Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org
A3054 Quarr Hill, Binstead, Isle Of Wight
21 October — 23 October Traffic control (two-way signals)
Delays likely due to Streetworks
Reset Gully Frame And Cover To Level. If Damaged Or Worn, Replace With New. Tm=2 X Way Traffic Lights Close Further Works Required Lines Need Refreshing Binstead at Binstead: O/Side Woodstock: Quarr Hill-Binstead – 788
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
A3055 Marlborough Road, Ryde, Isle Of Wight
21 October — 21 December Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1) Ryde at Ryde: From Somerset Road Heading North To Arundel Road (Ml 310053): Marlborough Road-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
A3020 Coppins Bridge, Newport, Isle Of Wight
20 October — 26 October Some carriageway incursion
Delays possible due to Streetworks
Skip (Westridge Skip Hire) at On The Verge In Middle Of Coppins Bridge
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
A3055 Military Road, Freshwater, Isle Of Wight
21 October — 23 October Traffic control (two-way signals)
Delays possible due to Streetworks
Backfill With Soil The Rut Between The Nearly Surface C/W And The Grass Verge. Tm 2 Way Lights Freshwater at Freshwater: The New Resurfaced Areas (Last Year) By Brook Chine Car Park, Almost Opposite Brook Village Road: Military R
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
A3056 Arreton Street, Arreton, Isle Of Wight
20 October — 02 November Traffic control (two-way signals)
Delays possible due to Streetworks
Newport 50 Street Cabinet & Power Installation. Excavate To Lay Approx 6m Bt Ducts, Lay Concrete Plinth, Stand Cab. Excavate To Expose Low Voltage Cable For Power Connection And Lay Approx 77 Duct. Reinstate, Check And Clear Site. at Approx 50m West Of, To Side Of White Lion Pub, Arreton Street
Responsibility: BT
EToN status: Advanced planning
B3327 Clarence Road, Wroxall, Isle Of Wight
21 October — 28 October Traffic control (two-way signals)
Delays possible due to Streetworks
Surfacing Preparatory Works, Replacing And Relaying Kerbs. Wroxall at Wroxall: Ml 520073 Various Access’S And Verges From No 58 To Homelands Pit Farm: Clarence Road-Wroxall
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Arreton Footpath 12, Arreton, Isle Of Wight
20 October — 02 November Some carriageway incursion
Delays unlikely due to Streetworks
Newport 50 Street Cabinet & Power Installation. Excavate To Expose Low Voltage Cable For Power Connection And Lay Approx 24m Duct. Power Engineer To Carry Out Inspection Prior To Jointing. Power Jointing Team To Insert Cable And Execute Jointing Works. Reinstate, Check And Clear Site. at So White Lion Pub, Arreton Footpath 12, Arreton
Responsibility: BT
EToN status: Advanced planning
B3395 Church Road, Bembridge, Isle Of Wight
20 October — 23 October Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Bembridge at Bembridge: Whole Length Of Road From High Street To Sherbourne Street (Ml 330123): Church Road-Bembridge
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Broadway Crescent, Binstead, Isle Of Wight
20 October — 22 October Some carriageway incursion
Delays unlikely due to Streetworks
Install 11m Of 1 Way Poly Duct In Verge,Install 2m Of 1 Way Poly Duct In Footway,Install 5m Of 1 Way Poly Duct In Carriageway at O/S 106 To O/S 104, Broadway Crescent
Responsibility: BT
EToN status: Advanced planning
Queens Road, Freshwater, Isle Of Wight
21 October — 22 October Some carriageway incursion
Delays unlikely due to Streetworks
Renew Dp90 With 11m Medium Pole. Renew 9 Drop Wires And Rehang 2 X Light Weight Aerial Cables at Dp90 Junction Of Pound Green And Camp Road
Responsibility: BT
EToN status: Advanced planning
Main Road, Alverstone, Isle Of Wight
20 October — 21 October Some carriageway incursion
Delays unlikely due to Streetworks
Remedial Work On Ha Defect. at (Pcp6) 457770,85557457764,85565 Opposite Station House Across Carriageway To Outside Station House
