Bath Road roadworks signage

Roadworks and road closures: 15th April

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org
Roadworks

A3020 Blackwater Hollow, Newport, Isle Of Wight
15 April — 15 July
Delays likely Road closure
Works location: Newport: From 970m South Of Blacfkwater Road A Further 630m South (Ml410013): Blackwater Hollow-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H1, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H1) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Blackwater Hollow, Newport, Isle Of Wight
15 April — 15 July
Delays likely Road closure
Works location: Newport: From Blackwater Road 465m South (Ml410015): Blackwater Hollow-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1, Resurface 25mm Ul-M 65psv Channel Plane-Urban:H1) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Blackwater Hollow, Newport, Isle Of Wight
15 April — 15 July
Delays likely Road closure
Works location: Newport: From 470m South Of Blackwater Road A Further 500m South (Ml410014): Blackwater Hollow-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H1, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H1) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Blackwater Hollow, Newport, Isle Of Wight
15 April — 15 July
Delays likely Road closure
Works location: Newport: From Highwood Lane 570m North (Ml410012): Blackwater Hollow-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Sul-M:R/H1, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H1) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Blackwater Road, Newport, Isle Of Wight
15 April — 15 July
Delays likely Road closure
Works location: Newport: From Blackwater Hollow 250m North (Ml410016): Blackwater Road-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:U/H1, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Urban:H1) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Blackwater Road, Newport, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Newport: From 250m South Of Shide Road A Further 250m South (Ml410021): Blackwater Road-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H1) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Blackwater Road, Newport, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Newport: From 500m North Of Blackwater Hollow A Further 250m North (Ml 410018): Blackwater Road-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H1, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H1) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Blackwater Road, Newport, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Newport: From 500m South Of Shide Road A Further 250m South (Ml 410020): Blackwater Road-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H1) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Blackwater Road, Newport, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Newport: From 250m North Of Blackwater Hollow A Further 250 North (Ml 410017): Blackwater Road-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1, Resurface 25mm Ul-M 65psv Channel Plane-Urban:H1) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Blackwater Road, Newport, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Newport: From 750m North Of Blackwater Hollow A Further 250m North (Ml 410019): Blackwater Road-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H1, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H1) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Godshill Road, Shanklin, Isle Of Wight
15 April — 15 July
Delays likely Road closure
Works location: Shanklin: From 165m West Of Upper Hyde Road To Apse Manor Road (Ml 410007): Godshill Road-Shanklin
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H1, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H1) Shanklin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Newport Road, Godshill, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Godshill: From Worsley Road To Bow Bridge (Ml 510013): Newport Road-Godshill
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Cc-Ul-M&Seal:U/H1, Resurface 30mm Ul-M 65psv With Armour Screed Crack Repair And Proscreed Cut And Seal Joints-Urban:H1) Godshill
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Newport Road, Godshill, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Godshill: From Chequers Inn Road 300m South (Ml 510017): Newport Road-Godshill
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H1, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H1) Godshill
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Newport Road, Godshill, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Godshill: From 360m Northwest Of Bow Bridge A Further 250m Northwest (Ml 510015): Newport Road-Godshill
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H1, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H1) Godshill
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Newport Road, Godshill, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Godshill: From Bow Bridge 360m Northwest (Ml 510014): Newport Road-Godshill
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H1, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H1) Godshill
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Newport Road, Godshill, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Godshill: From West Street To Worsley Road (Ml 510012): Newport Road-Godshill
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1, Resurface 25mm Ul-M 65psv Channel Plane-Urban:H1) Godshill
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Newport Road, Godshill, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Godshill: From 610m Northwest Of Bow Bridge A Further 160m Northwest (Ml 510016): Newport Road-Godshill
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H1, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H1) Godshill
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Victoria Avenue, Shanklin, Isle Of Wight
15 April — 15 July
Delays likely Road closure
Works location: Shanklin: From 250m Northwest Of Peacock Close To 165mm West Of Upper Hyde Road (Ml 410006): Victoria Avenue-Shanklin
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H1, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Urban:H1) Shanklin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Victoria Avenue, Shanklin, Isle Of Wight
15 April — 15 July
Delays likely Road closure
Works location: Shanklin: From Peacock Close 250m Northwest (Ml 410005): Victoria Avenue-Shanklin
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:U/H1, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Urban:H1) Shanklin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Whiteley Bank, Ventnor, Isle Of Wight
15 April — 15 July
Delays likely Road closure
Works location: Ventnor: From Apse Manor Road 220m West (Ml 410008): Whiteley Bank-Ventnor
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H1, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H1) Ventnor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Whiteley Bank, Ventnor, Isle Of Wight
15 April — 15 July
Delays likely Road closure
Works location: Ventnor: From 220m West Of Apse Manor Road A Further 540m West (Ml 410009): Whiteley Bank-Ventnor
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H1, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H1) Ventnor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Whiteley Bank, Ventnor, Isle Of Wight
15 April — 15 July
Delays likely Road closure
Works location: Ventnor: From St Johns Road A Further 647m East (Ml410010): Whiteley Bank-Ventnor
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H1, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H1) Ventnor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Bonchurch Road, Shanklin, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Shanklin: From 500m North Of Access Road To Luccombe Chine House To Cowleaze Hill (Ml420026): Bonchurch Road-Shanklin
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:U/H2, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Urban:H2) Shanklin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Bonchurch Road, Shanklin, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Shanklin: From Access Road To Luccombe Chine House 500m North (Ml420025): Bonchurch Road-Shanklin
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:U/H2, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Urban:H2) Shanklin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Broadway, Sandown, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Sandown: From Melville Street To Station Avenue (Ml410047): Broadway-Sandown
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Sandown
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Cowleaze Hill, Shanklin, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Shanklin: From Bonchurch Road 420m Northwest (Ml 420027): Cowleaze Hill-Shanklin
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:H2, Resurface 25mm Ul-M 65psv Plus Regualting (Kerbed=Inlay/Unkerbed=Overlay)-Urban:H2) Shanklin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Argyll Place, Ryde, Isle Of Wight
15 April — 15 July
Delays likely Road closure
Works location: Ryde: From Argyll Street For Its Entire Length (Ml 360664): Argyll Place-Ryde
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3328 Queens Road, Shanklin, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Shanklin: From Palmerstone Road To Chine Avenue (Ml 430089): Queens Road-Shanklin
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Shanklin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3329 High Street, Sandown, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Sandown: From Victoria Road To Albert Road (Ml 420095): High Street-Sandown
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Sandown
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Long Lane, Newport, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Newport: From 1250m Southeast Of Southern Junction Of Buckberry Lane To Briddlesford Road (Ml 420110): Long Lane-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H2, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H2) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Long Lane, Newport, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Newport: From Southern Junction Of Buckberry Lane 700m Southeast (Ml 420108): Long Lane-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H2, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Rural:H2) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Long Lane, Newport, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Newport: From Staplers Road To Southern Junction Of Buckberry Lane (Ml 420107): Long Lane-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H2, Resurface 25mm Ul-M 65pssv Chanel Plane_Urban:H2) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Long Lane, Newport, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Newport: From 700m Southeast Of Southern Junction Of Buckberry Lane A Further 550m Southeast (Ml 420109): Long Lane-Newp
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Sul-M:R/H2, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H2) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Mersley Downs Road, Arreton, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Arreton: From Knighton Shute To Brading Down Road (Ml 410118): Mersley Downs Road-Arreton
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H1, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H1) Arreton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Mersley Downs Road, Arreton, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Arreton: From 1040m East Of Newport Shute To Lime Kiln Shute (Ml 410116): Mersley Downs Road-Arreton
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H1, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H1) Arreton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Mersley Downs Road, Arreton, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Arreton: From Newport Shute 540m East (Ml 410114): Mersley Downs Road-Arreton
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H1, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H1) Arreton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Mersley Downs Road, Arreton, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Arreton: From 540m East Of Newport Shute A Further 500m East (Ml 410115): Mersley Downs Road-Arreton
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H1, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H1) Arreton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Mersley Downs Road, Arreton, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Arreton: From Lime Kiln Shute To Knighton Shute (Ml 410117): Mersley Downs Road-Arreton
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1, Resurface 25mm Ul-M 65psv Channel Plane-Urban:H1)) Arreton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

