Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
Isle of Wight roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org
22 January — 18 March
Delays likely due to Streetworks
Road closure at null Spencer Road, Ryde, Isle of Wight (Spencer Road, Ryde) 22 January — 18 March
Diversion route at null Spencer Road, Ryde, Isle of Wight (Spencer Road, Ryde) 22 January — 18 March
Diversion route at null St Thomas Street, Ryde, Isle of Wight (Spencer Road, Ryde) 22 January — 18 March
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: Planned
Clarendon Street, Newport, Isle of Wight
22 January — 26 January
Delays likely due to Streetworks
Diversion route at Clarendon Street, Newport, Isle of Wight (Clarendon Street / Melbourne Street, Newport) 22 January — 26 January
Road closure at Clarendon Street, Newport, Isle of Wight (Clarendon Street / Melbourne Street, Newport) 22 January — 26 January
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: Planned
Chapel Street, Newport, Isle of Wight
22 January — 26 January
Delays likely due to Streetworks
Road closure at Chapel Street, Newport, Isle of Wight (Chapel Street, Newport) 22 January — 26 January
Diversion route at B3323 St James Street, Newport, Isle of Wight (Chapel Street, Newport) 22 January — 26 January
Diversion route at New Street, Newport, Isle of Wight (Chapel Street, Newport) 22 January — 26 January
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: Planned
A3055 Broadway, Sandown, Isle Of Wight
23 January — 24 January Traffic control (multi-way signals)
Delays likely due to Streetworks
0.45×0.45×40, 0.3×0.3×45 And 0.4×0.4×45, Tm=Give N Take (Cw: Pothole) Sandown at Sandown: At The Traffic Lights Sandown Heights Leisure Centre: Broadway-Sandown
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
A3055 High Street, Brading, Isle Of Wight
22 January — 26 January Road closure
Delays likely due to Streetworks
Gully Cover No. 1452 Is Starting To Breakout And Requires Resetting And Dyl’S Reinstated It Is In A Reinstatement Surround That Measures .80 X .50 Tm – Road Closure (Evening Works) Brading at Brading: O/S The Bugle Ph: High Street-Brading – 1452
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Chapel Street, Newport, Isle Of Wight
22 January — 26 January Road closure
Delays likely due to Streetworks
1500x1000x100 Patch Required To Consume Two Potholes 350x350x50 400x300x60 (Chamfered Edges) And 450x300x40 Patch Required. Road Closure. (Cw: Pothole) Newport at Newport: Between Number 1 Chapel Street And St. James’S St, Newport.: Chapel Street-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Chapel Street, Newport, Isle Of Wight
23 January — 23 January Road closure
Delays likely due to Streetworks
Trial Pit Excavation Newport at Newport: Ml 240235 Ch44 On The Corner By No. 1: Chapel Street-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Melbourne Street, Newport, Isle Of Wight
22 January — 26 January Road closure
Delays likely due to Streetworks
28 Day Perm Required Sawcut And Infill Filled Pothole 1300x600x90. Perm Patch Same Dimensions Needed Tm – Road Closure. (Cw: Pothole) Newport at Newport: Outside Number 3 Melbourne Street.: Melbourne Street-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Carter Avenue, Shanklin, Isle Of Wight
22 January — 27 January Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit 50% Partrecon) Shanklin at Shanklin: From Dennys Gardens 255m West, Ml 440236: Carter Avenue-Shanklin
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Hildyards Crescent, Lake, Isle Of Wight
22 January — 26 January Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Reconstruction And Surfacing (Fwl : Bit Partrecon) Lake at Lake: From Junction With Fir Tree Close To End Junction With Green Lane 246m Ml 440262: Hildyards Crescent-Lake
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning