Road works road closed signs

Isle of Wight roadworks and road closures 20th January 2016

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Isle of Wight roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

20 January — 22 January Traffic control (two-way signals)
Delays likely due to Streetworks
Three Road Core Excavations Godshill at Godshill: Ml 510010 From Hollow Lane To Church Lane – Three Cores To Be Taken Equidistant Throughout Ml: High Street-God
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3020 Horsebridge Hill, Newport, Isle Of Wight
21 January — 25 January Traffic control (multi-way signals)
Delays likely due to Streetworks
– Replace Cover And Frame In Carriageway Between 09:30-15:30 at Horsebridge Hill Junction With Noke Common, Newport
Responsibility: Southern Water
EToN status: Advanced planning

A3054 Yarmouth Road, Calbourne, Isle Of Wight
21 January — 22 January Traffic control (Stop/Go boards)
Delays likely due to Streetworks
Permanent Reinstatement In Carriageway at In Cw Approx 182m West Of Opp Pondacre Farm Ent On , Yarmouth Road
Responsibility: BT
EToN status: Advanced planning

A3055 New Road, Brading, Isle Of Wight
20 January — 22 January Traffic control (two-way signals)
Delays likely due to Streetworks
Idr – F/Way Surface Is Crazed And Breaking Up Requires Patching 3.25 X 1.20 X 50/100mm Tm – F/Way Closure (And If C/Way Incursion Req’D – Two Way Temp Lights) (Fw: Fw/Cyclep Pothole) Brading at Brading: O/S No.56 Lynton: New Road-Brading
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3020 Newport Road, Godshill, Isle Of Wight
20 January — 22 January Traffic control (multi-way signals)
Delays possible due to Streetworks
Sent To Scheduler 17.12.2015 Idr – 3 X Plastic Bollards Are Unserviceable Require Replacing With New Ones Tm – Three Way Temp Lights (H: Street Furnitre Faulty/Dmge) Godshill at Godshill: On The Verge At The Bend Just Past The Merstone Lane Jnc By The Rspca Centre: Newport Road-Godshill
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Avenue Road, Freshwater, Isle Of Wight
20 January — 22 January Traffic control (two-way signals)
Delays possible due to Streetworks
Three Road Core Excavations Freshwater at Freshwater: Ml 620050 From Princes Road To School Green Road – Three Cores To Be Taken Equidistant Throughout Ml : Av
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3330/B3340 Nettlestone Hill, Seaview, Isle Of Wight
20 January — 22 January Traffic control (two-way signals)
Delays possible due to Streetworks
Three Road Core Excavations Seaview at Seaview: Ml 320086 Approx 185 Metres North And East Of The Junction Of Gregory Avenue And Approx 87 Metres South Of Greg
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3340 Seaview Lane, Nettlestone, Isle Of Wight
20 January — 22 January Traffic control (two-way signals)
Delays possible due to Streetworks
Three Road Core Excavations Nettlestone at Nettlestone: Ml330102 From Nettlestone Green To Holgate Lane – Three Cores To Be Taken Equidistant Throughout Ml: Seavie
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3340 Seaview Lane, Nettlestone, Isle Of Wight
20 January — 29 January Traffic control (two-way signals)
Delays possible due to Streetworks
Relay Service From Farside Carriageway To Site at Os Canoelbra
Responsibility: SGN
EToN status: Advanced planning

Noke Common, Newport, Isle Of Wight
21 January — 25 January Traffic control (multi-way signals)
Delays possible due to Streetworks
– 3 Way Traffic Lights Required In Conjunction With Cover And Frame Replacement Between 09:30-15:30 at Noke Common Junction With Horsebridge Hill Newport
Responsibility: Southern Water
EToN status: Advanced planning

Billingham Shute, Shorwell, Isle Of Wight
21 January — 22 January Traffic control (two-way signals)
Delays possible due to Streetworks
Chillerton 324210 2 Way Lights Required For Access. Excavate For 4 New Bt Openreach Poles Verge To Facilitate Overhead Spine Cabling Works at Os Billingham Cottages To Os West Billingham Farm, Billingham Shute, Shorwell
Responsibility: BT
EToN status: Advanced planning

Niton Road, Rookley, Isle Of Wight
20 January — 22 January Traffic control (two-way signals)
Delays possible due to Streetworks
Three Road Core Excavations Rookley at Rookley: From Dolcroft Road 260m South (Ml630242): Niton Road-Rookley
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Brading Down Road, Brading, Isle Of Wight
20 January — 20 January Traffic control (two-way signals)
Delays possible due to Streetworks
Road Core Excavations Brading at Brading: From Ashey Road To 590m Southeast Thereof (Ml310134): Brading Down Road-Brading
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Brading Down Road, Brading, Isle Of Wight
20 January — 20 January Traffic control (two-way signals)
Delays possible due to Streetworks
Road Core Excavations Brading at Brading: Ml 310139 From Approx 725 Metres To 1375 Metres From The Junction With Bullys Hill: Brading Down Road-Brading
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Brading Down Road, Brading, Isle Of Wight
20 January — 20 January Traffic control (two-way signals)
Delays possible due to Streetworks
Road Core Excavations Brading at Brading: Ml 310135 From Approx 590 Metres To 1002 Metres From The Junction With Ashey Road: Brading Down Road-Brading
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Brading Down Road, Brading, Isle Of Wight
20 January — 20 January Traffic control (two-way signals)
Delays possible due to Streetworks
Road Core Excavations Brading at Brading: Ml 310136 From Approx 1002 Metres To 1504 Metres From The Junction With Ashey Road: Brading Down Road-Brading
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Park Road, Ryde, Isle Of Wight
20 January — 22 January Traffic control (multi-way signals)
Delays possible due to Streetworks
Sent To Scheduler 02.12.2015 Sawcut And Infill Wheel Push With Fretting And Surrounding C/Way Surface Is Crazed 4.20 X 1.60 X 50/100mm Tm – Suggested Three Way Temp Lights (Cw: Pothole) Please Close, Further Works May Be Required If Lines Need Refreshing H3 Urban Ryde at Ryde: O/S Southlands Mews Flats In Park Road, Ryde Almost Opposite Dover Street: Park Road-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Springvale Road, Seaview, Isle Of Wight
20 January — 22 January Traffic control (two-way signals)
Delays possible due to Streetworks
Three Road Core Excavations Seaview at Seaview: Ml 330379 From Puckpool Hill To Oakhill Road – Three Cores To Be Taken Equidistant Throughout Ml: Springvale Ro
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3054 John Street, Ryde, Isle Of Wight
20 January — 22 January Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 1 Lantern (N? 1 Column) 1 Route/Direction Sign, 1 Basket & 1 Festive Decoration Ryde at Ryde: From Victoria Street, East To Column 1 (Ml 341284):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3054 Union Street, Ryde, Isle Of Wight
20 January — 22 January Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 2 Lanterns (N? 1 Column) 1 Cctv Camera & 2 Route/Direction Signs Ryde at Ryde: At The Junction Of Cross Street & Union Street (Ml 310028):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Esplanade, Ryde, Isle Of Wight
20 January — 22 January Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 31 Lanterns (N? 18 Columns) 1 No Waiting Sign, 3 Route/Direction Signs, 1 Resident Parking Permit Sign, 4 Warning Signs, 5 Lit Warning Signs, 14 Double Baskets & 1 Cctv Camera Ryde at Ryde: From The Junction Of St Thomas Street, East To Dover Street (Ml 310030, Ml 310060, Ml 310061, Ml 310062, Ml 310063
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3056 Arreton Street, Arreton, Isle Of Wight
20 January — 22 January No carriageway incursion
Delays unlikely due to Streetworks
Install 1m Of 1 Way Poly Duct In Verge,Provide 1 Core Drill(S) Into Jointbox Or Building at Os Beresford On, Arreton Street
Responsibility: BT
EToN status: Advanced planning

B3322 The Broadway, Totland, Isle Of Wight
21 January — 22 January No carriageway incursion
Delays unlikely due to Streetworks
Permanent Reinstatement In Footway at In Cw O/S Public House Jcn Madeira Rd On, The Broadway
Responsibility: BT
EToN status: Advanced planning

B3323 Pyle Street, Newport, Isle Of Wight
21 January — 03 February No carriageway incursion
Delays unlikely due to Streetworks
Excavate In Footway For New Electric Supply at O/S 67
Responsibility: Southern Electric
EToN status: Advanced planning

Beatrice Avenue, East Cowes, Isle Of Wight
21 January — 29 January Some carriageway incursion
Delays unlikely due to Streetworks
Lay New Service From Nearside Carriageway To Site at Os St Mildred’S Church
Responsibility: SGN
EToN status: Advanced planning

Clarendon Road, Shanklin, Isle Of Wight
20 January — 22 January Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 1 Lantern (N? 1 Column) Shanklin at Shanklin: At The Junction Of Crescent Road & Clarendon Road (Ml 440245):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Newnham Road, Binstead, Isle Of Wight
21 January — 23 January No carriageway incursion
Delays unlikely due to Streetworks
Provide 4 New Poles And Recover 4 Redundent Poles at O/S 3 Newnham Lane To El Pole O/S Upton Stables , Newnham Road, Isle Of Wight ,Po33 4ed
Responsibility: BT
EToN status: Advanced planning

Grangeside, Ventnor, Isle Of Wight
20 January — 21 January Some carriageway incursion
Delays unlikely due to Streetworks
Provide 1 New Pole at O/S Grange Court, Grangeside
Responsibility: BT
EToN status: Advanced planning

Grayswood Close, Sandown, Isle Of Wight
21 January — 25 January Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Sandown at Sandown: Whole Length Of Road From Junction With Grove Road, 102m, Ml 461349: Grayswood Close-Sandown
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Green Lane, Northwood, Isle Of Wight
21 January — 25 January No carriageway incursion
Delays unlikely due to Streetworks
Remedial Notice To Re Excavate In Footway at Sd7dcc46, O/S 19 On, Green Lane
Responsibility: BT
EToN status: Advanced planning

Grove Road, Ventnor, Isle Of Wight
21 January — 25 January No carriageway incursion
Delays unlikely due to Streetworks
Remedial Notice To Re Excavate In Footway at Sd7ejw19, Opp Primrose Bank, Grove Road
Responsibility: BT
EToN status: Advanced planning

Lovett Way, Shanklin, Isle Of Wight
20 January — 22 January No carriageway incursion
Delays unlikely due to Streetworks
Remedial Notice Required To Re Excavate Footway Maintenance Dig. at Sd7eja29, O/S 1, Lovett Way
Responsibility: BT
EToN status: Advanced planning

North Walk, Ryde, Isle Of Wight
20 January — 22 January Traffic control (give & take)
Delays unlikely due to Streetworks
Install N? 49 Lanterns (N? 25 Columns) 3 Route/Direction Signs, 16 Resident Parking Permits & 19 Warning Signs Ryde at Ryde: From The Esplanade, North, Then East To Appley Lane (Ml 310059, Ml 340582, Ml 340583, Ml 341319 & Ml 341583):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Pound Path, Freshwater, Isle Of Wight
20 January — 22 January No carriageway incursion
Delays unlikely due to Streetworks
Renew Decayed Pole Dp90 With An 11metre Medium Pole at Pound Green Jjunction Camp Road, Freshwater, Isle Of Wight
Responsibility: BT
EToN status: Advanced planning

Salisbury Road, Ryde, Isle Of Wight
20 January — 22 January Some carriageway incursion
Delays unlikely due to Streetworks
– Install New Water Connection at 27 Salisbury Road , Ryde, Isle Of Wight.
Responsibility: Southern Water
EToN status: Advanced planning

Southdown, Chale, Isle Of Wight
20 January — 21 January Some carriageway incursion
Delays unlikely due to Streetworks
Chale Green 325068 To Provide 5 New Bt Poles To Facilitate Overhead Spine Cabling Works at From Opp Box Cottage To So Southdown Corner, Southdown, Chale
Responsibility: BT
EToN status: Advanced planning

Sylvan Drive, Newport, Isle Of Wight
21 January — 22 January No carriageway incursion
Delays unlikely due to Streetworks
2 Permanent Reinstatements In Footway at In Fw O/S 1 The Limes & In Fw O/S 80-82, Sylvan Drive
Responsibility: BT
EToN status: Advanced planninghttps://www.facebook.com/scotshotprints

Image: Stew Dean under CC BY 2.0