Road cones:

Roadworks and road closures: 23rd July 2015

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

C25 Fort Street, Sandown, Isle of Wight
24 July — 24 July
Delays likely due to Obstruction
Road closure at B3395 Culver Parade, Sandown, Isle of Wight (Sandown Childrens Carnival Procession.) 24 July — 24 July
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: Planned
Marsh Road, Gurnard, Isle Of Wight
24 July — 24 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Gurnar at Gurnard: From Rew Street To Lower Church Road (Ml130069) : Marsh Road-Gurnard:; Stacey Terrett
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Gunville Road, Carisbrooke, Isle Of Wight
23 July — 23 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H2, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Rural:H2) Carisb at Carisbrooke: From School Lane To Alvington Manor View (Ml220128): Gunville Road-Carisbrooke:; Eric Longworth
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Gunville Road, Carisbrooke, Isle Of Wight
23 July — 23 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren150:U/H2 Strengthen 25mm Ul-M 65psv And 125mm Hdm50-Urban:H2 (Kerbed=Inlay/Unkerbed=Overlay) Carisbrooke at Carisbrooke: From Ashey Lane 300m North (Ml 220131): Gunville Road-Carisbrooke
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Gunville Road, Carisbrooke, Isle Of Wight
23 July — 23 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren150:U/H2 Strengthen 25mm Ul-M 65psv And 125mm Hdm50-Urban:H2) Carisbrooke at Carisbrooke: From Alvington Manor View To Gunville West (Ml 220129): Gunville Road-Carisbrooke
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Gunville Road, Carisbrooke, Isle Of Wight
23 July — 23 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H2, Resurface 25mm Ul-M 65psv Plus Regulating(Kerbed=Inlay/Unkerbed=Overlay)-Rural:H2) Carisb at Carisbrooke: From Ash Lane To Gunville West (Ml220130): Gunville Road-Carisbrooke:; Eric Longworth
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Gunville Road, Carisbrooke, Isle Of Wight
23 July — 23 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H2, Resurface 25mm Ul-M 65psv Chammel Plane-Urban:H2 (Kerbed=Inlay/Unkerbed=Overlay) Carisbrooke at Carisbrooke: From Forest Road 300m South (Ml 220132): Gunville Road-Carisbrooke
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Priory Road, Carisbrooke, Isle Of Wight
23 July — 23 September Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Carisbrooke at Carisbrooke: From High Street To School Lane (Ml 240165): Priory Road-Carisbrooke
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Worsley Road, Gurnard, Isle Of Wight
23 July — 27 July Traffic control (Stop/Go boards)
Delays possible due to Streetworks
Install 4m Of 1 Way Poly Duct In Footway,Install 5m Of 1 Way Poly Duct In Verge,Install 8m Of 1 Way Poly Duct In Carriageway at O/S 49, Across C/W, To Cnr Of 50, Worsley Road
Responsibility: BT
EToN status: Advanced planning

A3055 George Street, Ryde, Isle Of Wight
23 July — 29 July Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (Island Roads) at O/S 5
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 High Street, Ventnor, Isle Of Wight
24 July — 30 July No carriageway incursion
Delays unlikely due to Streetworks
Install 2m Of 1 Way Power Duct In Footway,Performing An 1excavation To Expose Existing Power Cable In Footway at Outside Telephone Exchange, High Street
Responsibility: BT
EToN status: Advanced planning

A3056 Hale Common, Arreton, Isle Of Wight
24 July — 06 August No carriageway incursion
Delays unlikely due to Streetworks
312077 Shanklin 18 – Street Cabinet & Power Installation. Excavate To Lay Approx 12m Bt Ducts, Lay Concrete Plinth, Stand Cab. Excavate To Expose Low Voltage Cable For Power Connection And Lay Approx 55m Duct. Power Engineer To Carry Out Inspection Prior To Jointing. Power Jointing Team To Insert Cable And Execute Jointing Works. Reinstate, Check And Clear Site. at Nr Jctn Of Hale Common & Arreton Bridleway
Responsibility: BT
EToN status: Advanced planning

Alvington Manor View, Carisbrooke, Isle Of Wight
24 July — 03 August Traffic control (give & take)
Delays unlikely due to Streetworks
Gsmr/Hse Cut Off So43748 at Os 41
Responsibility: SGN
EToN status: Advanced planning

B3329 High Street, Sandown, Isle Of Wight
23 July — 27 July No carriageway incursion
Delays unlikely due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (2285mm X 680mm) In Carriageway at O/S 62, High Street
Responsibility: BT
EToN status: Advanced planning

Gills Cliff Road, Ventnor, Isle Of Wight
23 July — 31 July Traffic control (give & take)
Delays unlikely due to Streetworks
Lay New Service From Nearside Carriageway To Site at Os 100
Responsibility: SGN
EToN status: Advanced planning

West Street, Godshill, Isle Of Wight
24 July — 06 August No carriageway incursion
Delays unlikely due to Streetworks
313275 Godshill 1 – Street Cabinet & Power Installation. Excavate To Lay Approx 6mbt Ducts, Lay Concrete Plinth, Stand Cab. Excavate To Expose Low Voltage Cable For Power Connection And Lay Approx 0.4m Duct. Power Engineer To Carry Out Inspection Prior To Jointing. Power Jointing Team To Insert Cable And Execute Jointing Works. Reinstate, Check And Clear Site. at S/O Tree Tops West Street Godshill
Responsibility: BT
EToN status: Advanced planning

Park Way, Newchurch, Isle Of Wight
24 July — 29 July Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing ( Fwl: Bit Partrecon Fwr: Bit Partrecon) Newchurch at Newchurch: Whole Length Of Road From Woods Drive (Ml 462437): Park Way-Newchurch
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Pine Tree Close, Cowes, Isle Of Wight
23 July — 27 July Some carriageway incursion
Delays unlikely due to Streetworks
– Fit New Meter Installation In Footway. at 8 Pine Tree Close, Cowes, Isle Of Wight.
Responsibility: Southern Water
EToN status: Advanced planning

St James Close, East Cowes, Isle Of Wight
23 July — 27 July Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Reconstruction And Surfacing (Fwl: Bit Fullrecon Fwr: Bit Partrecon) East Cowes at East Cowes: Whole Length Of Footway From Oak Tree Way (Ml 163290): St James Close-East Cowes
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Union Road, Ryde, Isle Of Wight
24 July — 21 August Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (Island Scaffold) at O/S Hawk House
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Winchester Close, Newport, Isle Of Wight
24 July — 03 August No carriageway incursion
Delays unlikely due to Streetworks
Lay New Service From Nearside Footway To Site at Os The Annex No 10
Responsibility: SGN
EToN status: Advanced planning

Woods Drive, Newchurch, Isle Of Wight
24 July — 29 July Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing ( Fwl: Bit Partrecon Fwr: Bit Partrecon) Newchurch at Newchurch: From Alverstone Road 200m West (Ml 440439): Woods Drive-Newchurch
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Image: Hills_Alive under CC BY 2.0