Roadworks sign with red traffic light

Isle of Wight roadworks and road closures 14th January 2016

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Isle of Wight roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

A3020 Newport Road, Northwood, Isle Of Wight
14 January — 16 January Traffic control (two-way signals)
Delays likely due to Streetworks
Road Core Excavations Northwood at Northwood: Ml 210031 Three Cores Equidistant Throughout The Monitoring Length – Between The Junction Of Coronation Avenu
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Brading Road, Ryde, Isle Of Wight
14 January — 16 January Traffic control (two-way signals)
Delays likely due to Streetworks
Three Road Core Excavations Ryde at Ryde: Ml 310049 From Tesco Roundabout To Cothey Way: Brading Road-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Brading Road, Ryde, Isle Of Wight
14 January — 16 January Traffic control (two-way signals)
Delays likely due to Streetworks
Three Road Core Excavations Ryde at Ryde: Ml 310047 From Tesco Roundabout To To A Point 542 Meters South: Brading Road-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Brading Road, Ryde, Isle Of Wight
14 January — 16 January Traffic control (two-way signals)
Delays likely due to Streetworks
Three Road Core Excavations Ryde at Ryde: Ml 310050 From Cothey Way To Great Preston Road: Brading Road-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3401 High Street, Carisbrooke, Isle Of Wight
14 January — 16 January Traffic control (two-way signals)
Delays likely due to Streetworks
Road Core Excavations Carisbrooke at Carisbrooke: Ml 220097 Three Cores Taken Equidistant Between From Clatterford Road To Alvington Road: High Street-Carisb
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3020 Coppins Bridge, Newport, Isle Of Wight
14 January — 18 January Some carriageway incursion
Delays possible due to Streetworks
Install N? 1 Lantern (N? 0 Columns) Newport at Newport: On The Bridge In The Middle Of The Roundabout (Ml 210007):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3021 York Avenue, East Cowes, Isle Of Wight
14 January — 05 February Some carriageway incursion
Delays possible due to Streetworks
Hoarding (Weatherhead Shop Designers Ltd) at O/S Co-Op Shop
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3054 Binstead Hill, Binstead, Isle Of Wight
15 January — 19 January Some carriageway incursion
Delays possible due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (2285mm X 680mm) In Carriageway at Os La Guayra On, Binstead Hill
Responsibility: BT
EToN status: Advanced planning

Albany Road, Newport, Isle Of Wight
15 January — 19 February Traffic control (two-way signals)
Delays possible due to Streetworks
Road Cores And Trial Pit Excavations. Newport at Newport: Ml 240215 Outside Hunnyhill Primary School, No. 59 & No. 65: Albany Road-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3323 High Street, Newport, Isle Of Wight
14 January — 14 January Some carriageway incursion
Delays possible due to Streetworks
Lightning Protection Earth Road Works In Footway at Side Of Guild Hall. Footway
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3020 Victoria Avenue, Shanklin, Isle Of Wight
14 January — 20 January Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Reconstruction And Surfacing (Fwl Bit Partrecon Fwr : Bit Partrecon) Shanklin at Shanklin: From Windsor Drive To Westhill Road Ml 410003: Victoria Avenue-Shanklin
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3020 Victoria Avenue, Shanklin, Isle Of Wight
14 January — 20 January Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Reconstruction And Surfacing (Fwr : Bit 50% Partrecon) Shanklin at Shanklin: From Windsor Drive To Peacock Close Ml 410004: Victoria Avenue-Shanklin
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3020 Victoria Avenue, Shanklin, Isle Of Wight
14 January — 20 January Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Shanklin at Shanklin: From Westhill Road To Highfield Road, Ml 410002: Victoria Avenue-Shanklin
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 High Street, Niton, Isle Of Wight
15 January — 19 January No carriageway incursion
Delays unlikely due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (625mm X 625mm) In Footway. at F/W Outside Rose Cottage, High Street.
Responsibility: BT
EToN status: Advanced planning

B3395 Embankment Road, Bembridge, Isle Of Wight
14 January — 18 January No carriageway incursion
Delays unlikely due to Streetworks
Install 3m Of 1 Way Poly Duct In Footway,Install 6m Of 1 Way Poly Duct In Carriageway. at Frm In F/W 43m North East Frm Rear Of 1 Redwing Quay To Across C/W To In F/W 43m North East Frm Opp Rear Of 1 Redwing Q.
Responsibility: BT
EToN status: Advanced planning

Batts Road, Shanklin, Isle Of Wight
14 January — 19 January Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re-Construction And Surfacing. Shanklin at Shanklin: Ml 420295 From The Junction Of Sibden Road To O/S No 1 Batts Road: Batts Road-Shanklin
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Newport Road, Niton, Isle Of Wight
15 January — 19 January Some carriageway incursion
Delays unlikely due to Streetworks
– Interim To Perm Reinstatement at Heronfield, Newport Road, Niton,Iow.
Responsibility: Southern Water
EToN status: Advanced planning

Town Lane, Newport, Isle Of Wight
14 January — 18 January Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 2 Lanterns (N? 1 Column) Newport at Newport: From Middle Of Pyle Street, South To South Street (Ml 230133):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Melville Street, Sandown, Isle Of Wight
15 January — 18 January Some carriageway incursion
Delays unlikely due to Streetworks
Emailed Application >>> Please Find Attached Permit Application For 12 Melville Street, Sandown. Starting 15/01/2016 – 18/01/2016. at O/S No12
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Monks Brook, Newport, Isle Of Wight
15 January — 19 January No carriageway incursion
Delays unlikely due to Streetworks
Install 1m Of 1 Way Poly Duct In Footway. at 83m North East From Junc Dodnor Lane, Monks Brook.
Responsibility: BT
EToN status: Advanced planning

St Thomas Square, Newport, Isle Of Wight
14 January — 18 January Some carriageway incursion
Delays unlikely due to Streetworks
Interim To Perm Reinstatement at Lloyds Bank, St, Thomas Sq, Newport
Responsibility: Southern Water
EToN status: Advanced planning

Station Road, Sandown, Isle Of Wight
14 January — 20 January Some carriageway incursion
Delays unlikely due to Streetworks
Scaffolding Licence Application at O/S 4a
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Weston Lane, Totland, Isle Of Wight
15 January — 19 January Some carriageway incursion
Delays unlikely due to Streetworks
Install Off Site Connections at New House Adj: Chequers,Weston Lane,Totland,Iow.
Responsibility: Southern Water
EToN status: Advanced planning