road To Alexandra Road (Ml310055) : Appley Road-Ryde:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H1, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Urban:H1) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3330 Eddington Road, Seaview, Isle Of Wight
01 November — 01 January 2015
Delays likely Road closure
Works location: Seaview: From Caws Avenue To 320 Metres South Thereof (Ml330081) : Eddington Road-Seaview:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Seavie
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Bannermans Path, Freshwater, Isle Of Wight
01 November — 01 January 2015
Delays likely Road closure
Works location: Freshwater: From School Green Road For Its Entire Length (Ml660608) : Bannermans Path-Freshwater:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Freshw
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Broad Lane, Brighstone, Isle Of Wight
01 November — 01 January 2015
Delays likely Road closure
Works location: Brighstone: From Mill Lane To 250 Metres North Thereof (Ml640390) : Broad Lane-Brighstone:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4) Brighs
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Locks Green Road, Porchfield, Isle Of Wight
01 November — 01 January 2015
Delays likely Road closure
Works location: Porchfield: From 380 Metres North Of Colemans Lane (Eastern Triangle) To New Road (Ml630182) : Locks Green Road-Porch
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Porchf
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Locks Green Road, Porchfield, Isle Of Wight
01 November — 01 January 2015
Delays likely Road closure
Works location: Porchfield: From Colemans Lane (Eastern Triangle) To 330 Metres West Thereof (Ml630180) : Locks Green Road-Porchfield
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Porchf
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Alum Bay Old Road, Totland, Isle Of Wight
01 November — 01 December
Delays likely Road closure
Works location: Totland: From Alum Bay New Road 450m East (Ml630199) : Alum Bay Old Road-Totland:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Totlan
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Berry Shute, Chillerton, Gatcombe, Isle Of Wight
01 November — 01 January 2015
Delays likely Road closure
Works location: Gatcombe: From Berry Lane To 210m North Thereof (Ml630225) : Berry Shute-Gatcombe:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Gatcom
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Lane End Road, Bembridge, Isle Of Wight
01 November — 01 January 2015
Delays likely Road closure
Works location: Bembridge: From Lane End Close To Foreland Farm Road (Ml340158) : Lane End Road-Bembridge:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Recon160:U/H3, Reconstruction 25mm Ul-M 65psv And 135mm Foambase-Urban:H3) Bembri
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Belgrave Road, Ventnor, Isle Of Wight
01 November — 01 January 2015
Delays likely Road closure
Works location: Ventnor: From Church Street To Park Avenue (Ml540151) : Belgrave Road-Ventnor:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Cc-Recon40%:U/H4, 40% Concrete Reconstruction And Seal Joints-Urban:H4) Ventno
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Staplers Road, Newport, Isle Of Wight
01 November — 01 January 2015
Delays likely Road closure
Works location: Newport: From Furrlongs To Long Lane (Ml210126) : Staplers Road-Newport:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Cc-Ul-Mandflexiand5%Recon:U/H1, ) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Hunnyhill, Newport, Isle Of Wight
01 November — 01 January 2015
Delays likely Road closure
Works location: Newport: From Crocker Street To Heytsbury Road (Ml220144) : Hunnyhill-Newport:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Cc-Ul-Mandflexiand5%Recon:R/H2, Resurface 40 Mm Ul-M 65psv With Flexiplast System And 5% Reconstrucion-Rural:H2) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Car Park Carisbrooke High Street, Carisbrooke, Isle Of Wight
01 November — 01 January 2015
Delays likely Road closure
Works location: Carisbrooke: Carisbrooke High Street Car Park (Cp013) : :; Stacey Terrett
Works description: Car Park Reconstruction, Planing And Resurfacing. (Cp-Recon:U/H4, Car Park – Full Reconstruction – 135mm Foambase, 25mm Ac6 Surface) Carisb
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Car Park Lane End, Bembridge, Isle Of Wight
01 November — 01 January 2015
Delays likely Road closure
Works location: Bembridge: Lane End Car Park (Cp046) : :; Stacey Terrett
Works description: Car Park Reconstruction, Planing And Resurfacing. (Cp-Stren:R/H4, Car Park – Strengthening Overlay – 60mm Foambase, 25mm Ac10 Surface) Bembri
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Fairmount Drive, Newport, Isle Of Wight
01 November — 01 January 2015
Delays likely Road closure
Works location: Newport: From Staplers Road To Mayfield Drive (Ml240279) : Fairmount Drive-Newport:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Cc-Recon:R/H4, Covered Concrete – F1 – Reconstruction 30mm Fibrovia And 130mm Foambase-Rural:H4) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

King James Close, Cowes, Isle Of Wight
01 November — 01 January 2015
Delays likely Road closure
Works location: Cowes: From Crossfield Avenue To End Of Public Highway (Ml160154) : King James Close-Cowes:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Cc-Recon40%:U/H4, ) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Ludbrook Way, Whitwell, Isle Of Wight
01 November — 01 January 2015
Delays likely Road closure
Works location: Whitwell: From Nettlecombe Lane To End Of Public Highway (Ml562218) : Ludbrook Way-Whitwell:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Cc-Recon20%:U/H4, 20% Concrete Reconstruction And Seal Joints-Urban:H4) Whitwe
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Meadow Close, Whitwell, Isle Of Wight
01 November — 01 January 2015
Delays likely Road closure
Works location: Whitwell: From Nettlecombe Lane To End Of Public Highway (Ml561218) : Meadow Close-Whitwell:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Cc-Recon40%:U/H4, 40% Concrete Reconstruction And Seal Joints-Urban:H4) Whitwe
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Nettlecombe Lane, Whitwell, Isle Of Wight
01 November — 01 January 2015
Delays likely Road closure
Works location: Whitwell: From High Street To 180 Metres Northeast Thereof (Ml540218) : Nettlecombe Lane-Whitwell:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Whitwe
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Ryde Road, Seaview, Isle Of Wight
01 November — 01 January 2015
Delays likely Road closure
Works location: Seaview: From Steyne Road To Seafield Road (Ml330105) : Ryde Road-Seaview:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Br-Stren:R/H3, Barell Cambered Roads – F1 – 100mm Channel Strengthen, Shaping And 30mm Fibrovia Surfac Course Overlay) Seavie
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

The Grove, Ventnor, Isle Of Wight
31 October — 29 November
Delays likely Road closure
Works location: Ventnor: From Alpine Road To End Of Public Highway (Ml542175) : The Grove-Ventnor:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Ventno
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Image: svensson under CC BY 2.0