Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org
A3020 St Georges Way, Newport, Isle Of Wight
20 August — 21 August Traffic control (two-way signals)
Delays likely due to Streetworks
Carriageway Repairs X9 P/Hs & Clear Out Weeds/ Grass From Aco Drainage Chanel 12 Meters Defects Not To Be Cut Due To Traffic Sensor Wires – Via Fix Ok 0.7mx0.25mx85mm 0.7mx0.2mx35mm X7 0.5mx0.2mx30mm Tm Stop & Go & Recommend Evening Works (Cw: Pothole) Newport at Newport: N/B C/W (Town Centre Lane) From Roundabout To Lights At Coppins Bridge: St Georges Way-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
B3323 Carisbrooke Road, Newport, Isle Of Wight
20 August — 21 August Traffic control (Stop/Go boards)
Delays likely due to Streetworks
Carriageway Repairs, Saw Cut & Infill X3 P/Hs At The Jct 0.7mx0.4mx27mm 0.4mx0.3mx30mm 0.6mx0.4mx30mm Tm Three Way Lights Req (Cw: Pothole) Newport at Newport: X2 P/Hs On Carisbrooke Rd, J/O Trafalgar Rd & X1 P/H Trafalgar Rd J/O Carisbrooke Rd: Carisbrooke Road-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
B3323 Carisbrooke Road, Newport, Isle Of Wight
20 August — 28 August Traffic control (give & take)
Delays likely due to Streetworks
Lay New Service From Nearside Footway To Site at Os 13a
Responsibility: SGN
EToN status: Advanced planning
B3323 High Street, Newport, Isle Of Wight
19 August — 19 August Road closure
Delays likely due to Streetworks
Illuminated Carnival Processions – Wednesday 19th August 2015 at Lower Furrlongs, South Street, Upper St James Street, Trafalgar Road, Carisbrooke Road, High Street, Quay Street.
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Work in progress
B3323 St James Street, Newport, Isle Of Wight
20 August — 21 August Traffic control (give & take)
Delays likely due to Streetworks
Carriageway Repairs Reinstate 1m2 Around Stop Valve And Hydrant (Carriageway Surround Picking Out) Tm Four Way Lights Req, Also Recommend Out Of Hrs Works (Cw: Pothole) Newport at Newport: Hunny Cross Way Junction, Newport, N/B C/W (Jct Of Vicarage Way): St James Street-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
B3330 Alexandra Road, Ryde, Isle Of Wight
19 August — 19 October Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H2, Resurface 25mm Ul-M 65psv Channel Plane-Urban:H2) Ryde at Ryde: From St Johns Hill To Gassiot Green Road (Ml 320239a): Alexandra Road-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
B3401 High Street, Carisbrooke, Isle Of Wight
19 August — 28 August Traffic control (two-way signals)
Delays likely due to Streetworks
Replace Cover & Frame at 65 Carisbrooke High St Newport Isle Of
Responsibility: Southern Water
EToN status: Advanced planning
B3401 Main Road, Thorley, Isle Of Wight
20 August — 20 October Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Thorley at Thorley: From 190m Southeast Of Broad Lane A Further 210m Southeast (Ml630148): Main Road-Thorley
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
B3401 Main Road, Thorley, Isle Of Wight
20 August — 20 October Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Thorley at Thorley: From 190m Southeast Of Broad Lane A Further 250m Southeast (Ml630147): Main Road-Thorley
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Great Preston Road, Ryde, Isle Of Wight
19 August — 19 October Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H2, Resurface 25mm Ul-M 65psv Channel Plane-Urban:H2) Ryde at Ryde: From Harding Road To Gassiot Green Road (Ml 320239): Great Preston Road-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Firestone Copse Road, Wootton, Isle Of Wight
19 August — 19 October Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Fibrovia:R/H4, Resurface 30mm Fibrovia Plus Regulating/Patching (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H4) Wootto at Wootton: From Havenstreet Main Road 430m West (Ml340526): Firestone Copse Road-Wootton:; Eric Longworth
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Firestone Copse Road, Wootton, Isle Of Wight
19 August — 19 October Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Fibrovia:R/H4, Resurface 30mm Fibrovia Plus Regulating/Patching (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H4) Wootto at Wootton: From A Point 50m South Of Firestone Glade For A Further 320m South (Ml340523): Firestone Copse Road-Wootton:; E
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Firestone Copse Road, Wootton, Isle Of Wight
19 August — 19 October Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4) Wootto at Wootton: From Newnham Lane 605m West (Ml340524): Firestone Copse Road-Wootton:; Eric Longworth
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Firestone Copse Road, Wootton, Isle Of Wight
19 August — 19 October Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Fibrovia:R/H4, Resurface 30mm Fibrovia Plus Regulating/Patching (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H4) Wootto at Wootton: From Newnham Lane 570m South (Ml340525): Firestone Copse Road-Wootton:; Eric Longworth
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Stroud Wood Road, Havenstreet, Ryde, Isle Of Wight
19 August — 21 August Traffic control (Stop/Go boards)
Delays possible due to Streetworks
Warning Sign Leaning Forward By 30% Requires Resetting Unable To Photograph As Road Too Dangerous Tm – Two Way Temp Lights (Sg: Sign Mis-Aligned) Ryde at Ryde: On The Havenstreet Bound Side Of The C/Way 100m Past Stroud A Farm: Stroud Wood Road-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Upper Road, Brading, Isle Of Wight
19 August — 21 August Traffic control (two-way signals)
Delays possible due to Streetworks
Saw Cut & Infill 1200x300x60mm, 100x400x50mm, 500x300x50mm, 400x300x50mm, 1300x500x70mm, 500x300x40mm, 500mm Diam X 70mm, 400x500x60mm. Tm=Road Closure (Cw: Pothole) Brading at Brading: Between Jct Bully’S Hill & Jct Well Lane: Upper Road-Brading
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
A3054 Lind Street, Ryde, Isle Of Wight
19 August — 21 August Some carriageway incursion
Delays unlikely due to Streetworks
Install Water Main Connection In Lind Street at Ryde Travel Lodge, Lind Hill,Ryde,Iow.
Responsibility: Southern Water
EToN status: Advanced planning
A3055 New Road, Brading, Isle Of Wight
19 August — 21 August No carriageway incursion
Delays unlikely due to Streetworks
Install 14m Of 1 Way Poly Duct In Verge,Install 1m Of 1 Way Poly Duct In Footway at S58 Not Affected. Side Of 5, New Road
Responsibility: BT
EToN status: Advanced planning
A3055 North Road, Shanklin, Isle Of Wight
19 August — 21 August No carriageway incursion
Delays unlikely due to Streetworks
Excavation Of Small Section Of Footway For 2 New Electrical Connections To 2 New Properties At 68 North Rd at From O/S 60 North Rd To Junc Of Atherley Road
Responsibility: Southern Electric
EToN status: Advanced planning
Atherley Road, Shanklin, Isle Of Wight
19 August — 21 August No carriageway incursion
Delays unlikely due to Streetworks
Build 1 Concrete Chamber 915mm X 445mm X 965mm Deep In Footway,Install 4m Of 1 Way Poly Duct In Footway at O/S 22, Atherley Road
Responsibility: BT
EToN status: Advanced planning
Ward Avenue, Cowes, Isle Of Wight
20 August — 24 August Some carriageway incursion
Delays unlikely due to Streetworks
Renew Broken Fire Hydrant In Footway. at 55 Ward Avenue, Cowes,Isle Of Wight .
Responsibility: Southern Water
EToN status: Advanced planning
Lind Hill, Ryde, Isle Of Wight
19 August — 21 August No carriageway incursion
Delays unlikely due to Streetworks
Build 1 Concrete Chamber 915mm X 445mm X 965mm Deep In Footway,Install 1m Of 1 Way Poly Duct In Footway at 29m South Of Junc Lind Street, Lind Hill
Responsibility: BT
EToN status: Advanced planning
Melville Street, Sandown, Isle Of Wight
20 August — 03 September Traffic control (give & take)
Delays unlikely due to Streetworks
Excavation Of Joint Bay In Footway And Road For New Electrical Connections To 2 New Properties, at From Junc Of Broadway To Junc Of Nunwell St
Responsibility: Southern Electric
EToN status: Advanced planning
Union Road, Cowes, Isle Of Wight
19 August — 26 August Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (Aj Scaffold) at O/S 5
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
York Street, Cowes, Isle Of Wight
19 August — 28 August Traffic control (give & take)
Delays unlikely due to Streetworks
Relay Service From Farside Carriageway at Os 60
Responsibility: SGN
EToN status: Advanced planning