Roadworks traffic light (Cowleaze)

Isle of Wight roadworks and road closures: 1st September 2015

Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

A3020 Newport Road, Godshill, Isle Of Wight
02 September — 02 November Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H1, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H1) Godshill at Godshill: From 360m Northwest Of Bow Bridge A Further 250m Northwest (Ml 510015): Newport Road-Godshill
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3020 Newport Road, Godshill, Isle Of Wight
02 September — 02 November Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Cc-Ul-M&Seal:U/H1, Resurface 30mm Ul-M 65psv With Armour Screed Crack Repair And Proscreed Cut And Seal Joints-Urban:H1) Godshill at Godshill: From Worsley Road To Bow Bridge (Ml 510013): Newport Road-Godshill
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3020 Newport Road, Godshill, Isle Of Wight
02 September — 02 November Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H1, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H1) Godshill at Godshill: From Bow Bridge 360m Northwest (Ml 510014): Newport Road-Godshill
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3020 Newport Road, Godshill, Isle Of Wight
02 September — 02 November Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:U/H1 Resurface 25mm Ul-M 65psv Plus Regulating-Urban:H1 (Kerbed=Inlay/Unkerbed=Overlay) Godshill at Godshill: From Chequers Inn Road 260m Northwest (Ml 510018): Newport Road-Godshill
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3020 Newport Road, Godshill, Isle Of Wight
02 September — 02 November Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H1, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H1) Godshill at Godshill: From Chequers Inn Road 300m South (Ml 510017): Newport Road-Godshill
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3020 Newport Road, Godshill, Isle Of Wight
02 September — 02 November Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H1, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H1) Godshill at Godshill: From 610m Northwest Of Bow Bridge A Further 160m Northwest (Ml 510016): Newport Road-Godshill
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3020 Newport Road, Godshill, Isle Of Wight
02 September — 02 November Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1, Resurface 25mm Ul-M 65psv Channel Plane-Urban:H1) Godshill at Godshill: From West Street To Worsley Road (Ml 510012): Newport Road-Godshill
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Marlborough Road, Ryde, Isle Of Wight
01 September — 01 November Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1) Ryde at Ryde: From Great Preston Road Heading North To Salisbury Road (Ml 310051): Marlborough Road-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Marlborough Road, Ryde, Isle Of Wight
01 September — 01 November Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1) Ryde at Ryde: From Salisbury Road Heading North To Somerset Road (Ml 310052): Marlborough Road-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Marlborough Road, Ryde, Isle Of Wight
01 September — 01 November Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1) Ryde at Ryde: From Somerset Road Heading North To Arundel Road (Ml 310053): Marlborough Road-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Marlborough Road, Ryde, Isle Of Wight
01 September — 01 November Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1) Ryde at Ryde: From Arundel Road Heading North To Appley Road (Ml 310054): Marlborough Road-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Sandown Road, Lake, Isle Of Wight
01 September — 03 September Traffic control (give & take)
Delays likely due to Streetworks
Replacement Of N? 1 Sign Post & N? 1 Attached Sign (N? 1 External Light) Lake at Lake: Opposite Winchester House (Ml 410039):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3321 Adelaide Grove, East Cowes, Isle Of Wight
02 September — 02 November Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3 Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3 (Kerbed=Inlay/Unkerbed=Overlay) East Cowes at East Cowes: From Victoria Grove To Yarborough Road (Ml 130076): Adelaide Grove-East Cowes
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3321 Adelaide Grove, East Cowes, Isle Of Wight
02 September — 02 November Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Cc-Recon20%:U/H4 20% Concrete Reconstruction And Seal Joints-Urban:H4 (Kerbed=Inlay/Unkerbed=Overlay) East Cowes at East Cowes: From Falcon Road To Yarborough Road (Ml 140077): Adelaide Grove-East Cowes
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3321 Adelaide Grove, East Cowes, Isle Of Wight
02 September — 02 November Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Fibrovia:U/H4 Resurface 30mm Fibrovia Plus Regulating/Patching (Kerbed=Inlay/Unkerbed=Overlay)-Urban:H4) East Cowes at East Cowes: From Falcon Road To York Avenue (Ml 140078): Adelaide Grove-East Cowes
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3323 Carisbrooke Road, Newport, Isle Of Wight
01 September — 04 September Traffic control (two-way signals)
Delays likely due to Streetworks
There Is A Concrete Beam Behind This Wall That Supports The Vertical Parapet Railing Posts. This Has Been Cracked And Has Now Displaced Vertically.The Concrete Is To Be Carefully Broken Out And Re-Cast, This Will Require The Re-Aligning The Leaning Metal Railing Posts. A Section Of The Stone Masnry Wall Is Leaning Into The Carriageway It Is To Be Carefully Removed And Re-Built, The Existing Stone And Engineering Bullnose Brick Coppings Are To Be Carefully Cleaned And Re-Used In The Rebuild. A Co at Newport: Retaining Wall – Primary: Carisbrooke Road—Carisbrooke Road-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3323 Carisbrooke Road, Newport, Isle Of Wight
02 September — 02 November Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Surfacing (Ff-Ul-M:U/H3, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Urban: H3) Newpor at Newport: From Wellington Road To Trafalga Road (Ml 210073): Carisbrooke Road-Newport:; Cw Cip Scheme Cw Cip Scheme
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3325 Nodes Road, Northwood, Isle Of Wight
02 September — 02 October Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1 Resurface 25mm Ul-M 65psv Channel Plane-Urban:H1) (Kerbed=Inlay/Unkerbed=Overlay) Northwood at Northwood: From Cranleigh Gardens To Pallance Road (Ml 110041): Nodes Road-Northwood
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3325 Nodes Road, Northwood, Isle Of Wight
02 September — 02 October Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:U/H1 Resurface 25mm Ul-M 65psv Plus Regulating-Urban:H1 (Kerbed=Inlay/Unkerbed=Overlay) Northwood at Northwood: From Newport Road To Venner Avenue (Ml 110039): Nodes Road-Northwood
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3325 Nodes Road, Northwood, Isle Of Wight
02 September — 02 October Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1 Resurface 25mm Ul-M 65psv Channel Plane-Urban:H1) (Kerbed=Inlay/Unkerbed=Overlay) Northwood at Northwood: From Venner Avenue To Cranleigh Gardens (Ml 110040): Nodes Road-Northwood
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Atherfield Road, Shorwell, Isle Of Wight
01 September — 01 November Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4 (Kerbed=Inlay/Unkerbed=Overlay) Shorwell at Shorwell: From 688m Northwest Of Southdown A Further 580m Northwest (Ml 640317): Atherfield Road-Shorwell
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Atherfield Road, Shorwell, Isle Of Wight
01 September — 01 November Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Fibrovia:R/H4, Resurface 30mm Fibrovia Plus Regulating/Patching-Rural:H4 (Kerbed=Inlay/Unkerbed=Overlay) Shorwell at Shorwell: From A Point 478m From Entrance To Ash Hill Farm A Further 486m East Then South (Ml 640315): Atherfield Road-S
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Atherfield Road, Shorwell, Isle Of Wight
01 September — 01 November Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4 (Kerbed=Inlay/Unkerbed=Overlay) Shorwell at Shorwell: From Junction Of New Road/Park Lane To Dungewood Lane (Ml640312): Atherfield Road-Shorwell
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Atherfield Road, Shorwell, Isle Of Wight
01 September — 01 November Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4 (Kerbed=Inlay/Unkerbed=Overlay) Shorwell at Shorwell: From Dungewood Lane To The Entrance Of Ash Hill Farm (Ml 640313): Atherfield Road-Shorwell
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Atherfield Road, Shorwell, Isle Of Wight
01 September — 01 November Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Fibrovia:R/H4, Resurface 30mm Fibrovia Plus Regulating/Patching-Rural:H4 (Kerbed=Inlay/Unkerbed=Overlay) Shorwell at Shorwell: From Entrance To Ash Hill Farm Approx 478m Southwest, South, Then East 9ml 640314): Atherfield Road-Shorwell
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Atherfield Road, Shorwell, Isle Of Wight
01 September — 01 November Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4 (Kerbed=Inlay/Unkerbed=Overlay) Shorwell at Shorwell: From1154m West Of Southdown A Further 500m Northwest (Ml 640316): Atherfield Road-Shorwell
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3021 York Avenue, East Cowes, Isle Of Wight
01 September — 03 September Some carriageway incursion
Delays possible due to Streetworks
– Install New Connections at 9a York Ave East Cowes Isle Of Wight I
Responsibility: Southern Water
EToN status: Advanced planning

A3054 Fairlee Road, Newport, Isle Of Wight
01 September — 03 September Some carriageway incursion
Delays possible due to Streetworks
Universal Water Metering Programme at 57 Fairlee Rd Newport Isle Of Wight Iw
Responsibility: Southern Water
EToN status: Advanced planning

A3054 Fairlee Road, Newport, Isle Of Wight
01 September — 03 September Some carriageway incursion
Delays possible due to Streetworks
Universal Water Metering Programme at 408 Fairlee Rd Newport Isle Of Wight I
Responsibility: Southern Water
EToN status: Advanced planning

A3055 Blackgang Road, Niton, Isle Of Wight
02 September — 15 September Traffic control (multi-way signals)
Delays possible due to Streetworks
Build 1 Concrete Chamber 915mm X 445mm X 965mm Deep In Footway,Install 60m Of 1 Way Poly Duct In Verge,Install 8m Of 1 Way Poly Duct In Carriageway at 55m West Of Jnc Blackgang Old Road, Jnc Blackgang Old Road On, Blackgang Road
Responsibility: BT
EToN status: Advanced planning

A3055 School Green Road, Freshwater, Isle Of Wight
01 September — 10 September Traffic control (two-way signals)
Delays possible due to Streetworks
Lay New Services From Farside Carriageway To Site at Os 106
Responsibility: SGN
EToN status: Advanced planning

B3323 Pyle Street, Newport, Isle Of Wight
02 September — 11 September Some carriageway incursion
Delays possible due to Streetworks
– Install New Water Connection In Pyle Street at Smart House, Castlehold Lane, Newport ,Iow.
Responsibility: Southern Water
EToN status: Advanced planning

B3399 Main Road, Brighstone, Isle Of Wight
01 September — 03 September Traffic control (two-way signals)
Delays possible due to Streetworks
Brighstone Tm Required To Allow Bt Desilting And Cabling To Take Place. at 30m North Of The Junction With Chilton Lane, Main Road
Responsibility: BT
EToN status: Advanced planning

Blackgang Old Road, Chale, Isle Of Wight
02 September — 15 September Traffic control (multi-way signals)
Delays possible due to Streetworks
Build 1 Concrete Chamber 915mm X 445mm X 965mm Deep In Footway,Install 10m Of 1 Way Poly Duct In Carriageway,Install 5m Of 1 Way Poly Duct In Footway,Install 60m Of 1 Way Poly Duct In Verge. at Jnc Blackgang Road, Jnc Chale Footpath 12, And Opp To O/S Ashore Cafe, Blackgang Old Road
Responsibility: BT
EToN status: Advanced planning

Bullen Road, Nettlestone, Isle Of Wight
01 September — 04 September Traffic control (two-way signals)
Delays possible due to Streetworks
Supply And Bed 1 X New Gully Frame And Cover To Replace Worn. Tm=2 X Way Temp Lights Nettlestone at Nettlestone: Between Pondwell Junction And Made On The Wight (Opp Lay By): Bullen Road-Nettlestone – 1620
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Kemming Road, Whitwell, Isle Of Wight
01 September — 03 September Traffic control (two-way signals)
Delays possible due to Streetworks
Surfacing Preparatory Work Replacing And Relaying Kerbs Whitwell at Whitwell: From Junction With Kingates Lane, 334m East (Ml 530122): Kemming Road-Whitwell
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Canteen Road, Newchurch, Isle Of Wight
02 September — 04 September Traffic control (multi-way signals)
Delays possible due to Streetworks
Cleanse Gully/ Free Up From Weeds Newchurch at Newchurch: O/S Property Called The Beeches: Canteen Road-Newchurch – 2256
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Newnham Road, Binstead, Isle Of Wight
02 September — 04 September Traffic control (two-way signals)
Delays possible due to Streetworks
Minor Excavation To Repair Loose Cover And Frame In Carriageway at Outside 22
Responsibility: Isle of Wight Cable And Telephone Co Ltd
EToN status: Advanced planning

Chale Footpath 12, Chale, Isle Of Wight
02 September — 15 September Traffic control (multi-way signals)
Delays possible due to Streetworks
Build 1 Concrete Chamber 915mm X 445mm X 965mm Deep In Footway,Install 40m Of 1 Way Poly Duct In Verge. at Jnc Blackgang Old Road To 40m South Of Jnc Blackgang Old Road On, Chale Footpath 12
Responsibility: BT
EToN status: Advanced planning

A3054 Union Street, Ryde, Isle Of Wight
02 September — 15 September Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (Sca Group/Acces Scaffold) at O/S Beachcomber On Corner With Castle Street.
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Afton Road, Freshwater, Isle Of Wight
02 September — 04 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at Blue Pines & Greensleeves Afton Rd Freshwater Isle Of
Responsibility: Southern Water
EToN status: Advanced planning

A3055 Avenue Road, Freshwater, Isle Of Wight
01 September — 03 September Traffic control (give & take)
Delays unlikely due to Streetworks
Non Invasive Survey Of Sewer Network Under Give And Take Nil Excavation at Between Jcn Of High Street And Princes Road
Responsibility: Southern Water
EToN status: Advanced planning

A3055 High Street, Ventnor, Isle Of Wight
01 September — 07 September Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (Sca Group/Access Scaffolding) at O/S Distinctive Designs, 74
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 School Green Road, Freshwater, Isle Of Wight
01 September — 03 September Traffic control (give & take)
Delays unlikely due to Streetworks
Non Invasive Survey Of Sewer Network Under Give And Take Nil Excavation at From O/S 147 To O/S Vine Pub
Responsibility: Southern Water
EToN status: Advanced planning

B3320 Bridge Road, Cowes, Isle Of Wight
02 September — 04 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at 2 Bridge Rd Cowes Isle Of Wight Iw
Responsibility: Southern Water
EToN status: Advanced planning

B3321 Clarence Road, East Cowes, Isle Of Wight
01 September — 03 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at 121 Clarence Rd East Cowes Isle Of Wig
Responsibility: Southern Water
EToN status: Advanced planning

B3325 Park Road, Cowes, Isle Of Wight
01 September — 09 September Traffic control (give & take)
Delays unlikely due to Streetworks
Relay Service From Farside Carriageway To Site at Os 93
Responsibility: SGN
EToN status: Advanced planning

B3325 Terminus Road, Cowes, Isle Of Wight
02 September — 04 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at 4 Terminus Rd Cowes Isle Of Wight Iw
Responsibility: Southern Water
EToN status: Advanced planning

B3329 High Street, Sandown, Isle Of Wight
01 September — 03 September Traffic control (give & take)
Delays unlikely due to Streetworks
Replacement Of N? 1 Sign Post & N? 1 Attached Sign (N? 1 External Light) Sandown at Sandown: Opposite The Junction Of Albion Road (Ml 420095):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3329 High Street, Sandown, Isle Of Wight
01 September — 21 September Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (Ace Scaffold) at O/S 79
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning