Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org
A3054 Binstead Road, Ryde, Isle Of Wight
28 October — 30 October Traffic control (two-way signals)
Delays likely due to Streetworks
Idr – Gully Cover Depressed, Rocking And Breaking Out Requires Resetting 1.50 X .80 X 100/150mm Patch Tm – Two Way Temp Lights (Gl: Ironwork Rocking/Corrosion) Ryde at Ryde: O/S Treefields Just Up From The Golf Club Adj To The Traffic Island On The Ryde Bound Side Of The C/Way: Binstead
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
A3054 High Street, Wootton, Isle Of Wight
28 October — 29 October Traffic control (two-way signals)
Delays likely due to Streetworks
Remedial To Rectify Ha Defect In Cw at Opp 156, High Street
Responsibility: BT
EToN status: Advanced planning
A3054 Quarr Hill, Binstead, Isle Of Wight
28 October — 30 October Traffic control (two-way signals)
Delays likely due to Streetworks
Reset Gully Frame And Cover To Level. If Damaged Or Worn, Replace With New. Tm=2 X Way Traffic Lights Close Further Works Required Lines Need Refreshing Binstead at Binstead: O/Side Woodstock: Quarr Hill-Binstead – 788
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Mill Lane, Brighstone, Isle Of Wight
27 October — 27 December Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4 Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4 (Kerbed=Inlay/Unkerbed=Overlay) Brighstone at Brighstone: From New Road 450m East Thereof (Ml 640304): Mill Lane-Brighstone
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
B3331 Fishbourne Lane, Wootton, Isle Of Wight
28 October — 29 October Traffic control (Stop/Go boards)
Delays possible due to Streetworks
To Rectify Ha Defect In Cw at 455520 092328 19 Fishbourne Lane Wootton Po33 4ez
Responsibility: BT
EToN status: Advanced planning
B3401 Shide Road, Newport, Isle Of Wight
27 October — 29 October Traffic control (two-way signals)
Delays possible due to Streetworks
Lvc-095 – Construction Of Bus Shelter Hard Standing And Installation Of New Bus Shelter. Newport at Newport: J/O Queens Road, West Side Of Junction: Shide Road-Newport
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Pallance Road, Northwood, Isle Of Wight
28 October — 28 October Traffic control (two-way signals)
Delays possible due to Streetworks
Access Required To Underground Bt Structure To Restore Service – No Structural Changes. Work Being Carried Out On Existing Bt Plant at Os 108 Pallance Road, Northwood ? Isle Of Wight Po31 8ls
Responsibility: BT
EToN status: Advanced planning
Gunville Road, Carisbrooke, Isle Of Wight
28 October — 30 October Traffic control (two-way signals)
Delays possible due to Streetworks
Idr – Footway Repairs Reinstate 5mx1.8m (9m2) Tm Two Way Lights Req And No Parking Cones Setting Out Opp Nb Please Inform Home Owner Prior To Works As This Is A Vc (Fw: Fw/Cyclep Pothole) Carisbrooke at Carisbrooke: 22: Gunville Road-Carisbrooke
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Havenstreet Main Road, Havenstreet, Isle Of Wight
27 October — 27 October Traffic control (two-way signals)
Delays possible due to Streetworks
Installation Of Gully Shoot Havenstreet at Havenstreet: Outside Property Called Woodlands Ml 320197: Havenstreet Main Road-Havenstreet
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Great Preston Road, Ryde, Isle Of Wight
28 October — 30 October Traffic control (multi-way signals)
Delays possible due to Streetworks
Gully Cover And Small Ironwork Cover Are Set Within A Reinstatement That Has A 40mm Depression Causing Vibration To The Customers Property When Large Vehicles Pass Over It Renew Reinstatement And Make Level With Surrounding Road Surface Saw Cut & Infill 2.0 X 1.0 X 100/150mm Tm – Three Way Temp Lights With Parking Restrictions During Work On Opposite Side Of The C/Way O/S No.’S 103 To 109 Great Preston Rd. (Cw: Pothole) Ryde at Ryde: O/S No 78 Near Entrance To Footpath R55: Great Preston Road-Ryde – 4094
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
A3055 Avenue Road, Freshwater, Isle Of Wight
28 October — 03 November Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (Sds Scaffolding) at O/S The Memorial Hall
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
A3055 Military Road, Chale, Isle Of Wight
28 October — 29 October Some carriageway incursion
Delays unlikely due to Streetworks
Recover Carrier Pole Off Dp44 at Outside Chale Church, Behind Kisok, Military Road, Po38 2hh
Responsibility: BT
EToN status: Advanced planning
A3055 School Green Road, Freshwater, Isle Of Wight
28 October — 30 October No carriageway incursion
Delays unlikely due to Streetworks
Remove A Type Pillar Box at Verge, Opposite Vets, School Green Road, Freshwater, Isle Of Wight
Responsibility: Romec Ltd
EToN status: Advanced planning
B3329 High Street, Sandown, Isle Of Wight
27 October — 28 October Traffic control (give & take)
Delays unlikely due to Streetworks
Trial Hole In Carriageway In Order To Assess The Pavement Condition Before Treatment Sandown at Sandown: (Ml 420095) Junction With Victoria Road, On The Roundabout: High Street-Sandown
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Binstead Lodge Road, Binstead, Isle Of Wight
27 October — 28 October Some carriageway incursion
Delays unlikely due to Streetworks
Renew Dp1309 With A 9m Light Pole. Renew 6 Drop Wires. at Outside 137 Binstead Lodge Road, Po33 3uy
Responsibility: BT
EToN status: Advanced planning
Bedbury Lane, Freshwater, Isle Of Wight
28 October — 28 October Traffic control (give & take)
Delays unlikely due to Streetworks
Installation Of Asphalt Hump At Top Of Driveway Freshwater at Freshwater: Opposite Entrance To Farringford House (Ml 630206): Bedbury Lane-Freshwater
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Main Road, Alverstone, Isle Of Wight
28 October — 29 October Some carriageway incursion
Delays unlikely due to Streetworks
Remedial Work On Ha Defect. at (Pcp6) 457770,85557457764,85565 Opposite Station House Across Carriageway To Outside Station House
Responsibility: BT
EToN status: Advanced planning
Gunville Road, Carisbrooke, Isle Of Wight
28 October — 30 October Some carriageway incursion
Delays unlikely due to Streetworks
– Install New Water Service To New House. at 179 Gunville Road , Newport, Isle Of Wight.
Responsibility: Southern Water
EToN status: Advanced planning
Quay Street, Yarmouth, Isle Of Wight
27 October — 28 October Some carriageway incursion
Delays unlikely due to Streetworks
Remedial Ha Defect at In Cw To Os The Yarmouth Ferry Terminal , Quay Street
Responsibility: BT
EToN status: Advanced planning
Church Path, East Cowes, Isle Of Wight
28 October — 24 December Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (Ace Scaffold) at Path Between Waitrose And Church Path
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Egypt Esplanade, Cowes, Isle Of Wight
27 October — 28 October No carriageway incursion
Delays unlikely due to Streetworks
Remedial Ha Defect at Sd7amh29, Both Blockages F/W O/S 1 To 6 Hawkins, Egypt Esplanade
Responsibility: BT
EToN status: Advanced planning
Home Meade, Newport, Isle Of Wight
28 October — 03 November Some carriageway incursion
Delays unlikely due to Streetworks
Skip (Knight Skips Hire) at Opposite 7
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Leed Street, Sandown, Isle Of Wight
28 October — 10 November Traffic control (give & take)
Delays unlikely due to Streetworks
Replacement Of N? 13 Signs (2 Give Way, 2 No Entry, 3 No Left Turn, 4 One Way Traffic & 2 Turn Left) Sandown at Sandown: From Junction With Broadway, East To Junction With St Johns Road (Ml 440356):
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning
Lowtherville Road, Ventnor, Isle Of Wight
28 October — 30 October No carriageway incursion
Delays unlikely due to Streetworks
Reinstatment To Be Carried Out On Interim Site at Os 5-10 St Margarets Lowtherville Road
Responsibility: BT
EToN status: Advanced planning
Western Road, Shanklin, Isle Of Wight
27 October — 04 November Traffic control (give & take)
Delays unlikely due to Streetworks
Lay New Service From Farside Carriageway To Site at Os 34
Responsibility: SGN
EToN status: Advanced planning