Roadworks signs

Isle of Wight roadworks and road closures 27th September 2016

Isle of Wight roadworks or road closures starting today or tomorrow.

Information provided by Elgin via Roadworks.org. It covers work carried out by BT, utility companies and Island roads.

Streetworks / Licence, Streetworks
Resurfacing of the carriageway Post works to kerbs, access, drainage, utility covers and frames and lining
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Newport Road
Location: at A3056 Newport Road, Apse Heath, Isle of Wight (Newport Road)
27 September — 19 October
Diversion route
Name: Diversion
Location: at A3056 Newport Road, Apse Heath, Isle of Wight (Diversion)
27 September — 19 October
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: In progress

Streetworks / Licence, Streetworks
CARRIAGEWAY RESURFACING SCHEME
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Nelson Road
Location: at Nelson Road, Newport, Isle of Wight (Nelson Road)
28 September — 30 September
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: Planned

Streetworks / Licence, Streetworks
Carriageway Repairs
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Saint Lawrence Shute
Location: at St Lawrence Shute, Whitwell, Isle of Wight (Saint Lawrence Shute)
27 September — 29 September
Diversion route
Name: Diversion
Location: at St Lawrence Shute, Whitwell, Isle of Wight (Diversion)
27 September — 29 September
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: In progress

A3056 Newport Road, Apse Heath, Isle Of Wight
27 September — 19 October
Delays likely Road closure
Works location: Apse Heath: (Ml 410081) From Ninham Country Holidays To Scotchells Brook Lane: Newport Road-Apse Heath
Works description: Carriageway Resurfacing Scheme: Resurfacing Of The Carriageway Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining Apse Heath
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3056 Newport Road, Apse Heath, Isle Of Wight
27 September — 19 October
Delays likely Road closure
Works location: Apse Heath: (Ml 410080) From Honnor & Jeffrey To 260 Metres East To Ninham Country Holidays : Newport Road-Apse Heath
Works description: Carriageway Resurfacing Scheme: Resurfacing Of The Carriageway Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining Apse Heath
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3056 Newport Road, Apse Heath, Isle Of Wight
27 September — 19 October
Delays likely Road closure
Works location: Apse Heath: Ml 410079 From Dalverton Garden Nursery To A Point 290 Metres West: Newport Road-Apse Heath
Works description: Carriageway Resurfacing Scheme Inclusive Of: Preparatory Works Such As Kerbing, Drainage, Reinstatement Of Access, Quartering, Duct Trenches Etc. Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining Works Will Be An Estimated 4 – 10 Nights (Weather Dependant) Within A 2 Month Period Apse Heath
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3056 Newport Road, Apse Heath, Isle Of Wight
27 September — 19 October
Delays likely Road closure
Works location: Apse Heath: (Ml 410078) From 250 Metres To 550 Metres East Of The Junction To Ventnor Road: Newport Road-Apse Heath
Works description: Carriageway Resurfacing Scheme: Resurfacing Of The Carriageway Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining Apse Heath
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3056 Newport Road, Apse Heath, Isle Of Wight
27 September — 19 October
Delays likely Road closure
Works location: Apse Heath: Ml 410082 From Lake Industrial Way To Scotchells Brook Lane: Newport Road-Apse Heath
Works description: Carriageway Resurfacing Scheme Inclusive Of: Preparatory Works Such As Kerbing, Drainage, Reinstatement Of Access, Quartering, Duct Trenches Etc. Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining Works Will Be An Estimated 4-10 Nights (Weather Dependant) Within A 2 Month Period Apse Heath
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Morton Road, Brading, Isle Of Wight
28 September — 30 September
Delays likely Traffic control (two-way signals)
Works location: O/S The Paddocks
Works description: Th5 For Ground Investigations And To Locate Existing Water Mains And Services As Part Of The Morton Road Water Mains Renewal Scheme
Responsibility for works: Southern Water
Current status: Advanced planning

Nelson Road, Newport, Isle Of Wight
28 September — 30 September
Delays likely Road closure
Works location: Newport: Ml 240316 From Trafalgar Road To Collingwood Road: Nelson Road-Newport
Works description: Carriageway Resurfacing Scheme Inclusive Of: Preparatory Works Such As Kerbing, Drainage, Reinstatement Of Access, Quartering, Duct Trenches Etc. Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining. Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Nelson Road, Newport, Isle Of Wight
28 September — 30 September
Delays likely Road closure
Works location: Newport: Ml 240318 Between Collingwood Road And Linden Road: Nelson Road-Newport
Works description: Carriageway Resurfacing Scheme Inclusive Of: Preparatory Works Such As Kerbing, Drainage, Reinstatement Of Access, Quartering, Duct Trenches Etc. Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining. Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Redhill Lane, Wroxall, Isle Of Wight
28 September — 28 September
Delays likely Road closure
Works location: Wroxall: Whole Length Of Road: Redhill Lane-Wroxall
Works description: Hedge Cutting Prior To Surfacing Works Wroxall
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

St Lawrence Shute, Whitwell, Isle Of Wight
27 September — 29 September
Delays likely Road closure
Works location: Whitwell: Between The Road Narrows Half Way Down The Hill And The Jnc With Severn Sisters Road: St Lawrence Sh
Works description: C/W Pot Holes Require Filling. 0.3 X 0.3 X 30mm, 0.3 X 0.2 X 30mm, 1.6 X 0.3 X 30mm, 1.0 X 0.5 X 40mm, 0.8 X 0.5 X 40mm, 0.8 X 0.5 X 50mm, 0.6 X 0.4 X 30mm, 0.5 X 0.3 X 25mm, 0.3 X 0.2 X 24mm, 0.7 X 0.5 X 25mm
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

St Lawrence Shute, Whitwell, Isle Of Wight
27 September — 29 September
Delays likely Road closure
Works location: Whitwell: St Lawrence Shute From The Whitwell Road Jnc To Just Past The Souther Water Works.: St Lawrence Shut
Works description: C/W Pot Holes Require Filling 0.3 X 0.3 X 30mm, 0.4 X 0.3 X 30mm, 0.4 X 0.3 X 30mm, 0.6 X 0.4 X 35mm, 0.5 X 0.5 X 45mm, 0.3 X 0.2 X 25mm, 1.0 X 0.4 X 35mm, 0.5 X 0.5 X 35mm, 1.1 X 0.5 X 45mm, 0.6 X 0.5 X 30mm, 0.6 X 0.5 X 30mm, 0.6 X 0.5 X 40mm, 0.6 X 0.4 X 40mm, 1.0 X 0.4 X 35mm, 0.4 X 0.3 X 30mm, 1.2 X 0.4 X 35mm, 0.4 X 0.4 X 30mm, 0.2 X 0.2 X 30mm. Tm – Ds Advices Possible Road Closure. (Cw: Pothole) Whitwell
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

St Johns Road, Wroxall, Isle Of Wight
28 September — 30 September
Delays possible Traffic control (two-way signals)
Works location: Worsley, St. Johns Rd, Wroxall, Ventnor
Works description: Remedial Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Alum Bay New Road, Totland, Isle Of Wight
27 September — 29 September
Delays unlikely No carriageway incursion
Works location: In The Verge At The Jcn With Cliff Road
Works description: These Works Are For The Excavation And Installation Of A New Cabinet To Include Associated Ducting & A Trial Hole To Assess The Suitability Of New Telecoms Mast
Responsibility for works: Orange PCS Ltd
Current status: Advanced planning

Clarence Road, Newport, Isle Of Wight
28 September — 06 October
Delays unlikely Some carriageway incursion
Works location: Os 24
Works description: Relay Service From Nearside Footway To Site
Responsibility for works: SGN
Current status: Advanced planning

Clarendon Close, Brading, Isle Of Wight
27 September — 29 September
Delays unlikely Some carriageway incursion
Works location: O/S No 8
Works description: Th2 For Ground Investigations And To Locate Existing Water Mains And Services As Part Of The Morton Road Water Mains Renewal Scheme
Responsibility for works: Southern Water
Current status: Advanced planning

Garfield Road, Ryde, Isle Of Wight
28 September — 04 October
Delays unlikely Some carriageway incursion
Works location: O/S 9 Garfield Road, Ryde
Works description: Skip
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Hadrians Way, Brading, Isle Of Wight
27 September — 29 September
Delays unlikely Some carriageway incursion
Works location: O/S No 1
Works description: Th4 For Ground Investigations And To Locate Existing Water Mains And Services As Part Of The Morton Road Water Mains Renewal Scheme
Responsibility for works: Southern Water
Current status: Advanced planning

High Street, Ryde, Isle Of Wight
28 September — 11 October
Delays unlikely Some carriageway incursion
Works location: 112-113 High Street, Ryde Po33 2sz
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Hunnycross Way, Newport, Isle Of Wight
27 September — 29 September
Delays unlikely No carriageway incursion
Works location: Newport: At The Junction Of Riverway & Hunnycross Way (Ml 220148): J/O Riverway R/A
Works description: Replacement Of No 1 Sign (1 X Roundabout) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Little London, Newport, Isle Of Wight
27 September — 29 September
Delays unlikely No carriageway incursion
Works location: Newport: At The Junction Of Sea Street & Little London (Ml 240282): J/O Sea St No Entry
Works description: Replacement Of No 1 Sign (1 X No Entry) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Little London, Newport, Isle Of Wight
27 September — 29 September
Delays unlikely No carriageway incursion
Works location: Newport: At The Junction Of Sea Street & Little London (Ml 240282): J/O Sea St No Entry
Works description: Replacement Of No 1 Sign (1 X No Entry) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Lugley Street, Newport, Isle Of Wight
28 September — 30 September
Delays unlikely No carriageway incursion
Works location: Newport: From The Junction Of Mill Street, East To Chain (Ml 240230): Opp No 29a No Entry
Works description: Replacement Of N� 1 Sign (1 X No Entry) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Lugley Street, Newport, Isle Of Wight
28 September — 30 September
Delays unlikely No carriageway incursion
Works location: Newport: From The Junction Of Mill Street, East To Chain (Ml 240230): J/O Mill St N/E
Works description: Replacement Of N� 1 Sign (1 X No Entry) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Lugley Street, Newport, Isle Of Wight
28 September — 30 September
Delays unlikely No carriageway incursion
Works location: Newport: From The Junction Of Mill Street, East To Chain (Ml 240230): O/S No 29a No Entry
Works description: Replacement Of N� 1 Sign (1 X No Entry) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Lugley Street, Newport, Isle Of Wight
28 September — 30 September
Delays unlikely No carriageway incursion
Works location: Newport: From The Junction Of Mill Street, East To Chain (Ml 240230): O/S No 29a Give Way
Works description: Replacement Of N� 1 Sign (1 X Give Way) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Melville Street, Ryde, Isle Of Wight
28 September — 25 October
Delays unlikely Some carriageway incursion
Works location: 12 Melville Street Ryde
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Mill Hill Road, Cowes, Isle Of Wight
28 September — 28 September
Delays unlikely Some carriageway incursion
Works location: O/S 43
Works description: Crane
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Mill Street, Newport, Isle Of Wight
28 September — 30 September
Delays unlikely No carriageway incursion
Works location: Newport: From The Junction With Crocker Street, South To High Street (Ml 240167): J/O Crocker St On Col N/E
Works description: Replacement Of No 1 Sign (1 X No Entry) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Mill Street, Newport, Isle Of Wight
28 September — 30 September
Delays unlikely No carriageway incursion
Works location: Newport: From The Junction With Crocker Street, South To High Street (Ml 240167): J/O Lugley St N/E
Works description: Replacement Of No 1 Sign (1 X No Entry) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Mill Street, Newport, Isle Of Wight
28 September — 30 September
Delays unlikely No carriageway incursion
Works location: Newport: From The Junction With Crocker Street, South To High Street (Ml 240167): Side Of Travelodge Nrt
Works description: Replacement Of No 1 Sign (1 X No Right Turn) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Mill Street, Newport, Isle Of Wight
28 September — 30 September
Delays unlikely No carriageway incursion
Works location: Newport: From The Junction With Crocker Street, South To High Street (Ml 240167): O/S No 7b Nrt
Works description: Replacement Of No 1 Sign (1 X No Right Turn) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Morton Old Road, Brading, Isle Of Wight
28 September — 30 September
Delays unlikely Some carriageway incursion
Works location: O/S Downs Way
Works description: Th3 For Ground Investigations And To Locate Existing Water Mains And Services As Part Of The Morton Road Water Mains Renewal Scheme
Responsibility for works: Southern Water
Current status: Advanced planning

The Green, Cowes, Isle Of Wight
28 September — 30 September
Delays unlikely Traffic control (give & take)
Works location: Cowes: From Junction With Churchill Road, M L 160349, 85m: The Green-Cowes
Works description: Footway Re Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Watergate Road, Newport, Isle Of Wight
27 September — 10 October
Delays unlikely Some carriageway incursion
Works location: O/S 2
Works description: Excavation In Carriageway For New Electric Supply
Responsibility for works: Southern Electric
Current status: Advanced planning

Image: Oatsy40under CC BY 2.0