Responsibility: BT
EToN status: Advanced planning
Staplers Road, Newport, Isle Of Wight
21 October — 03 November Traffic control (give & take)
Delays unlikely due to Streetworks
Install New 29 – Replacement Padestrian Crossing Newport at Newport: Adjacent To The Junction Of Fairmount Drive, Opposite Polars (Ml 210124):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
George Street, Sandown, Isle Of Wight
21 October — 23 October Traffic control (give & take)
Delays unlikely due to Streetworks
Replacement Of N? 2 Signs (2 No Entry) Sandown at Sandown: At The Junction Of Leed Street & George Street (Ml 440341):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Crocker Street, Newport, Isle Of Wight
21 October — 23 October No carriageway incursion
Delays unlikely due to Streetworks
Build 1 Concrete Chamber 725mm X 255mm X 665mm Deep In Footway,Install 1m Of 1 Way Poly Duct In Footway,Provide 1 Core Drill(S) Into Jointbox Or Building at O/S 62, Crocker Street
Responsibility: BT
EToN status: Advanced planning
Edinburgh Road, Freshwater, Isle Of Wight
21 October — 23 October Some carriageway incursion
Delays unlikely due to Streetworks
Install New 4″ Valve at 1 Edinburgh Road , Freshwater, Isle Of Wight.
Responsibility: Southern Water
EToN status: Advanced planning
Fairview Crescent, Lake, Isle Of Wight
21 October — 23 October Some carriageway incursion
Delays unlikely due to Streetworks
– Remedial Reinstatement at 5, Fairview Cres, Sandown
Responsibility: Southern Water
EToN status: Advanced planning
Fir Tree Close, Shanklin, Isle Of Wight
21 October — 29 October Some carriageway incursion
Delays unlikely due to Streetworks
Relay Service From Far Side Footway To Site at Opposite No 21
Responsibility: SGN
EToN status: Advanced planning
Fitzroy Street, Sandown, Isle Of Wight
21 October — 23 October Traffic control (give & take)
Delays unlikely due to Streetworks
Replacement Of N? 10 Signs (1 Give Way, 1 No Entry, 2 No Left Turn, 4 No Right Turn & 2 Turn Left) Sandown at Sandown: From Grove Road, South To Melville Street (Ml 440359 & Ml 440358):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Gregory Close, Nettlestone, Isle Of Wight
21 October — 23 October No carriageway incursion
Delays unlikely due to Streetworks
Perform 1 Excavation/S For Installation Activities at O/S 6, Gregory Close
Responsibility: BT
EToN status: Advanced planning
Holly Tree Close, Ryde, Isle Of Wight
20 October — 26 October Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Ryde at Ryde: Whole Length Of Road (Ml 360552): Holly Tree Close-Ryde
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Marlborough Road, Ventnor, Isle Of Wight
21 October — 27 October Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (Lowes Scaffold) at O/S Rookley Villa
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Palmers Road, Wootton, Isle Of Wight
20 October — 22 October Some carriageway incursion
Delays unlikely due to Streetworks
Wootton Bridge 1 Power Connection Following Street Cabinet Installation: Excavate To Expose Low Voltage Cable For Power Connection Power Engineer To Carry Out Inspection Prior To Jointing. Power Jointing Team To Insert Cable And Execute Jointing Works. Reinstate, Check And Clear Site. at Palmers Road At The Junction Of Lushington Hill, Wootton
Responsibility: BT
EToN status: Advanced planning
Palmerston Road, Shanklin, Isle Of Wight
21 October — 27 October Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (Dee’S Scaffold) at O/S 14/16 North Road/Palmerston Road
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Woodland Close, Seaview, Isle Of Wight
20 October — 23 October Traffic control (give & take)
Delays unlikely due to Streetworks
Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Seaview at Seaview: Whole Length Of Close From Calthorpe Road (Ml 340627): Woodland Close-Seaview
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning