Roadworks signs

Isle of Wight roadworks and road closures 10 March 2016

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

It covers work carried out by BT, utility companies and Island roads.

Isle of Wight roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

Lane End Road will be closed between Foreland Farm Road and the end of the highway (at Fisherman�s Walk) from 1030hrs until 1430hrs on Thursday 10 March 2016. The closure is for carriageway repair works by Island Roads. Vehicular access in emergency situations will be maintained. For further details about these works please contact Island Roads on 01983 822440.

Market Hill will be closed at the junction with Castle Road between 9am on Thursday 10 March until 6pm on Friday 11 March 2016. The road closure is for sewer relining works relining works by P Fitzsimmons Dyno Rod. The one way restrictions will be suspended to allow access. For further detail about these works please contact Southern Water on 0845 278 0845

Newnham Lane will be closed on one day between 9am and 4pm during the period from Friday 11 March until Tuesday 15 March 2016. The closure is between Newnham Road and Firestone Copse Road. for carriageway repair works outside 21 by Island Roads. For further details about these works please contact Island Roads on 01983 822440
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure

West Street will be closed on one day between 9am and 4pm during the period from Friday 11 March until Tuesday 15 March 2016. The closure is between Spencer Road and Lind Street for carriageway repair works by Island Roads. Diversion route: Southbound: Spencer Road, St Thomas Street, St Thomas Square, High Street, Garfield Road, Victoria Street, John Street and West Street. Northbound: Lind Street, St Thomas Street and Spencer Road. For further details about these works please contact Island Roads on 01983 82244

Partlands Avenue will be closed on one day between 9am and 4pm during the period between Friday 11 March and Tuesday 15 March 2016. The closure is from Pellhurst Road to its junction with Upton Road for carriageway repair works by Island Roads. The route for diverted traffic will be: Pellhurst Road and Upton Road. For further details about these works please contact Island Roads on 01983 822440
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Eastcliff Road will be closed on one day between 9am and 4pm during the period between Friday 11 March and Tuesday 15 March 2016. The closure is from A3055 High Street to the end of the highway to the Northeast for carriageway repair works by Island Roads. For further details about these works please contact Island Roads on 01983 822440.

Rectory Road will be closed on one day between 9am and 4pm during the period between Friday 11 March and Tuesday 15 March 2016. The closure is from Westhill Road to the end of the highway to the Southeast for carriageway repair works by Island Roads. For further details about these works please contact Island Roads on 01983 822440
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Gotten Lane will be closed on one day between 9am and 4pm during the period from Monday 14 March and Wednesday 16 March 2016. The closure is between Chale Street and the end of the highway adjacent to Gotten Manor for carriageway repair works by Island Roads. For further details about thesesworks please contact Island Roads on 01983 822440

A3054 West Street, Ryde, Isle Of Wight
11 March — 15 March
Delays likely Road closure
Works location: Ryde: 25m From Junc To Spencer Street.: West Street-Ryde
Works description: C/W Defect X 1 Pothole, 28 Day Perm Repair Req. 1m X .60 X 35mm Tm- Ds Advices Road Closure. Not A Cat 1 Follow Up (Cw: Pothole) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 Yarmouth Road, Cranmore, Isle Of Wight
10 March — 23 March
Delays likely Traffic control (two-way signals)
Works location: Approx 55m South West Of The Greenbarn, Lucketts, Main Road, On Yarmouth Road, Bouldnor,Yarmouth Po41oxn
Works description: Yarmouth Pcp9 Street Cabinet & Power Installation. Excavate To Lay Approx 13m Bt Ducts, Lay Concrete Plinth, Stand Cab. Excavate To Expose Low Voltage Cable For Power Connection And Lay Approx 23m Duct. Power Engineer To Carry Out Inspection Prior To Jointing. Power Jointing Team To Insert Cable And Execute Jointing Works. Reinstate, Check And Clear Site.Undo
Responsibility for works: BT
Current status: Advanced planning

B3330/B3340 Nettlestone Hill, Seaview, Isle Of Wight
11 March — 11 May
Delays likely Road closure
Works location: Seaview: The Three Lengths Surrounding Nettlestone Green (Ml330083): Nettlestone Hill-Seaview:; Cw Cip Scheme Cw Cip Sch
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Seavie
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3330 Nettlestone Green, Nettlestone, Isle Of Wight
11 March — 11 May
Delays likely Road closure
Works location: Nettlestone: From Caws Avenue To Elm Close (Ml330082): Nettlestone Green-Nettlestone
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Nettlestone
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3401 High Street, Carisbrooke, Isle Of Wight
10 March — 10 May
Delays likely Road closure
Works location: Carisbrooke: From Priory Road 220m East (Ml210098): High Street-Carisbrooke:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren150:R/H1, Strengthen 25mm Ul-M 65psv And 125mm Hdm50-Rural:H1) Carisb
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Bedbury Lane, Freshwater, Isle Of Wight
10 March — 10 May
Delays likely Road closure
Works location: Freshwater: From Camp Road 190m West (Ml630205): Bedbury Lane-Freshwater:; Cw Cip Scheme Cw Cip Scheme
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Freshw
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Hooke Hill, Freshwater, Isle Of Wight
10 March — 10 May
Delays likely Road closure
Works location: Freshwater: From School Green Road To Copse Lane (Ml 630276): Hooke Hill-Freshwater
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3 Strengthen 25mm Ul-M 65psv And 85mm Foambase Urban-:H/3(Kerbed=Inlay/Unkerbed=Overlay) Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Castle Road, Cowes, Isle Of Wight
10 March — 14 March
Delays likely Road closure
Works location: 1 -11 Castle Road, Cowes
Works description: – No Dig Access Required To Manholes In Carriageway To Reline Sewer
Responsibility for works: Southern Water
Current status: Advanced planning

Eastcliff Road, Shanklin, Isle Of Wight
11 March — 15 March
Delays likely Road closure
Works location: Shanklin: O/S No.10 And O/S The Afton Gallery: Eastcliff Road-Shanklin
Works description: Idr – P/H’S X 2 .40 X.40 X 40mm .50 X .40 X 40mm Tm – Ds Advices Under The Same Road Closure (Cw: Pothole) Shanklin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Market Hill, Cowes, Isle Of Wight
10 March — 14 March
Delays likely Road closure
Works location: 1 Ward Cottages, Market Hill, Cowes
Works description: – No Dig Access Required To Manhole In Carriageway To Set Up Overpumping Whilst Sewer Repair Works Are Carried Out On Castle Road
Responsibility for works: Southern Water
Current status: Advanced planning

Partlands Avenue, Ryde, Isle Of Wight
11 March — 15 March
Delays likely Road closure
Works location: Ryde: Whole Stretch Of Road.: Partlands Avenue-Ryde
Works description: C/W Defects X 29 Potholes. 28 Day Perm Repair Required. .50 X .50 X45mm X 7 Potholes. .45 X .40 X 35mm X 8 Potholes. .90 X .65 X 30mm X 2 Potholes. .35 X .35 X 40mm X 2 Potholes. .35 X .25 X 35mm .30 X .30 X 30mm X 9 Potholes. Tm- Ds Advises Road Closure. Not A Cat 1 Follow Up (Cw: Pothole) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Rectory Road, Shanklin, Isle Of Wight
11 March — 15 March
Delays likely Road closure
Works location: Shanklin: O/S Homestead And Parkview: Rectory Road-Shanklin
Works description: Idr – P/H’S X 5 .40 X .30 X .25mm .75 X .40 X .20mm Patch Req’D 1.7 X 1.5 X 50/100mm .80 X .50 X.30mm .45 X .40 X .25mm .40 X .35 X .25mm Patch Req 3.10 X 1.6 X 50/100mm Please Close Down Further Works Required To Reinstate Dyl’S After Patch Has Been Completed O/S Homestead And Parkview 3.30 X 50mm X 2 Tm – Ds Advices Road Closure (Cw: Pothole) Shanklin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3021 Castle Street, East Cowes, Isle Of Wight
11 March — 14 March
Delays possible Traffic control (multi-way signals)
Works location: Junction Castle Street/Columbine Road/Maresfield Road/Old Road
Works description: Install Sewer Monitoring Equipment Within The Manhole
Responsibility for works: Southern Water
Current status: Advanced planning

B3323 South Street, Newport, Isle Of Wight
10 March — 11 March
Delays possible Some carriageway incursion
Works location: Approx 30mtrs East Of Fire Station
Works description: Install Sewer Monitoring Equipment Within The Manhole
Responsibility for works: Southern Water
Current status: Advanced planning

James Avenue, Lake, Isle Of Wight
10 March — 21 March
Delays possible Traffic control (two-way signals)
Works location: Lake: From Junction Of Chelsfield Avenue To James Avenue, 139m, Ml 430377: James Avenue-Lake
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Lake
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 Bridge Road, Yarmouth, Isle Of Wight
10 March — 14 March
Delays unlikely Traffic control (give & take)
Works location: Yarmouth: From The Junction With Quay Street, West To Outside The Ferry Terminal Entrance (Ml 620015, Ml 620016 & Ml 640
Works description: Replacement Of N� 13 Signs (2 X Advance Direction, 7 X No Entry, 1 X Swing Bridge & 3 X Turn Left) Yarmouth
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 West Street, Ryde, Isle Of Wight
11 March — 17 March
Delays unlikely Some carriageway incursion
Works location: Dairy Court
Works description: Scaff. App. Dairy Court, West Street, Ryde – 11/03 – 17/03
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3399/B3401 Freshwater Road, Shalfleet, Isle Of Wight
11 March — 24 March
Delays unlikely No carriageway incursion
Works location: So 2 Brook Road, Freshwater Road, Calbourne
Works description: Calbourne Pcp 5 Street Cabinet & Power Installation. Excavate To Lay Approx 23m Bt Ducts, Lay Concrete Plinth, Stand Cab. Excavate To Expose Low Voltage Cable For Power Connection And Lay Approx 38m Duct. Power Engineer To Carry Out Inspection Prior To Jointing. Power Jointing Team To Insert Cable And Execute Jointing Works. Reinstate, Check And Clear Site.
Responsibility for works: BT
Current status: Advanced planning

B3399 Brook Road, Brook, Isle Of Wight
10 March — 23 March
Delays unlikely Some carriageway incursion
Works location: Os 2 Brook Road, Junc Freshwater Road, Calbourne
Works description: Calbourne Pcp 5 Street Cabinet & Power Installation. Excavate To Lay Approx 23m Bt Ducts, Lay Concrete Plinth, Stand Cab. Excavate To Expose Low Voltage Cable For Power Connection And Lay Approx 38m Duct. Power Engineer To Carry Out Inspection Prior To Jointing. Power Jointing Team To Insert Cable And Execute Jointing Works. Reinstate, Check And Clear Site.
Responsibility for works: BT
Current status: Advanced planning

Long Lane, Newport, Isle Of Wight
11 March — 15 March
Delays unlikely Some carriageway incursion
Works location: Opposite Chandros, Buckbury Lane, Newport Po30 2nj
Works description: 326785 – 21 – Newport – Nga – Overlay � Lay Approx 27m Of Duct 54 In Fw/Verge To Link Existing Bt Boxes To Facilitate Spine Cabling Works.
Responsibility for works: BT
Current status: Advanced planning

Atherfield Road, Shorwell, Isle Of Wight
11 March — 15 March
Delays unlikely Some carriageway incursion
Works location: Little Atherfield Farm, Atherfield Road,Atherfielf,Iow.
Works description: Install New Water Service Connection
Responsibility for works: Southern Water
Current status: Advanced planning

Mill Lane, Shorwell, Isle Of Wight
10 March — 23 March
Delays unlikely Some carriageway incursion
Works location: Outside Yafford Mill Farm, Yafford, Shorwell, Newport Po30 3lh
Works description: Brighstone Pcp 9 Street Cabinet & Power Installation. Excavate To Lay Approx. 10m Bt Ducts, Lay Concrete Plinth, Stand Cab. Excavate To Expose Low Voltage Cable For Power Connection And Lay Approx 3m Duct. Power Engineer To Carry Out Inspection Prior To Jointing. Power Jointing Team To Insert Cable And Execute Jointing Works. Reinstate, Check And Clear Site.
Responsibility for works: BT
Current status: Advanced planning

Colwell Chine Path, Totland, Isle Of Wight
10 March — 14 March
Delays unlikely Traffic control (give & take)
Works location: Totland: Footway Link From Fort Warden Road To Colwell Chine Road, Ml F60334: Colwell Chine Path-Totland
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Fullrecon) Totland
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Manor Crescent, Newport, Isle Of Wight
10 March — 18 March
Delays unlikely Some carriageway incursion
Works location: Os 131
Works description: Relay Service From Farside Footway To Site
Responsibility for works: SGN
Current status: Advanced planning

Image: Oatsy40 under CC BY 2.0