Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org
A3055 Brading Road, Ryde, Isle Of Wight
01 October — 02 October Traffic control (two-way signals)
Delays likely due to Streetworks
Idr – F/Way Cracking Away Towards The Verge Requires Resurfacing Patch Appx 20.0 X 1.0 X 50/100mm Tm – Two Way Temp Lights (Fw: Fw/Cyclep Ridge) Ryde at Ryde: From Bartletts Green Farm Towards Tesco Roundabout For Appx 20m: Brading Road-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
A3055 Rowborough Lane, Brading, Isle Of Wight
01 October — 01 December Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H1 Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Rural:H1(Kerbed=Inlay/Unkerbed=Overlay) Brading at Brading: 300m North Of Coach Lane To 640m North Of Coach Lane (Ml 310041): Rowborough Lane-Brading
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
A3055 Rowborough Lane, Brading, Isle Of Wight
01 October — 01 December Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H1 Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Rural:H1(Kerbed=Inlay/Unkerbed=Overlay) Brading at Brading: From Coach Lane 300m North Thereof (Ml 310040): Rowborough Lane-Brading
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
A3055 Rowborough Lane, Brading, Isle Of Wight
01 October — 01 December Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H1 Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Rural:H1(Kerbed=Inlay/Unkerbed=Overlay) Brading at Brading: From 640m North Of Coach Lane To Carpenters Road (Ml 310042): Rowborough Lane-Brading
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Chale Lane, Chale, Isle Of Wight
01 October — 01 December Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4 Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4 (Kerbed=Inlay/Unkerbed=Overlay) Chale at Chale: From Emmett Hill To Junction With Gladices Lane (Ml 540285): Chale Lane-Chale
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Chale Lane, Chale, Isle Of Wight
01 October — 01 December Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4 Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4 (Kerbed=Inlay/Unkerbed=Overlay) Chale at Chale: From Junction With Gladices Lane To Pyle Shute/Newman Lane (Ml 540146): Chale Lane-Chale
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Corve Hill, Shorwell, Isle Of Wight
01 October — 01 December Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4 (Kerbed=Inlay/Unkerbed=Overlay) Shorwell at Shorwell: From Farriers Way To Junction With Pound Lane (Ml 640430): Corve Hill-Shorwell
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Park Lane, Shorwell, Isle Of Wight
01 October — 01 December Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4 (Kerbed=Inlay/Unkerbed=Overlay) Shorwell at Shorwell: From Junction Of Pound Lane 498m South (Ml 640444): Park Lane-Shorwell
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Park Lane, Shorwell, Isle Of Wight
01 October — 01 December Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4 (Kerbed=Inlay/Unkerbed=Overlay) Shorwell at Shorwell: From Junction With New Road 328m North (Ml 640445): Park Lane-Shorwell
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
B3329 High Street, Sandown, Isle Of Wight
01 October — 02 October Traffic control (multi-way signals)
Delays possible due to Streetworks
Trial Hole In Carriageway In Order To Assess The Pavement Condition Before Treatment Sandown at Sandown: (Ml 420095) Junction With Victoria Road, On The Roundabout: High Street-Sandown
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Whiterails Road, Newport, Isle Of Wight
01 October — 05 October Traffic control (two-way signals)
Delays possible due to Streetworks
Surfacing Preparatory Works, Replacing And Relaying Kerbs Newport at Newport: From Park Road 330m Southwest (Ml 320169). Works Will Be Carried Out On Access 3 Separate Properties Along The
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Adelaide Place, Ryde, Isle Of Wight
01 October — 07 October Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit 50% Partrecon) Ryde at Ryde: From The Junction Of Ratcliffe Avenue To West Street (Ml 342441): Adelaide Place-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Arthur Street, Ryde, Isle Of Wight
01 October — 08 October Some carriageway incursion
Delays unlikely due to Streetworks
Skip (Reynolds And Read) at O/S 67
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
B3329 High Street, Sandown, Isle Of Wight
01 October — 10 October Some carriageway incursion
Delays unlikely due to Streetworks
Skip (Weaver Bros) at O.S 97 – 101
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Rew Street, Gurnard, Isle Of Wight
02 October — 06 October No carriageway incursion
Delays unlikely due to Streetworks
Replace 1 Existing Pole at Approx 140m South Of Opp Ent To Hillside Rew Street , Rew Street
Responsibility: BT
EToN status: Advanced planning
Cedar Wood Drive, Nettlestone, Isle Of Wight
01 October — 07 October Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Nettlestone at Nettlestone: Whole Length Of Road From Caws Avenue To Orchard Road (Ml 340457): Cedar Wood Drive-Nettlestone
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Gregory Avenue, Nettlestone, Isle Of Wight
01 October — 07 October Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing (Fwl : Con 33% Bayrepl Fwr: Con 33% Bayrepl) Nettlestone at Nettlestone: From Junction With Nettlestone Hill 171m East (Ml 340537): Gregory Avenue-Nettlestone
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Gregory Close, Nettlestone, Isle Of Wight
01 October — 07 October Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Nettlestone at Nettlestone: Whole Length Of Cul De Sac (Ml 361537): Gregory Close-Nettlestone
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Paddock Drive, Bembridge, Isle Of Wight
01 October — 07 October Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing (Fwl : Bit Partrecon Fwr: Bit Partrecon) Bembridge at Bembridge: Junction Of Howgate Road To End Of Paddock Drive (Ml 340268): Paddock Drive-Bembridge
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Park Road, Brading, Isle Of Wight
01 October — 07 October Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re Construction And Surfacing (Fwl : Bit Partrecon Fwr: Bit Partrecon) Brading at Brading: From Coach Lane To End Of Park Road (Ml 340316): Park Road-Brading
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Windmill Close, Ryde, Isle Of Wight
01 October — 07 October Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Ryde at Ryde: From Junction Of Upton Road – To The End Of Windmill Close (Ml 34034): Windmill Close-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning