Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org
Pound Lane, Shorwell, Isle Of Wight
21 August — 21 October Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Fibrovia:R/H4, Resurface 30mm Fibrovia Plus Regulating/Patching (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H4) Shorwell at Shorwell: From Junction Of Wolverton Lane To Junction With Park Lane (Ml 640466): Pound Lane-Shorwell
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Wolverton Lane, Shorwell, Isle Of Wight
21 August — 21 October Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H4) Shorwell at Shorwell: From Junction With Pound Lane To Junction Of Doctors Lane (Ml 640509): Wolverton Lane-Shorwell
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Wolverton Lane, Shorwell, Isle Of Wight
21 August — 21 October Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H4) Shorwell at Shorwell: From Junction With Doctors Lane To Junction Of Chine Lane (Ml 640510): Wolverton Lane-Shorwell
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
B3330 St Johns Road, Ryde, Isle Of Wight
21 August — 03 September Some carriageway incursion
Delays possible due to Streetworks
Scaffold (Sds Scaffolding) at O/S 23
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Inglewood Park, Ventnor, Isle Of Wight
21 August — 04 September Traffic control (two-way signals)
Delays possible due to Streetworks
Ventnor – Pcp9 – 312378 – Bduk – Street Cabinet & Power Installation. Excavate To Lay Approx 14.9m Bt Ducts, Lay Concrete Plinth, Stand Cab. Excavate To Expose Low Voltage Cable For Power Connection And Lay Approx 12.1m Duct. Power Engineer To Carry Out Inspection Prior To Jointing. Power Jointing Team To Insert Cable And Execute Jointing Works. Reinstate, Check And Clear Site. at In Verge, Opp Entrance To Inglewood Park, A3055, Undercliffe Drive, St Lawrence, Ventnor, Isle Of Wight, Po38 1uj
Responsibility: BT
EToN status: Advanced planning
A3020 School Road, Godshill, Isle Of Wight
21 August — 01 September Traffic control (give & take)
Delays unlikely due to Streetworks
Relay Service From Carriageway To Site at Os Rushvale
Responsibility: SGN
EToN status: Advanced planning
A3054 Halletts Shute, Yarmouth, Isle Of Wight
21 August — 25 August No carriageway incursion
Delays unlikely due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (915mm X 445mm) In Footway. at Opp Rydal On, Halletts Shute.
Responsibility: BT
EToN status: Advanced planning
High Street, Yarmouth, Isle Of Wight
21 August — 25 August No carriageway incursion
Delays unlikely due to Streetworks
Replace 1 Jointbox Frame And Cover(S) (2315mm X 737mm) In Footway at Opp South Street Jcn, High Street
Responsibility: BT
EToN status: Advanced planning
Gregory Close, Nettlestone, Isle Of Wight
21 August — 24 August No carriageway incursion
Delays unlikely due to Streetworks
Permanent Reinstatement. at Section 58, New Customer Connection. O/S 2, Gregory Close
Responsibility: BT
EToN status: Advanced planning
Hamilton Road, Binstead, Isle Of Wight
21 August — 24 August No carriageway incursion
Delays unlikely due to Streetworks
Permanent Reinstatement. at Sd7cpa16, O/S 49, Hamilton Road
Responsibility: BT
EToN status: Advanced planning
Solent Path, Ryde, Isle Of Wight
21 August — 24 August No carriageway incursion
Delays unlikely due to Streetworks
Permanent Reinstatement. at Sd7awf40, O/S 15, Solent Path
Responsibility: BT
EToN status: Advanced planning