Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
It covers work carried out by BT, utility companies and Island roads.
Isle of Wight roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org
Blacklands Lane will be closed from 9am until 4pm on Wednesday 16 March and Thursday 17 March 2016 between Staplers Road and Briddlesford Road. The road closure is for tree cutting works and the replacement of overhead electric wires by Groundsell Contracting for Scottish and Southern Energy. For further details about these works contact Groundsell Contracting on 01983 861319. Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Hooke Hill will be closed from 6.30am until 6pm on approximately 3 to 5 days (Mondays to Fridays) starting on Wednesday 16 March 2016. The closure is from School Green Road to Copse Lane for carriageway and footway repairs, resurfacing, and drainage works by Island Roads The route for diverted traffic will be: A3055 School Green Road, Tennyson Road and The Avenue, A3054 Colwell Road and Hill Lane, Pixley Hill and Copse Lane. Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Elenors Grove, Fishbourne will be closed from 7.30pm until 6am on approximately 5 to 8 nights (Mondays to Fridays) starting on Wednesday 16 March 2016. The closure is from Fishbourne Lane to Quarr Hill for carriageway and footway repairs, resurfacing, and drainage works by Island Roads. The route for diverted traffic will be: A3054 Kite Hill, High Street (Wootton) , Station Road, Briddlesford Road, Downend Road, A3056 Arreton Street, Hale Common, Newport Road, A3055 Sandown Road, Lake, Hill, Broadway, Avenue Road, Morton Common, Morton Road, New Road, High Street (Brading), Rowborough Lane, Beaper Shute, Brading Road, Marlborough Road, Appley Road, B3330 Alexandra Road, St Johns Hill, St Johns Road, Green Street, Argyll Street, Pellhurst Road, Binstead Road, Binstead Hill and Quarr Hill. All vehicles can use Great Preston Road in a Northern direction and light traffic (up to 6ft 6in in width)can use Great Preston Road in a Southbound direction. Responsibility for works: Island Roads on behalf of the Isle of Wight Council
A3020 Newport Road, Cowes, Isle Of Wight
16 March — 18 March
Delays likely Traffic control (two-way signals)
Works location: Cowes: Column 10 – Outside Number 32 (Ml 110005):
Works description: ** Private Job ** Relocation Of Street Lighting Column Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3020 Newport Road, Northwood, Isle Of Wight
17 March — 17 May
Delays likely Road closure
Works location: Northwood: Ml 210030 Between The Junction Of Coronation Avenue To A Point 215 Meters South Thereof (To The Driveways Of
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H1 Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Urban:H1) (Kerbed=Inlay/Unkerbed=Overlay) Northwood
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3054 Elenors Grove, Binstead, Isle Of Wight
17 March — 17 May
Delays likely Road closure
Works location: Binstead: From 300 Metres East Of Fishbourne Lane To Quarr Hill (Ml 310013): Elenors Grove-Binstead
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1 Resurface 25mm Ul-M 65psv Channel Plane-Urban:H1) Binstead
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3054 Elenors Grove, Binstead, Isle Of Wight
17 March — 17 May
Delays likely Road closure
Works location: Binstead: From Fishbourne Lane To 300metres East Thereof (Ml 310012): Elenors Grove-Binstead
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1 Resurface 25mm Ul-M 65psv Channel Plane-Urban:H1) Binstead
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3054 Ningwood Hill, Shalfleet, Isle Of Wight
16 March — 18 March
Delays likely Traffic control (two-way signals)
Works location: Lakota ,Ningwood Hill , Cranmore. Iow.