High Street, Newchurch, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Newchurch: From Plamers Lane To The Shute (Ml 430124): High Street-Newchurch
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Newchurch
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Langbridge, Newchurch, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Newchurch: From Knighton Shute Lane 371m South (Ml 430127): Langbridge-Newchurch
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Newchurch
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Langbridge, Newchurch, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Newchurch: From The Shute 200m North (Ml 430126): Langbridge-Newchurch
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Newchurch
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

The Shute, Newchurch, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Newchurch: From High Street To Langbridge (Ml 430125): The Shute-Newchurch
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Newchurch
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Alverstone Shute, Newchurch, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Newchurch: From Youngwoods Way 530m Northeast (Ml 430138): Alverstone Shute-Newchurch
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65pv And 85mm Foambase-Rural:H3) Newchurch
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Regent Street, Shanklin, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Shanklin: From High Street To Carter Street (Ml 420163): Regent Street-Shanklin
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Cc-Ul-M&Seal:U/H2, Resurface 30mm Ul-M 65 Psv With Armour Screed Crack Repair And Proscreed Cut And Seal Joints-Urbanh2) Shanklin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Merstone Lane, Godshill, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Godshill: From Bury Lane To Chapel Lane (Ml 430158): Merstone Lane-Godshill
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H3, Resurface 25mm Ul-M 65psv Channel Plane_Urban:H3) Godshill
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Merstone Lane, Godshill, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Godshill: From Chapel Lane 590m North (Ml 430159): Merstone Lane-Godshill
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Godshill
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Merstone Lane, Godshill, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Godshill: From Bury Lane 550m South (Ml 430157): Merstone Lane-Godshill
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Godshill
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Merstone Lane, Godshill, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Godshill: From Sandown Road 284m South (Ml 430160): Merstone Lane-Godshill
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Godshill
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Culver Way, Sandown, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Sandown: From Meadow Close To Redcliff Close (Ml 440331): Culver Way-Sandown
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Cc-Recon40%:U/H4, 40% Concrete Reconstruction And Seal Joints-Urban:H4) Sandown
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Culver Way, Sandown, Isle Of Wight
16 April — 16 July
Delays likely Road closure
Works location: Sandown: From Redcliff Close To O/S No 54 (Ml 440332): Culver Way-Sandown
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Cc-Recon40%:U/H4, 40% Concrete Reconstruction And Seal Joints-Urban:H4) Sandown
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning