Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
It covers work carried out by BT, utility companies and Island roads.
Isle of Wight roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org.
A3020 Blackwater Road, Newport, Isle Of Wight
02 March — 04 March
Delays likely Traffic control (two-way signals)
Works location: Newport: N/B C/W J/O Blackwater Hollow: Blackwater Road-Newport
Works description: 28 Day Perm Required Sawcut And Infill Carriageway Repairs, X2 P/Hs – Made Safe With Cold Lay 0.35mx0.25mx40mm 0.3mx0.2mx40mm Tm Three Way Lights Req (Cw: Pothole) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3020 Blackwater Road, Newport, Isle Of Wight
02 March — 04 March
Delays likely Traffic control (two-way signals)
Works location: Newport: Outside Scats (Ml 410016): O/S Scats Refuge
Works description: Replacement Of N 1 Refuge Pole Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3020 Newport Road, Cowes, Isle Of Wight
01 March — 01 May
Delays likely Road closure
Works location: Cowes: Ml 110001 From Northwood Garage To Church Lane: Newport Road-Cowes
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mpc:U/H1 Resurface 25mm Ul-M 65psv Channel Plane-Urban: H1) (Kerbed=Inlay/Unkerbed=Overlay) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3020 Newport Road, Cowes, Isle Of Wight
01 March — 01 May
Delays likely Road closure
Works location: Cowes: Ml 110004 Roundabout: Newport Road-Cowes
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Ml:U/H1 Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3020 Newport Road, Cowes, Isle Of Wight
01 March — 01 May
Delays likely Road closure
Works location: Cowes: Ml 110002 From The Junction Of Church Lane To The Junction Of Somerton Farm Lane (O/S No. 218): Newport Road-Cowe
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1 Resurface 25mm Ul-M 65psv Channel Plane-Urban:H1) (Kerbed=Inlay/Unkerbed=Overlay) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3020 Newport Road, Cowes, Isle Of Wight
01 March — 01 May
Delays likely Road closure
Works location: Cowes: Ml 110003 From The Junction Of Somerton Farm Lane To The Junction Of Three Gates Road: Newport Road-Cowes
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1 Resurface 25mm Ul-M 65psv Channel Plane-Urban: H1) (Kerbed=Inlay/Unkerbed=Overlay) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3020 Newport Road, Northwood, Isle Of Wight
01 March — 03 March
Delays likely Traffic control (Stop/Go boards)
Works location: Os 364 , Newport Road
Works description: Replace 1 Jointbox Frame And Cover(S) (625mm X 625mm) In Carriageway
Responsibility for works: BT
Current status: Advanced planning
A3020 St Georges Way, Newport, Isle Of Wight
02 March — 02 March
Delays likely Traffic control (priority working)
Works location: Newport: Mn 210001/2 From St Georges Way Roundabout To Shide Road: St Georges Way-Newport
Works description: Six Road Core Excavations Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3020 St Georges Way, Newport, Isle Of Wight
02 March — 04 March
Delays likely Lane closure
Works location: Newport: 15m Past The Bridge To Cineworld At The Side Of The Cowes Lane: St Georges Way-Newport
Works description: Idr – Gully Cover Has Sunk And Is Breaking Out Rebed To Level Tm – Lane Closure (Cw: Irnwk Not Exceed +Or- 20mm) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3020 St Georges Way, Newport, Isle Of Wight
02 March — 04 March
Delays likely Traffic control (two-way signals)
Works location: Newport: Outside Newport Football (Ml 210002): Illuminated Ref Pole
Works description: Replacement Of N 1 Refuge Pole Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3020 Victoria Avenue, Shanklin, Isle Of Wight
02 March — 04 March
Delays likely Road closure
Works location: 48 Victoria Avenue, Shanklin
Works description: – No Dig, Access Required To Manholes In Carriageway To Reline Sewer
Responsibility for works: Southern Water
Current status: Advanced planning
A3021/A3054 Whippingham Road, East Cowes, Isle Of Wight
02 March — 04 March
Delays likely Traffic control (multi-way signals)
Works location: East Cowes: Barton Manor Roundabout, Facing Approach From Saunders Way: Whippingham Road-East Cowes
Works description: Reset 2no Dislodged Sign Posts. Replace 2no Damaged ‘Chevron’ Signs 1.8m X 0.6m. (Sg: Sign Missing) East Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3054 Binstead Hill, Binstead, Isle Of Wight
01 March — 03 March
Delays likely Traffic control (Stop/Go boards)
Works location: At Jcn Of Newnham Road On, Binstead Hill
Works description: Replace 1 Jointbox Frame And Cover(S) (2285mm X 680mm) In Carriageway
Responsibility for works: BT
Current status: Advanced planning
A3054 Kite Hill, Wootton, Isle Of Wight
01 March — 03 March
Delays likely Traffic control (Stop/Go boards)
Works location: Adj Firestone Cottage, On, Kite Hill.
Works description: Replace 1 Jointbox Frame And Cover(S) (1220mm X 680mm) In Carriageway.
Responsibility for works: BT
Current status: Advanced planning
A3056 Hale Common, Arreton, Isle Of Wight
02 March — 04 March
Delays likely Traffic control (two-way signals)
Works location: Arreton: O/S Holiers Farm: Hale Common-Arreton
Works description: Please Dig Out/ Clear Ditch (Gl: Drainage Structre Blockage) Arreton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3322 Alum Bay New Road, Totland, Isle Of Wight
01 March — 01 May
Delays likely Road closure
Works location: Totland: From Cliff Road To York Road (Ml630098) : Alum Bay New Road-Totland:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Totlan
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3401 High Street, Carisbrooke, Isle Of Wight
02 March — 04 March
Delays likely Traffic control (Stop/Go boards)
Works location: Opp 21, High Street.
Works description: Replace 1 Jointbox Frame And Cover(S) (2285mm X 680mm) In Carriageway.
Responsibility for works: BT
Current status: Advanced planning
Merryl Lane, Godshill, Isle Of Wight
02 March — 04 March
Delays likely Road closure
Works location: Godshill: Whole Length Of Road.:
Works description: C/W Defects X 24 Potholes, 28 Day Perm Repair Req. .70 X .60 X 45mm X 5 P/H,S, .45 X .45 X 35mm. .65 X .50 X 40mm X 3 P/H,S .85 X .60 X 50mm .50 X .50 X 45mm X 8 P/H,S .35 X .30 X 35mm X 6 P/H,S Tm- Ds Advices Road Closure. (Cw: Pothole) Godshill
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3323 South Street, Newport, Isle Of Wight
02 March — 03 March
Delays possible Some carriageway incursion
Works location: Approx 30mtrs East Of Fire Station
Works description: Install Sewer Monitoring Equipment Within The Manhole
Responsibility for works: Southern Water
Current status: Advanced planning
B3331 Fishbourne Lane, Wootton, Isle Of Wight
01 March — 02 March
Delays possible Traffic control (multi-way signals)
Works location: 82
Works description: Install Sewer Monitoring Equipment Within The Manhole Chamber
Responsibility for works: Southern Water
Current status: Advanced planning
Binstead Lodge Road, Binstead, Isle Of Wight
02 March — 04 March
Delays possible Traffic control (multi-way signals)
Works location: Binstead: 115 Binstead Lodge Road : Binstead Lodge Road-Binstead – 1189
Works description: Gully Defect Works “Jetting Pipe 12m, Hit Clay In Garden, Mark On Site” Rod Guly Pipework If Possible, Otherwise Excavate/ Investigate And Remove Clay Blockage. (Gl: Drainage Structure Leakage) Binstead
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Kennel Lane, Chale, Isle Of Wight
02 March — 04 March
Delays possible Traffic control (two-way signals)
Works location: Chale: On The Chale Bound Side Of The C/Way Appx 150m Before Ashbridge Lane: Kennel Lane-Chale
Works description: Idr – Edge Of C/Way Erosion 15.0 X .50 X 50/100mm Tm – Two Way Temp Lights (Cw: Pothole) Chale
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Brading Down Road, Brading, Isle Of Wight
02 March — 04 March
Delays possible Traffic control (multi-way signals)
Works location: Brading: J/O Ashey Road: Brading Down Road-Brading
Works description: 28 Day Perm Required Sawcut And Infill Carriageway Pothole Approx 500mm Dia X 80mm Deep (Cw: Pothole) Brading
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Grange Road, Brighstone, Isle Of Wight
02 March — 04 March
Delays possible Traffic control (multi-way signals)
Works location: Brighstone: 10m To 40m In From The Jnc With Military Road: Grange Road-Brighstone
Works description: Sawcut And Infill Idr – P/H’S X 4 .40 X .20 X 30mm .90 X .70 X 40mm Patch Req’D 1.1 X 1.1 X 50/100mm .90 X .50 X 60mm Patch Req’D 1.1 X 1.0 X 50/100mm .40 X .20 X 40mm Tm – Two Way Temp Lights (Cw: Pothole) H3 Rural Brighstone
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Castle Street, Carisbrooke, Isle Of Wight
01 March — 09 March
Delays possible Traffic control (two-way signals)
Works location: Plot 1 , 16
Works description: Lay New Service From Farside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning
A3054/B3330 High Street, Ryde, Isle Of Wight
01 March — 07 March
Delays unlikely Some carriageway incursion
Works location: O/S Lucky House Chinese
Works description: Scaff. App. 111 High Street – 01/03 – 05/03
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3054 Colwell Road, Freshwater, Isle Of Wight
01 March — 04 March
Delays unlikely Traffic control (give & take)
Works location: Freshwater: From Junction Of Colwell Lane To Junction With Madeira Lane, 340m, Ml 620003: Colwell Road-Freshwater
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3054 Ningwood Hill, Shalfleet, Isle Of Wight
02 March — 04 March
Delays unlikely No carriageway incursion
Works location: O/S The Retreat, Ningwood Hill,
Works description: Replace 1 Jointbox Frame And Cover(S) (2285mm X 680mm) In Carriageway
Responsibility for works: BT
Current status: Advanced planning
Ashley Path, Brighstone, Isle Of Wight
02 March — 04 March
Delays unlikely Traffic control (give & take)
Works location: Brighstone: Footway Link Off Ashley Way, Ml F60616: Ashley Path-Brighstone
Works description: Footway Reconstruction And Surfacing (Fwl : Bit Partrecon) Brighstone
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3341 Castle Road, Newport, Isle Of Wight
02 March — 04 March
Delays unlikely Traffic control (give & take)
Works location: Newport: From The Junction Of Cedar Hill & Castle Road, North East To Junction With Carisbrooke Road (Ml 240088 & Ml 240
Works description: Replacement Of N 7 Signs (1 X Roundabout, 2 X No Entry, 2 X Width Restriction & 2 X Give Way) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3401 Calbourne Road, Newport, Isle Of Wight
02 March — 02 March
Delays unlikely Traffic control (priority working)
Works location: Newport: Ml 220092/3/4 From The Junction With Manner Farm Through To Betty Haunt Lane: Calbourne Road-Newport
Works description: Nine Road Core Excavations Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Bellecroft Drive, Newport, Isle Of Wight
01 March — 11 March
Delays unlikely Some carriageway incursion
Works location: 2 Bellecroft Drive, Newport, Isle Of Wight.
Works description: – Renew Faulty 4″ Valve In Footway.
Responsibility for works: Southern Water
Current status: Advanced planning
Town Lane, Newport, Isle Of Wight
02 March — 08 March
Delays unlikely Some carriageway incursion
Works location: Savoy Court
Works description: Scaff. App. Savoy Court, Town Lane, 02/03 – 08/03
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Worsley Road, Gurnard, Isle Of Wight
02 March — 04 March
Delays unlikely No carriageway incursion
Works location: O/S 41 To O/S 43, Worsley Road
Works description: Install 14m Of 1 Way Poly Duct In Footway,Install 15m Of 1 Way Poly Duct In Verge
Responsibility for works: BT
Current status: Advanced planning
Worsley Road, Gurnard, Isle Of Wight
02 March — 04 March
Delays unlikely Some carriageway incursion
Works location: O/S 17 Across C/W To Opp 17, Worsley Road.
Works description: Install 2m Of 1 Way Poly Duct In Footway,Install 3m Of 1 Way Poly Duct In Verge,Install 7m Of 1 Way Poly Duct In Carriageway,Test 12m Of Existing Ducts To Locate Blockages
Responsibility for works: BT
Current status: Advanced planning
Esplanade, Shanklin, Isle Of Wight
01 March — 14 March
Delays unlikely Some carriageway incursion
Works location: O/S 2
Works description: Scaff. App. 2 Esplanade, Shanklin – 01/03 – 14/03
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Fairmount Drive, Newport, Isle Of Wight
01 March — 11 March
Delays unlikely Some carriageway incursion
Works location: 5 Fairmount Drive, Newport, Isle Of Wight.
Works description: Renew Faulty 6″ Pvc Valve In Footway.
Responsibility for works: Southern Water
Current status: Advanced planning
Heatherwood Park Road, Totland, Isle Of Wight
02 March — 03 March
Delays unlikely Traffic control (give & take)
Works location: Totland: From Cliff Road To Church Hill, 202m, Ml 640374: Heatherwood Park Road-Totland
Works description: Footway Reconstruction And Surfacing (Fwl : Bit Partrecon) Totland
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
The Fairway, Lake, Isle Of Wight
02 March — 04 March
Delays unlikely No carriageway incursion
Works location: Lake: Nearest Ml 430204 By No.46. Off Pn.: The Fairway-Lake – 2807
Works description: Additional Drainage Scheme #140 Lake
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning