Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
Isle of Wight roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org.
Albert Road / Victoria Road will be closed on one day between 0900hrs and 1600hrs during the period from Friday 26 February 2016 until Tuesday 1 March 2016. The closure is between Station Avenue and Avenue Road and is for carriageway repair works by Island Roads. The one way restriction in Albert Road / Victoria Road will be temporarily suspended from High Street to Avenue Road to allow access. The route for diverted traffic will be: Albert Road, High Street, Pier Street, Battery Slipway, Esplanade and Avenue Slipway. For further details about these works please contact Island roads on 01983 822440.
Trinity Road will be closed on one day between Friday 26 February and Tuesday 1 March 2016, from 9am until 4pm, between the section of Trinity Road leading to Bonchurch Village Road and Madeira Road. The road closure is for carriageway repair works by Island Roads. The route for diverted traffic will be: Southwest bound traffic: Trinity Road, St Boniface Road, Spring Hill and High Street and Northeast bound traffic: High Street, Victoria Street, Albert Street, Pier Street, High Street, Spring Hill, St Boniface Road and Trinity Road. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT ISLAND ROADS ON 01983 822440
Seagrove Manor Road will be closed on one day between Friday 26 February and Tuesday 1 March 2016, from 9am until 4pm between Old Seaview Lane and the end of the highway to the South and East. Vehicular access to premises and businesses will be maintained as far as possible. The road closure is for carriageway repair works by Island Roads.
Brocks Copse Road will be closed on one day between Friday 26 February and Tuesday 1 March 2016, from 9am until 4pm between Palmers Road and Alverstone Road. The road closure is for carriageway repair works by Island Roads. The route for diverted traffic will be: Palmers Road, A3054 High Street and Lushington Hill, FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT ISLAND ROADS ON 01983 822440
Nelson Road will be closed on one day between Friday 26 February and Wednesday 2 March 2016, from 9am until 4pm, between Trafalgar Road and Collingwood Road. The road closure is for carriageway repair works by Island Roads. The route for diverted traffic will be: Northbound: Collingwood Road, West View and Trafalgar Road. Southbound: Trafalgar Road, East View and Collingwood Road. FOR FURTHER DETAILS ABOUT THESE WORKS PLEASE CONTACT ISLAND ROADS ON 01983 822440
Gills Cliff Road, Ventnor will be closed from 090hrs until 1600hrs on Friday 26 February 2016 between Castle Road and junction with Whitwell Road. for carriageway repair works by Island Roads. The route for diverted traffic will be: Castle Road, Zig Zag Road, A3055 Alpine Road, Church Street and High Street, Spring Hill, Mitchell Avenue, Ocean View Road and Gills Cliff Road. For further details about these works please contact Island Roads on 01983 822440.
B3329 Albert Road, Sandown, Isle Of Wight
26 February — 01 March
Delays likely Road closure
Works location: Sandown: On Albert Road Between Its Junction With Albion Road And Victoria Road: Albert Road-Sandown
Works description: Please Remove C/W Lip On Edge Of Previous Patch Approx 1m2 Required. Tm Road Closure (Cw: Pothole) Sandown
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Brocks Copse Road, Wootton, Isle Of Wight
26 February — 29 February
Delays likely Road closure
Works location: Wootton: Approx 75m Above Brocks Lodge And 1 X Pothole O/S 5.: Brocks Copse Road-Wootton
Works description: Sawcut And Infill Saw Cut 6 X Potholes 1000x500x50mm, 1800x500x50mm, 250mm Diam X 50mm 600mm Diam X 55m, 600x200x55mm And 1500x1000x55mm. Tm=Road Closure (Cw: Pothole) Wootton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Gills Cliff Road, Ventnor, Isle Of Wight
26 February — 01 March
Delays likely Road closure
Works location: Ventnor: O/S No.18: Gills Cliff Road-Ventnor
Works description: Sawcut And Infill Idr – P/H’S On Failing Patch Reinstatements 2 X Patches Req’D 1.7 X 1.2 X 50/100mm 1.0 X .50 X 50/100mm Tm – Road Closure (Cw: Pothole) Please Close, Further Works May Be Required If Lines Need Refreshing Ventnor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Nelson Road, Newport, Isle Of Wight
26 February — 01 March
Delays likely Road closure
Works location: Newport: Junction With Trafalgar Road: Nelson Road-Newport
Works description: 28 Day Perm Required Sawcut And Infill X 5 C/W Potholes Approx Size 0.3 X 0.3 X 70mm Deep (Cw: Pothole) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Seagrove Manor Road, Seaview, Isle Of Wight
26 February — 29 February
Delays likely Road closure
Works location: Seaview: At The Jnc With Old Seaview Lane: Seagrove Manor Road-Seaview
Works description: Sawcut And Infill Idr – P/H .60 X .40 X 40mm Patch Req’D To Repair Surrounding Crazing 3.8 X 1.70 X 50/100mm Tm – Road Closure (Cw: Pothole) H4 Urban Please Close, Further Works May Be Required If Lines Need Refreshing Seaview
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Seldon Avenue, Ryde, Isle Of Wight
26 February — 01 March
Delays likely Road closure
Works location: Ryde: O/S No.11: Seldon Avenue-Ryde
Works description: Idr – P/H 1.5 X .30 X 35mm Tm – Give & Take (Cw: Pothole) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3055 High Street, Shanklin, Isle Of Wight
26 February — 03 March
Delays possible Some carriageway incursion
Works location: O/S 85
Works description: Scaffold App. For 85 High Street, Shanklin – 19/2 – 25/2
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3054/B3330 High Street, Ryde, Isle Of Wight
26 February — 01 March
Delays unlikely No carriageway incursion
Works location: From O/S 16 To 17, High Street.
Works description: Install 7m Of 1 Way Poly Duct In Footway,Provide 1 Core Drill(S) Into Jointbox Or Building
Responsibility for works: BT
Current status: Advanced planning
Ashey Road, Ryde, Isle Of Wight
26 February — 01 March
Delays unlikely Traffic control (give & take)
Works location: Ryde: Three Cores Equidistant Between Leighwood Close To Upton Road (Ml320225): Ashey Road-Ryde
Works description: Three Road Core Excavations Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Grange Road, Sandown, Isle Of Wight
26 February — 01 March
Delays unlikely Some carriageway incursion
Works location: O/S 1/4 The Grange, Grange Road.
Works description: Install 9m Of 2 Poly Ducts In Carriageway,Provide 1 Core Drill(S) Into Jointbox Or Building.
Responsibility for works: BT
Current status: Advanced planning
Ryde Road, Seaview, Isle Of Wight
26 February — 01 March
Delays unlikely Some carriageway incursion
Works location: Ryde Rd Seaview Isle Of Wight Iw
Works description: – Frame And Cover Replacement In Carriageway
Responsibility for works: Southern Water
Current status: Advanced planning
Sun Hill, Cowes, Isle Of Wight
26 February — 03 March
Delays unlikely Some carriageway incursion
Works location: No. 10 Sun Hill Cowes
Works description: Scaff. App. 10 Sun Hill, Cowes – 26/02 – 03/03
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning