Road Closed at Undercliff Drive

Roadworks and road closures: 28th January

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

A3054 Main Road, Ningwood, Shalfleet, Isle Of Wight
29 January — 02 February
Delays likely Traffic control (two-way signals)
Works location: From Jct Yarmouth Rd / Hamstead Rd To Jct A3054 / Elm Lane.
Works description: Start 08.00. Access To Bt Boxes Required To Recover Redundant Cable. 2 Way Rolling Traffic Lights Are Required. Pedestrian Barriers Will Be Used Where Applicable. No Work Will Take Place At Bus Stops Or Junctions. Work Will Take Place During Normal Working Hours . Work May Take Place Over The Weekend
nResponsibility for works: BT
Current status: Advanced planning

B3330 St Johns Road, Ryde, Isle Of Wight
29 January — 02 February
Delays likely Traffic control (Stop/Go boards)
Works location: Ryde: From High Street, East To St Johns Hill (Ml 310096 And Ml 310097): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install No 12 Lanterns (No 1 Column) 1 Neighbourhood Watch Signs, 11 Warning Signs, 1 Lit Amber Flashing Sign And 2 Lit Speed Activation Signs Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Madeira Road, Ventnor, Isle Of Wight
28 January — 10 February
Delays likely Road closure
Works location: From Junc Maderia Vale To O/S 46
Works description: Excavation Of Joint Bay In Road And Cable Trench To Provide New Electrical Supply To New Property Adj 25 Backfill And Reinstate
Responsibility for works: Southern Electric
Current status: Advanced planning

A3055 Church Road, Shanklin, Isle Of Wight
28 January — 30 January
Delays possible Some carriageway incursion
Works location: Old Thatch Tea Shop 4, Church Rd, Shanklin
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

A3055 Sandown Road, Lake, Isle Of Wight
29 January — 02 February
Delays possible Some carriageway incursion
Works location: 2f, Sandown Rd, Sandown
Works description: – Interim To Perm Reinstatment
Responsibility for works: Southern Water
Current status: Advanced planning

B3323 High Street, Newport, Isle Of Wight
28 January — 03 February
Delays possible Some carriageway incursion
Works location: O/S 32
Works description: Scaffold (B Ashton Scaffolding)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3401 Calbourne Road, Newport, Isle Of Wight
28 January — 30 January
Delays possible Traffic control (two-way signals)
Works location: Various Locations From Its Junc With Sun Hill With Apesdown Corpse.
Works description: Start 08.00. Access To Bt Boxes Required To Recover Redundant Cable. 2 Way Rolling Traffic Lights Are Required. Pedestrian Barriers Will Be Used Where Applicable. No Work Will Take Place At Bus Stops Or Junctions. Work Will Take Place During Working Hours . Some Work May Take Place Over The Weekend.
Responsibility for works: BT
Current status: Advanced planning

A3020 Victoria Avenue, Shanklin, Isle Of Wight
28 January — 30 January
Delays unlikely Some carriageway incursion
Works location: 24, Victoria Ave, Shanklin
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

A3054 Halletts Shute, Yarmouth, Isle Of Wight
29 January — 02 February
Delays unlikely No carriageway incursion
Works location: In Fw Os Treetops On, Halletts Shute
Works description: Erect/Renew 1 Pcp Cabinet And Base (600mm X 300mm X 1000mm),Install 1m Of 3 Poly Ducts In Verge
Responsibility for works: BT
Current status: Advanced planning

A3054 Union Street, Ryde, Isle Of Wight
28 January — 06 March
Delays unlikely Some carriageway incursion
Works location: O/S 44
Works description: Scaffold (B Ashton Scaffolding)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 School Green Road, Freshwater, Isle Of Wight
28 January — 05 February
Delays unlikely Some carriageway incursion
Works location: Opp 73 To Opp 93/95 , School Green Road
Works description: Install 131m Of 1 Way Poly Duct In Footway,Install 3m Of 1 Way Poly Duct In Carriageway
Responsibility for works: BT
Current status: Advanced planning

Alfred Street, Ryde, Isle Of Wight
28 January — 30 January
Delays unlikely Some carriageway incursion
Works location: 1
Works description: – Core Remedial Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

B3327 Newport Road, Ventnor, Isle Of Wight
29 January — 02 February
Delays unlikely Some carriageway incursion
Works location: 31, Newport Rd, Sandown
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

B3329 Albert Road, Sandown, Isle Of Wight
29 January — 02 February
Delays unlikely Some carriageway incursion
Works location: 20, Albert Rd, Sandown
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

B3329 Albert Road, Sandown, Isle Of Wight
29 January — 02 February
Delays unlikely Some carriageway incursion
Works location: 26, Albert Rd, Sandown
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

B3329 High Street, Sandown, Isle Of Wight
29 January — 04 February
Delays unlikely Some carriageway incursion
Works location: O/S 107
Works description: Scaffold (Sca Group)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3395 Sherbourne Street, Bembridge, Isle Of Wight
28 January — 30 January
Delays unlikely Some carriageway incursion
Works location: China China
Works description: – Core Remedial Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

B3399 Chale Street, Chale, Isle Of Wight
29 January — 02 February
Delays unlikely No carriageway incursion
Works location: In Soft Approx 50m North Of Yards Hollow Entrance, To Approx 48m North On,, Chale Street
Works description: Install 48m Of 1 Way Poly Duct In Verge
Responsibility for works: BT
Current status: Advanced planning

Brook Road, Shanklin, Isle Of Wight
28 January — 30 January
Delays unlikely Some carriageway incursion
Works location: 4, Brook Rd, Shanklin
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Brook Road, Shanklin, Isle Of Wight
28 January — 30 January
Delays unlikely Some carriageway incursion
Works location: 26, Brook Rd, Shanklin
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Queens Road, Freshwater, Isle Of Wight
29 January — 02 February
Delays unlikely Some carriageway incursion
Works location: Con Club
Works description: – Core Remedial Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Rectory Road, Niton, Isle Of Wight
29 January — 02 February
Delays unlikely No carriageway incursion
Works location: O/S Glebe House, Rectory Road
Works description: Erect/Renew 1 Pcp Cabinet And Base (600mm X 300mm X 1000mm),Install 3m Of 3 Poly Ducts In Footway
Responsibility for works: BT
Current status: Advanced planning

Atherfield Road, Shorwell, Isle Of Wight
29 January — 02 February
Delays unlikely No carriageway incursion
Works location: 35m South East From Eastdene To 56m East On , Atherfield Road
Works description: Install 56m Of 1 Way Poly Duct In Verge
Responsibility for works: BT
Current status: Advanced planning

Upton Road, Ryde, Isle Of Wight
28 January — 30 January
Delays unlikely Some carriageway incursion
Works location: 74, Upton Rd, Ryde, Po333hx
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Upton Road, Ryde, Isle Of Wight
28 January — 04 February
Delays unlikely Traffic control (give & take)
Works location: Os 6
Works description: Gsmr/Hse Cut Off – So35034
Responsibility for works: Southern Gas Networks Plc
Current status: Advanced planning

Cedar Drive, Shanklin, Isle Of Wight
28 January — 30 January
Delays unlikely Some carriageway incursion
Works location: 9 Cedar Drive, Shanklin, Isle Of Wight .
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Collingwood Road, Newport, Isle Of Wight
28 January — 30 January
Delays unlikely Some carriageway incursion
Works location: 6, Collingwood Rd, Newport, Po301qs
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Collingwood Road, Newport, Isle Of Wight
28 January — 30 January
Delays unlikely Some carriageway incursion
Works location: 25, Collingwood Rd, Newport, Po301qs
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Crescent Road, Shanklin, Isle Of Wight
28 January — 30 January
Delays unlikely Some carriageway incursion
Works location: 16 Crescent Road , Shanklin, Isle Of Wight.
Works description: – Install New Water Connections
Responsibility for works: Southern Water
Current status: Advanced planning

Culver Way, Sandown, Isle Of Wight
29 January — 02 February
Delays unlikely Some carriageway incursion
Works location: 54, Culver Way, Sandown
Works description: – Interim To Perm Reinmstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Firs Close, Cowes, Isle Of Wight
29 January — 09 February
Delays unlikely Traffic control (give & take)
Works location: Os 11
Works description: Relay Service From Farisde Footway To Site
Responsibility for works: Southern Gas Networks Plc
Current status: Advanced planning

Fitzroy Street, Sandown, Isle Of Wight
29 January — 02 February
Delays unlikely Some carriageway incursion
Works location: 6, Firs Court, Fitzroy St, Sandown
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Fitzroy Street, Sandown, Isle Of Wight
29 January — 02 February
Delays unlikely Some carriageway incursion
Works location: 47, Fitzroy St, Sandown
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Josephs Way, Shanklin, Isle Of Wight
28 January — 30 January
Delays unlikely Some carriageway incursion
Works location: 32, Josephs Way, Shanklin
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Lime Tree Court, Freshwater, Isle Of Wight
28 January — 02 February
Delays unlikely Some carriageway incursion
Works location: (Pcp7) Bduk. Opposite The Bluebell Cottage Crossing Carriage Way To Side Of The Old Mill House On Lime Tree Court
Works description: Install 5 Of 1 Way Power Duct In Verge,Install 5m Of 1 Way Power Duct In Carriageway,Performing An 1excavation To Expose Existing Power Cable In Verge.
Responsibility for works: BT
Current status: Advanced planning

Lower Limerstone Lane, Brighstone, Isle Of Wight
29 January — 02 February
Delays unlikely No carriageway incursion
Works location: In Soft Opp Heatherslade On, Lower Limerstone Lane
Works description: Install 2m Of 1 Way Poly Duct In Verge
Responsibility for works: BT
Current status: Advanced planning

Newport Footpath 179, Newport, Isle Of Wight
28 January — 29 January
Delays unlikely No carriageway incursion
Works location: In Footway 15m South Frm Jcn With High Street On, Newport Footpath 179
Works description: Locate And Excavate 1 Blockage In Existing Duct In Footway
Responsibility for works: BT
Current status: Advanced planning

Nunwell Street, Sandown, Isle Of Wight
29 January — 02 February
Delays unlikely Some carriageway incursion
Works location: 6, Nunwell St, Sandown
Works description: – Interim To Perm Reinstatment
Responsibility for works: Southern Water
Current status: Advanced planning

Orchard Street, Newport, Isle Of Wight
28 January — 04 February
Delays unlikely No carriageway incursion
Works location: (Pcp19) Bduk. Junction South Street On Orchard Street.
Works description: Install 3m Of 1 Way Power Duct In Footway,Performing An 1excavation To Expose Existing Power Cable In Footway.
Responsibility for works: BT
Current status: Advanced planning

Perowne Way, Sandown, Isle Of Wight
29 January — 02 February
Delays unlikely Traffic control (give & take)
Works location: Sandown: Link Footway In Front Of 154-146 Perowne Way (Ml F40667): Perowne Way-Sandown
Works description: Footway Re Construction And Surfacing (Fwl: Bit Slurry) Sandown
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Pier Street, Sandown, Isle Of Wight
29 January — 02 February
Delays unlikely Some carriageway incursion
Works location: Little Scamps 8, Pier St, Sandown
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Prior Crescent, Newport, Isle Of Wight
28 January — 30 January
Delays unlikely No carriageway incursion
Works location: Opp 1, Prior Crescent
Works description: Build 1 Concrete Chamber 1310mm X 610mm X 1265mm Deep In Footway,Demolish 1 Existing Jointbox(S) Or Cabinet Base(S)
Responsibility for works: BT
Current status: Advanced planning

Silver Trees, Shanklin, Isle Of Wight
28 January — 30 January
Delays unlikely Some carriageway incursion
Works location: 32, Silver Trees, Shanklin
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

St Georges Road, Shanklin, Isle Of Wight
29 January — 02 February
Delays unlikely Some carriageway incursion
Works location: 1 St. Georges Road , Shanklin, Isle Of Wight.
Works description: – Install New Water Connections
Responsibility for works: Southern Water
Current status: Advanced planning

Stroud Path, Freshwater, Isle Of Wight
29 January — 02 February
Delays unlikely Traffic control (give & take)
Works location: Freshwater: Link Footay Between Camp Road & Jubilee Close (Ml F60331): Stroud Path-Freshwater
Works description: Footway Re Construction And Surfacing (Fwl: Bit Partrecon) Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Tamar Close, Sandown, Isle Of Wight
29 January — 02 February
Delays unlikely Some carriageway incursion
Works location: 8, Tamar Cl, Sandown
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Taylor Road, Newport, Isle Of Wight
29 January — 02 February
Delays unlikely Traffic control (give & take)
Works location: Newport: Whole Length Of Road Running Beside Mothercare Unit (Ml 261225): Taylor Road-Newport
Works description: Footway Re Construction And Surfacing (Fwl: Bit Partrecon Fwr :Bit Partrecon) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Yaverland Close, Sandown, Isle Of Wight
29 January — 02 February
Delays unlikely Some carriageway incursion
Works location: 2 Yaverland Close, Sandown, Isle Of Wight.
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

York Road, Sandown, Isle Of Wight
29 January — 02 February
Delays unlikely Some carriageway incursion
Works location: Old Hire Centre, York Road , Sandown, Isle Of Wight
Works description: Install New Water Connections To New Developement.
Responsibility for works: Southern Water
Current status: Advanced planning

Youngwoods Copse, Newchurch, Isle Of Wight
28 January — 30 January
Delays unlikely Traffic control (give & take)
Works location: Newchurch: Whole Length Of Road From Hoolwood Road (Ml 440441): Youngwoods Copse-Newchurch
Works description: Footway Re Construction And Surfacing (Fwl: Bit Partrecon) Newchurch
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning