Road works road closed signs

Isle of Wight roadworks and road closures: 10th September 2015

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

A3054 High Street, Wootton, Isle Of Wight
11 September — 21 September Traffic control (give & take)
Delays likely due to Streetworks
Relay Service From Farside Carriageway To Site at Os 144
Responsibility: SGN
EToN status: Advanced planning

Atherfield Road, Shorwell, Isle Of Wight
10 September — 10 November Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4 (Kerbed=Inlay/Unkerbed=Overlay) Shorwell at Shorwell: From 688m Northwest Of Southdown A Further 580m Northwest (Ml 640317): Atherfield Road-Shorwell
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Atherfield Road, Shorwell, Isle Of Wight
10 September — 10 November Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4 (Kerbed=Inlay/Unkerbed=Overlay) Shorwell at Shorwell: From Dungewood Lane To The Entrance Of Ash Hill Farm (Ml 640313): Atherfield Road-Shorwell
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Atherfield Road, Shorwell, Isle Of Wight
10 September — 10 November Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Fibrovia:R/H4, Resurface 30mm Fibrovia Plus Regulating/Patching-Rural:H4 (Kerbed=Inlay/Unkerbed=Overlay) Shorwell at Shorwell: From A Point 478m From Entrance To Ash Hill Farm A Further 486m East Then South (Ml 640315): Atherfield Road-S
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Atherfield Road, Shorwell, Isle Of Wight
10 September — 10 November Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Fibrovia:R/H4, Resurface 30mm Fibrovia Plus Regulating/Patching-Rural:H4 (Kerbed=Inlay/Unkerbed=Overlay) Shorwell at Shorwell: From Entrance To Ash Hill Farm Approx 478m Southwest, South, Then East 9ml 640314): Atherfield Road-Shorwell
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Atherfield Road, Shorwell, Isle Of Wight
10 September — 10 November Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4 (Kerbed=Inlay/Unkerbed=Overlay) Shorwell at Shorwell: From Junction Of New Road/Park Lane To Dungewood Lane (Ml640312): Atherfield Road-Shorwell
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Atherfield Road, Shorwell, Isle Of Wight
10 September — 10 November Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4 (Kerbed=Inlay/Unkerbed=Overlay) Shorwell at Shorwell: From1154m West Of Southdown A Further 500m Northwest (Ml 640316): Atherfield Road-Shorwell
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3054 Kite Hill, Wootton, Isle Of Wight
10 September — 11 September Some carriageway incursion
Delays possible due to Streetworks
Remedial Works To Rectify Ha Defect In Cw at Section 81/ Ref 1600994, Section 81/ Ref 1600994 Os La Paz Opp Junc Ryde Footpath , Kite Hill
Responsibility: BT
EToN status: Advanced planning

B3327 Clarence Road, Wroxall, Isle Of Wight
10 September — 14 September Traffic control (two-way signals)
Delays possible due to Streetworks
Ventnor Pcp1 Tm To Enable Installation Of Blown Fibre Tubing at O/S 5 Clarence Road, Wroxall Clarence Road Po38 3by
Responsibility: BT
EToN status: Advanced planning

B3327 Ocean View Road, Ventnor, Isle Of Wight
11 September — 11 September Traffic control (two-way signals)
Delays possible due to Streetworks
Access For 1 Day To Renew A Pole On The Verge. 2 Way Lights Will Be Required. at Between 35 Ocean View Road And Jcn With Zig Zag Road, Ventnor..
Responsibility: BT
EToN status: Advanced planning

A3055 Albert Street, Ventnor, Isle Of Wight
10 September — 14 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at 58 Albert St Ventnor Isle Of Wight Iw
Responsibility: Southern Water
EToN status: Advanced planning

A3055 Church Street, Ventnor, Isle Of Wight
10 September — 14 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at 21 Church St Ventnor Isle Of Wight Iw
Responsibility: Southern Water
EToN status: Advanced planning

A3055 High Street, Ventnor, Isle Of Wight
10 September — 14 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at 169 High St Ventnor Isle Of Wight Iw
Responsibility: Southern Water
EToN status: Advanced planning

A3055 Park Avenue, Ventnor, Isle Of Wight
10 September — 14 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at Melville Lodge Park Ave Ventnor Isle O
Responsibility: Southern Water
EToN status: Advanced planning

Anderri Way, Shanklin, Isle Of Wight
11 September — 15 September Some carriageway incursion
Delays unlikely due to Streetworks
Remedial Reinstatement at 19, Anderri Way, Shanklin, Po377ef
Responsibility: Southern Water
EToN status: Advanced planning

Argyll Place, Ryde, Isle Of Wight
10 September — 14 September Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re-Construction And Surfacing (Fwl: Fullrecon Fwr: Bit 50% Partrecon) Ryde at Ryde: Whole Length Of Road From Arygyll Street (Ml 360664): Argyll Place-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3325 Park Road, Cowes, Isle Of Wight
10 September — 14 September Some carriageway incursion
Delays unlikely due to Streetworks
– Reconnect Customer Water Supply In Tar Footway at Parklands Resource Centre, Park Road, Cowes, Isle Of Wight.
Responsibility: Southern Water
EToN status: Advanced planning

B3327 Mitchell Avenue, Ventnor, Isle Of Wight
11 September — 15 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at 2a Mitchell Ave Ventnor Isle Of Wight
Responsibility: Southern Water
EToN status: Advanced planning

B3327 Ocean View Road, Ventnor, Isle Of Wight
11 September — 14 September No carriageway incursion
Delays unlikely due to Streetworks
Two Traffic Lights Already Booked For 11/09/2015,Replace Decayed Pole In Situ Grass Verge Working Under Tma Notice. at Dp444 Adj Ocean View Road Po38 1ly
Responsibility: BT
EToN status: Advanced planning

B3327 Ocean View Road, Ventnor, Isle Of Wight
11 September — 15 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at 27 & 52 Ocean View Rd Ventnor Isle Of Wight
Responsibility: Southern Water
EToN status: Advanced planning

B3395 Embankment Road, Bembridge, Isle Of Wight
11 September — 15 September No carriageway incursion
Delays unlikely due to Streetworks
Install 3m Of 1 Way Poly Duct In Footway,Install 6m Of 1 Way Poly Duct In Carriageway at Frm In F/W 43m North East Frm Rear Of 1 Redwing Quay To Across C/W To In F/W 43m North East Frm Opp Rear Of 1 Redwing Qu
Responsibility: BT
EToN status: Advanced planning

Whitcombe Road, Newport, Isle Of Wight
10 September — 14 September Some carriageway incursion
Delays unlikely due to Streetworks
Erect New Pole To Provide Additional Service To Little Whitcombe Farm. at O/S Little Whitcombe Farm Po30 3dx
Responsibility: BT
EToN status: Advanced planning

Newport Road, Niton, Isle Of Wight
11 September — 15 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at Stone Cottage Newport Rd Niton Ventnor
Responsibility: Southern Water
EToN status: Advanced planning

Spring Hill, Ventnor, Isle Of Wight
10 September — 14 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at 31 Spring Hill Ventnor Isle Of Wight I
Responsibility: Southern Water
EToN status: Advanced planning

Clarence Road, Ventnor, Isle Of Wight
10 September — 14 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at 12 Clarence Rd Ventnor Isle Of Wight I
Responsibility: Southern Water
EToN status: Advanced planning

Coastguard Lane, Freshwater, Isle Of Wight
11 September — 22 September Traffic control (give & take)
Delays unlikely due to Streetworks
Lay New Service From Farside Carriageway To Site at Os Hampton House
Responsibility: SGN
EToN status: Advanced planning

Gloucester Road, Ventnor, Isle Of Wight
10 September — 14 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at 27a Gloucester Rd Ventnor Isle Of Wigh
Responsibility: Southern Water
EToN status: Advanced planning

Grangeside, Ventnor, Isle Of Wight
10 September — 14 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at 16 Grangeside Ventnor Isle Of Wight Iw
Responsibility: Southern Water
EToN status: Advanced planning

Grove Road, Ventnor, Isle Of Wight
10 September — 14 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at Dolphin Lodge Grove Rd Ventnor Isle Of
Responsibility: Southern Water
EToN status: Advanced planning

Guadeloupe Road, Sandown, Isle Of Wight
10 September — 14 September Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re-Construction And Surfacing (Fwr: Bit Partrecon) Sandown at Sandown: L/H Section From The High Street (Ml 460506): Guadeloupe Road-Sandown
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

North Street, Ventnor, Isle Of Wight
10 September — 14 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at 17-21 North St Ventnor Isle Of Wight Iw
Responsibility: Southern Water
EToN status: Advanced planning

Priory Drive, Nettlestone, Isle Of Wight
10 September — 14 September Some carriageway incursion
Delays unlikely due to Streetworks
– Remedial Reinstatement Of Core Failure at The Meadows, Priory Drive
Responsibility: Southern Water
EToN status: Advanced planning

Station Road, Yarmouth, Isle Of Wight
10 September — 23 September Traffic control (give & take)
Delays unlikely due to Streetworks
We Will Be Excavating To Allow For An 11kv Breech Joint In The Section To The Old Station And Then Continue Around The Corner Towards Mill Road at Around The Corner O/S Claremont
Responsibility: Southern Electric
EToN status: Advanced planning

Woodside Close, Northwood, Isle Of Wight
10 September — 18 September Some carriageway incursion
Delays unlikely due to Streetworks
Rrelay Service From Nearside Footway To Site at Os 1
Responsibility: SGN
EToN status: Advanced planning

Image: Stew Dean under CC BY 2.0