Works description: Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning
A3055 Morton Common, Brading, Isle Of Wight
16 March — 16 March
Delays likely Traffic control (Stop/Go boards)
Works location: Brading: From Greenwood Lane, South Towards Perowne Way, Mls 310032, 33,34: Morton Common-Brading
Works description: Road Core Excavations Brading
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3055 New Road, Brading, Isle Of Wight
16 March — 18 March
Delays likely Road closure
Works location: Brading: From The Mall To Yarbridge (Ml’ 310035,6,7): New Road-Brading
Works description: Surfacing Post Works. Excavate And Made Good 3 X Soft Spots And Repair Manhole Cover And Frames Brading
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3330/B3340 Nettlestone Hill, Seaview, Isle Of Wight
16 March — 16 May
Delays likely Road closure
Works location: Seaview: The Three Lengths Surrounding Nettlestone Green (Ml330083): Nettlestone Hill-Seaview:; Cw Cip Scheme Cw Cip Sch
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Seavie
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3330 Nettlestone Green, Nettlestone, Isle Of Wight
16 March — 16 May
Delays likely Road closure
Works location: Nettlestone: From Caws Avenue To Elm Close (Ml330082): Nettlestone Green-Nettlestone
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Nettlestone
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Hooke Hill, Freshwater, Isle Of Wight
16 March — 16 May
Delays likely Road closure
Works location: Freshwater: From School Green Road To Copse Lane (Ml 630276): Hooke Hill-Freshwater
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3 Strengthen 25mm Ul-M 65psv And 85mm Foambase Urban-:H/3(Kerbed=Inlay/Unkerbed=Overlay) Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3323 High Street, Newport, Isle Of Wight
16 March — 22 March
Delays possible Some carriageway incursion
Works location: O/S 111-113
Works description: Scaff. App. 111-113 High Street – 16/03 – 18/03
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3323 Pyle Street, Newport, Isle Of Wight
17 March — 24 March
Delays possible Some carriageway incursion
Works location: Os 114
Works description: Gsmr/Hse Cut Off – So55358
Responsibility for works: SGN
Current status: Advanced planning
B3326 Melville Street, Ryde, Isle Of Wight
17 March — 18 March
Delays possible Traffic control (Stop/Go boards)
Works location: Side Of 11 Melville Street, Ryde, Isle Of Wight
Works description: Ryde (Pcp 13) Remedial Works To Rectify Ha Defect In Carriageway
Responsibility for works: BT
Current status: Advanced planning
B3330 Eddington Road, St Helens, Isle Of Wight
16 March — 18 March
Delays possible Traffic control (two-way signals)
Works location: St Helens: From The Old Rectory Through To St Helens Church: Eddington Road-St Helens
Works description: Clearing Debris From Gulleys St Helens
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3399 Brook Shute, Brook, Brighstone, Isle Of Wight
17 March — 21 March
Delays possible Traffic control (two-way signals)
Works location: Brighstone: From Junction With Hulverstone Road, 390m North, Ml 630115: Brook Shute-Brighstone
Works description: Works To Accesses To Allow For Resurfacing Brighstone
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
High Street, Seaview, Isle Of Wight
16 March — 16 March
Delays possible Traffic control (Stop/Go boards)
Works location: Seaview: From Junction With Madeira Road Down Towards The Sea, 155m, Ml 330507: High Street-Seaview
Works description: Road Core Excavations Seaview
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3020 Mill Hill Road, Cowes, Isle Of Wight
16 March — 18 March
Delays unlikely Traffic control (give & take)
Works location: Cowes: Loc 1 – Opposite The Junction Of York Street. Loc 2 – Just West Of The Junction Of Bernard Road. Loc 3 – Just E
Works description: Replacement Of N� 6 Signs (2 X No Right Turn, 1 X Give Way & 3 X No Left Turn) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3054 Union Street, Ryde, Isle Of Wight
16 March — 29 March
Delays unlikely Some carriageway incursion
Works location: Long Johns
Works description: Scaff. App. Long Johns, Union St. Ryde – 16/03 – 29/03
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3055 Albert Street, Ventnor, Isle Of Wight
17 March — 18 March
Delays unlikely Some carriageway incursion
Works location: S/O 59 Albert Street,Ventnor, Po38 1eu
Works description: Ventnor (13) Remedial Works To Rectify Ha Defect In Carriageway,
Responsibility for works: BT
Current status: Advanced planning
A3055 High Street, Ventnor, Isle Of Wight
16 March — 24 March
Delays unlikely Some carriageway incursion
Works location: Flat Adj To 26a
Works description: Lay New Service From Nearside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning
B3320 Arctic Road, Cowes, Isle Of Wight
16 March — 18 March
Delays unlikely Traffic control (give & take)
Works location: Cowes: At Both Junctions Of Newport Road & Arctic Road (Ml 140216 & Ml 140031):
Works description: Replacement Of N� 2 Signs (2 X Give Way) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3329/A3055 Avenue Road, Sandown, Isle Of Wight
17 March — 17 March
Delays unlikely No carriageway incursion
Works location: S58 Applies To C/Way Only, Opp 12, Avenue Road
Works description: Remedial Notice To Rectify Ha Defect
Responsibility for works: BT
Current status: Advanced planning
B3341 Medina Avenue, Newport, Isle Of Wight
16 March — 18 March
Delays unlikely Traffic control (give & take)
Works location: Newport: Column 22, Opposite Number 74 (Ml 240141):
Works description: ** Private Job ** Relocation Of Street Lighting Column Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3395 Culver Parade, Sandown, Isle Of Wight
16 March — 18 March
Delays unlikely Traffic control (give & take)
Works location: Sandown: Opposite The Junction Of Fort Street (Ml 430100): Opp Fort St
Works description: Cip Ticket Machine Scheme Please Supply/ Install New Car Parking Ticket Machine To Replace Old One Sandown
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Langbridge, Newchurch, Isle Of Wight
16 March — 18 March
Delays unlikely Traffic control (give & take)
Works location: Newchurch: From The Shute 200m North (Ml 430126): Langbridge-Newchurch
Works description: Surfacing Preparatory Works, Kerbing To Traffic Calming And Adjustment Of Sign Height To Accomodate Changes In Carriageway Level Newchurch
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Victoria Road, Cowes, Isle Of Wight
16 March — 18 March
Delays unlikely Traffic control (give & take)
Works location: Cowes: Column 11 – Opposite Fellows Road (Ml 142191):
Works description: ** Private Job ** Relocation Of Street Lighting Column Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Church Road, Binstead, Isle Of Wight
16 March — 22 March
Delays unlikely Traffic control (give & take)
Works location: Binstead: Whole Length Of Road, Ml 340502: Church Road-Binstead
Works description: Footway Re-Construction And Surfacing (Fwl : Bit 50% Partrecon Fwr : Bit Partrecon) Binstead
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Church Road, Havenstreet, Isle Of Wight
17 March — 25 March
Delays unlikely Some carriageway incursion
Works location: Os Leopards Barn, Havenstreet Main Road
Works description: Lay New Service From Nearside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning
Love Lane, Cowes, Isle Of Wight
16 March — 18 March
Delays unlikely Traffic control (give & take)
Works location: Cowes: Loc 1 – Opposite The Entrance To Wight Fibre. Loc 2 – Opposite Rogerson Close. Loc 3 – At The Junction Of Mill
Works description: Replacement Of N� 5 Signs (2 X No Entry, 1 X Turn Left, 1 X Two Way Traffic & 1 X Give Way) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Luccombe Road, Shanklin, Isle Of Wight
16 March — 18 March
Delays unlikely Some carriageway incursion
Works location: S58 N/A See Job Pack. Jcn Of Luccombe Village Road, On, Luccombe Road
Works description: Remedial Notice To Rectify Ha Defect
Responsibility for works: BT
Current status: Advanced planning
Luccombe Road, Shanklin, Isle Of Wight
17 March — 18 March
Delays unlikely Some carriageway incursion
Works location: O/S Upper Chine Cottage To O/S Bourne Hall Country Hotel, Luccombe Road
Works description: Interim Reinstatement To Permenant Reinstatement
Responsibility for works: BT
Current status: Advanced planning
Quay Path, Newport, Isle Of Wight
17 March — 18 March
Delays unlikely Traffic control (give & take)
Works location: Newport: Link Footway From Coppins Bridge Around The New Flats To Driveway At Top Of Snooks Hill, Ml F20284: Quay Path-N
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Ranelagh Road, Lake, Isle Of Wight
17 March — 21 March
Delays unlikely Some carriageway incursion
Works location: Ranelagh Road
Works description: Remedial Notice To Rectify Ha Defect
Responsibility for works: BT
Current status: Advanced planning
South Street, Ryde, Isle Of Wight
17 March — 23 March
Delays unlikely Some carriageway incursion
Works location: O/S 4
Works description: Skip App. 4 South Street, 17/03 – 23/03
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
St Johns Crescent, Sandown, Isle Of Wight
16 March — 23 March
Delays unlikely Some carriageway incursion
Works location: Os 36
Works description: Gsmr/Hse Cut Off – So55362
Responsibility for works: SGN
Current status: Advanced planning
The Glade, Lake, Isle Of Wight
17 March — 21 March
Delays unlikely Some carriageway incursion
Works location: The Glade
Works description: Remedial Notice To Rectify Ha Defect
Responsibility for works: BT
Current status: Advanced planning
Union Road, Ryde, Isle Of Wight
16 March — 24 March
Delays unlikely Some carriageway incursion
Works location: Os 47a
Works description: Lay New Service From Nearside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning
Ventnor Footpath 88a, Ventnor, Isle Of Wight
17 March — 18 March
Delays unlikely Traffic control (give & take)
Works location: Ventnor: Link Footway Around Back Of Steephill Cove, Ml F50730: Ventnor Footpath 88a-Ventnor
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon) Ventnor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Image: Hills_Alive under CC BY 2.0