Isle of Wight roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org
Clatterford Shute, Newport, Isle Of Wight
12 February — 16 February
Delays likely Road closure
Works location: Newport: Verge O/S 9 Ford Cottage: Clatterford Shute-Newport
Works description: Drainage Repair Works Req Supply And Install A New Section Of Drainage Pipe, 2m Req Tm G&T (Gl: Drainage Structre Blockage) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Crocker Street, Newport, Isle Of Wight
12 February — 16 February
Delays likely Road closure
Works location: Newport: J/O Mill St – Car Park Exit: Crocker Street-Newport
Works description: Carriageway Repairs, X8 Patches (To Be Undertaken In Advance Of Lining Works) Edge Of C/W All Marked Out Between The J/O Mill St To The Car Park Exit 5mx0.7m. (3.5m2) 2mx0.2m. (0.4m2) 2.4mx0.5m. (1.2m2) 0.35mx0.3m. (0.105m2) 0.3mx0.3m X3 (0.27m2) 1.8mx1.2. (2.16m2) Total = 7.64m2 Tm No Parking Cones Req Setting Out Prior To Site Attendance (Cw: Pothole) H4 Urban Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Field Place, Newport, Isle Of Wight
12 February — 16 February
Delays likely Road closure
Works location: Newport: O/S No.21: Field Place-Newport
Works description: Sawcut And Infill Idr – P/H 1.3 X 1.0 X 60mm Patch Req’D 3.0 X 1.8 X 50/100mm Tm – Road Closure (Cw: Pothole) H4 Urban Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Portland Street, Newport, Isle Of Wight
12 February — 16 February
Delays likely Road closure
Works location: Newport: Portland Street Newport, On Bend O/S The Fitness Factory: Portland Street-Newport
Works description: 28 Day Perm Required Carriageway Repairs, X3 P/Hs 1mx0.6x50mm 0.25mx0.2mx30mm 0.2mx0.2mx35mm Tm Emergency Closure Req Or Stop Works (Cw: Pothole) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3401 High Street, Carisbrooke, Isle Of Wight
11 February — 17 February
Delays possible Some carriageway incursion
Works location: O/S 54b Carisbrooke High Street
Works description: 54b Carisbrook High Street, Scaffold Application – 11/02/2016 – 17/02/2016
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Bedbury Lane, Freshwater, Isle Of Wight
11 February — 20 February
Delays possible Traffic control (two-way signals)
Works location: Freshwater: From Victoria Road 410m Northwest (Ml 630207): Bedbury Lane-Freshwater
Works description: Installation Of Concrete Drainage Channel To Allow For Resurfacing Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3055 Esplanade, Ryde, Isle Of Wight
11 February — 15 February
Delays unlikely Some carriageway incursion
Works location: Park Area Eastern End Of Esplanade/The Strand To Cornwall Street,Ryde
Works description: Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning
B3399 Presford Shute, Shorwell, Isle Of Wight
12 February — 16 February
Delays unlikely Some carriageway incursion
Works location: Entrance To Preston Farm To Opp Preston Farm, Presford Shute
Works description: Install 29m Of 1 Way Poly Duct In Verge,Install 5m Of 1 Way Poly Duct In Carriageway
Responsibility for works: BT
Current status: Advanced planning
Elm Lane, Calbourne, Isle Of Wight
11 February — 15 February
Delays unlikely Some carriageway incursion
Works location: O/S Calbourne Garage, Elm Lane
Works description: Install 2m Of 1 Way Poly Duct In Carriageway,Install 5m Of 1 Way Poly Duct In Footway
Responsibility for works: BT
Current status: Advanced planning
Spring Hill, Ventnor, Isle Of Wight
12 February — 18 February
Delays unlikely Some carriageway incursion
Works location: O/S 1
Works description: Scaffold App. 1 Spring Hill, Ventnor, 12/2-18/2
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Ashey Road, Ryde, Isle Of Wight
11 February — 24 February
Delays unlikely Some carriageway incursion
Works location: Smallbrook Stadium, Ashey Road , Ryde, Islel Of Wight.
Works description: – Install Washout Hydrant Off 450mm Water Main In Verge.
Responsibility for works: Southern Water
Current status: Advanced planning
High Street, Oakfield, Ryde, Isle Of Wight
11 February — 15 February
Delays unlikely Some carriageway incursion
Works location: From Jcn Of Oak Dale And Cross Street Across Cw To O/S 42 , High Street
Works description: Install 10m Of 1 Way Poly Duct In Footway,Install 8m Of 1 Way Poly Duct In Carriageway,Provide 3 Core Drill(S) Into Jointbox Or Building
Responsibility for works: BT
Current status: Advanced planning
Cross Street, Oakfield, Ryde, Isle Of Wight
11 February — 15 February
Delays unlikely Some carriageway incursion
Works location: From O/S 2e Cross Street To Jcn Of Oak Dale Cross Street
Works description: Install 21m Of 1 Way Poly Duct In Footway
Responsibility for works: BT
Current status: Advanced planning
Hefford Road, East Cowes, Isle Of Wight
11 February — 15 February
Delays unlikely No carriageway incursion
Works location: O/S 2 Hendy Rd To O/S 28 In , Hefford Road
Works description: Build 1 Precast Jointing Chamber (725mm X 225mm) 600mm Dep,Install 14m Of 1 Way Poly Duct In Footway,Install 7m Of 1 Way Poly Duct In Verge
Responsibility for works: BT
Current status: Advanced planning
Kingfisher Close, Carisbrooke, Isle Of Wight
12 February — 16 February
Delays unlikely Traffic control (give & take)
Works location: Carisbrooke: From Fieldfare Road, South To Column 8 (Ml 240227):
Works description: Install N� 1 Lantern (N� 1 Column) Carisbrooke
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Laburnam Close, Newport, Isle Of Wight
12 February — 15 February
Delays unlikely Traffic control (give & take)
Works location: Newport: Whole Length Of Close From Junction With Shide Road, 125m, Ml 260306: Laburnam Close-Newport
Works description: Footway Re-Construction And Surfacing (Fwr : Bit Fullrecon) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Nightingale Road, Newport, Isle Of Wight
11 February — 12 February
Delays unlikely Traffic control (give & take)
Works location: Newport: Whole Length Of Road From Junction With Purdy Road, 234m, Ml 240250: Nightingale Road-Newport
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Sea Close, Ryde, Isle Of Wight
12 February — 16 February
Delays unlikely Traffic control (give & take)
Works location: Ryde: From Augusta Road, West, Then North To Dead End (Ml 340615):
Works description: Install N� 2 Lanterns (N� 2 Columns) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Solent Hill, Freshwater, Isle Of Wight
11 February — 15 February
Delays unlikely Traffic control (give & take)
Works location: Freshwater: From Junction With Main Road, 136m, Ml 640547: Solent Hill-Freshwater
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Fullrecon Fwr : Bit Partrecon) Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
South Street, Ryde, Isle Of Wight
12 February — 22 February
Delays unlikely Some carriageway incursion
Works location: Os 4
Works description: Lay New Service From Nearside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning