Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

B3325 Nodes Road, Northwood, Isle Of Wight
02 September — 02 October Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1 Resurface 25mm Ul-M 65psv Channel Plane-Urban:H1) (Kerbed=Inlay/Unkerbed=Overlay) Northwood at Northwood: From Venner Avenue To Cranleigh Gardens (Ml 110040): Nodes Road-Northwood
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3325 Nodes Road, Northwood, Isle Of Wight
02 September — 02 October Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1 Resurface 25mm Ul-M 65psv Channel Plane-Urban:H1) (Kerbed=Inlay/Unkerbed=Overlay) Northwood at Northwood: From Cranleigh Gardens To Pallance Road (Ml 110041): Nodes Road-Northwood
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

B3325 Nodes Road, Northwood, Isle Of Wight
02 September — 02 October Road closure
Delays likely due to Streetworks
Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:U/H1 Resurface 25mm Ul-M 65psv Plus Regulating-Urban:H1 (Kerbed=Inlay/Unkerbed=Overlay) Northwood at Northwood: From Newport Road To Venner Avenue (Ml 110039): Nodes Road-Northwood
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3054 High Street, Wootton, Isle Of Wight
03 September — 07 September Some carriageway incursion
Delays possible due to Streetworks
Universal Water Metering Programme at 147-149 High St Wootton Bridge Ryde Isle Of
Responsibility: Southern Water
EToN status: Advanced planning

A3055 Blackgang Road, Niton, Isle Of Wight
02 September — 15 September Traffic control (multi-way signals)
Delays possible due to Streetworks
Build 1 Concrete Chamber 915mm X 445mm X 965mm Deep In Footway,Install 60m Of 1 Way Poly Duct In Verge,Install 8m Of 1 Way Poly Duct In Carriageway at 55m West Of Jnc Blackgang Old Road, Jnc Blackgang Old Road On, Blackgang Road
Responsibility: BT
EToN status: Advanced planning

B3323 Pyle Street, Newport, Isle Of Wight
02 September — 11 September Some carriageway incursion
Delays possible due to Streetworks
– Install New Water Connection In Pyle Street at Smart House, Castlehold Lane, Newport ,Iow.
Responsibility: Southern Water
EToN status: Advanced planning

B3399 Main Road, Brighstone, Isle Of Wight
03 September — 16 September Traffic control (two-way signals)
Delays possible due to Streetworks
Excavate In Carriageway And Footway For New Electric Supply. Backfill And Reinstate. at Between Jct Moor Lane And “Oakwood”
Responsibility: Southern Electric
EToN status: Advanced planning

Blackgang Old Road, Chale, Isle Of Wight
02 September — 15 September Traffic control (multi-way signals)
Delays possible due to Streetworks
Build 1 Concrete Chamber 915mm X 445mm X 965mm Deep In Footway,Install 10m Of 1 Way Poly Duct In Carriageway,Install 5m Of 1 Way Poly Duct In Footway,Install 60m Of 1 Way Poly Duct In Verge. at Jnc Blackgang Road, Jnc Chale Footpath 12, And Opp To O/S Ashore Cafe, Blackgang Old Road
Responsibility: BT
EToN status: Advanced planning

Canteen Road, Newchurch, Isle Of Wight
02 September — 04 September Traffic control (multi-way signals)
Delays possible due to Streetworks
Cleanse Gully/ Free Up From Weeds Newchurch at Newchurch: O/S Property Called The Beeches: Canteen Road-Newchurch – 2256
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

Newnham Road, Binstead, Isle Of Wight
02 September — 04 September Traffic control (two-way signals)
Delays possible due to Streetworks
Minor Excavation To Repair Loose Cover And Frame In Carriageway at Outside 22
Responsibility: Isle of Wight Cable And Telephone Co Ltd
EToN status: Advanced planning

Chale Footpath 12, Chale, Isle Of Wight
02 September — 15 September Traffic control (multi-way signals)
Delays possible due to Streetworks
Build 1 Concrete Chamber 915mm X 445mm X 965mm Deep In Footway,Install 40m Of 1 Way Poly Duct In Verge. at Jnc Blackgang Old Road To 40m South Of Jnc Blackgang Old Road On, Chale Footpath 12
Responsibility: BT
EToN status: Advanced planning

A3054 Union Street, Ryde, Isle Of Wight
02 September — 15 September Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (Sca Group/Acces Scaffold) at O/S Beachcomber On Corner With Castle Street.
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

A3055 Afton Road, Freshwater, Isle Of Wight
02 September — 04 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at Blue Pines & Greensleeves Afton Rd Freshwater Isle Of
Responsibility: Southern Water
EToN status: Advanced planning

B3320 Bridge Road, Cowes, Isle Of Wight
02 September — 04 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at 2 Bridge Rd Cowes Isle Of Wight Iw
Responsibility: Southern Water
EToN status: Advanced planning

B3320 Bridge Road, Cowes, Isle Of Wight
03 September — 10 September Some carriageway incursion
Delays unlikely due to Streetworks
Gsmr/Hse Cut Off 48573 at Os Unit 46 J S White Industrial Estate
Responsibility: SGN
EToN status: Advanced planning

B3323 Bowcombe Road, Carisbrooke, Isle Of Wight
03 September — 07 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at Sheepbells Bowcombe Rd Newport Isle Of
Responsibility: Southern Water
EToN status: Advanced planning

B3325 Terminus Road, Cowes, Isle Of Wight
02 September — 04 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at 4 Terminus Rd Cowes Isle Of Wight Iw
Responsibility: Southern Water
EToN status: Advanced planning

B3340 Church Street, Seaview, Isle Of Wight
03 September — 07 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at Beatrice Cottage (Osv In Church Street) Rope Walk Seaview Isl
Responsibility: Southern Water
EToN status: Advanced planning

B3341 Castle Road, Newport, Isle Of Wight
03 September — 07 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at 66 Castle Rd Newport Isle Of Wight Iw
Responsibility: Southern Water
EToN status: Advanced planning

B3341 Medina Avenue, Newport, Isle Of Wight
03 September — 07 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at 135 Medina Ave Newport Isle Of Wight I
Responsibility: Southern Water
EToN status: Advanced planning

B3395 High Street, Bembridge, Isle Of Wight
02 September — 04 September Traffic control (give & take)
Delays unlikely due to Streetworks
Non Invasive Survey Of Sewer Network By Lifting Manhole Cover Under Give And Take Nil Excavation at 37-39
Responsibility: Southern Water
EToN status: Advanced planning

B3401 Shide Road, Newport, Isle Of Wight
03 September — 07 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at 2-68 Shide Rd Newport Isle Of Wight Iw
Responsibility: Southern Water
EToN status: Advanced planning

Merstone Lane, Godshill, Isle Of Wight
03 September — 07 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at 7 Dovecotes Merstone Lane Merstone Newp
Responsibility: Southern Water
EToN status: Advanced planning

High Street, Yarmouth, Isle Of Wight
02 September — 08 September Traffic control (give & take)
Delays unlikely due to Streetworks
Yarmouth (Pcp8) – Power Connection Following Street Cabinet Installation: 5 Days Notice Required To: Excavate To Expose Low Voltage Cable For Power Connection And Lay Approx 17m Duct. Power Engineer To Carry Out Inspection Prior To Jointing. Power Jointing Team To Insert Cable And Execute Jointing Works. Reinstate, Check And Clear Site. at Opposite 8 To Opposite Mount Lodge Tennyson Road On High Street Street, Yarmouth, Isle Of Wight, Po41 0ps
Responsibility: BT
EToN status: Advanced planning

High Street, Yarmouth, Isle Of Wight
03 September — 07 September No carriageway incursion
Delays unlikely due to Streetworks
Yarmouth Pcp 3 Power Connection Following Street Cabinet Installation: Excavate To Expose Low Voltage Cable For Power Connection And Lay Approx 5m Duct. Power Engineer To Carry Out Inspection Prior To Jointing. Power Jointing Team To Insert Cable And Execute Jointing Works. Reinstate, Check And Clear Site. at S/O Gordon House, High Street, Yarmouth, Isle Of Wight, P041 0qb
Responsibility: BT
EToN status: Advanced planning

Station Road, Wootton, Isle Of Wight
03 September — 07 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at 24 Station Rd Wootton Bridge Ryde Isle
Responsibility: Southern Water
EToN status: Advanced planning

Chapel Street, Newport, Isle Of Wight
03 September — 07 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at 21 Chapel St Newport Isle Of Wight Iw
Responsibility: Southern Water
EToN status: Advanced planning

Cliff Road, Totland, Isle Of Wight
02 September — 04 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at Chine Cliff Cliff Rd Totland Bay Iow Iw
Responsibility: Southern Water
EToN status: Advanced planning

Colwell Common Road, Totland, Isle Of Wight
02 September — 04 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at Moordown – Wyvern Colwell Common Rd Totland Bay
Responsibility: Southern Water
EToN status: Advanced planning

Cross Lane, Newport, Isle Of Wight
02 September — 15 September Traffic control (give & take)
Delays unlikely due to Streetworks
Excavation Of Joint Bay In Footway For New Electrical Connections at O/S Old Public House Princess Royal
Responsibility: Southern Electric
EToN status: Advanced planning

Gordon Road, Cowes, Isle Of Wight
02 September — 04 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at 28 Gordon Rd Cowes Isle Of Wight Iw
Responsibility: Southern Water
EToN status: Advanced planning

Melville Street, Sandown, Isle Of Wight
02 September — 09 September Some carriageway incursion
Delays unlikely due to Streetworks
Scaffold (Ace Scaffold) at O/S 26
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning

New Road, Wootton, Isle Of Wight
03 September — 07 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at Inwood-Seaview Cottage New Rd Wootton Bridge Ryde Isle
Responsibility: Southern Water
EToN status: Advanced planning

New Street, Newport, Isle Of Wight
03 September — 07 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at 35 New St Newport Isle Of Wight Iw
Responsibility: Southern Water
EToN status: Advanced planning

Oakhill Road, Seaview, Isle Of Wight
03 September — 07 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at 1 Oakhill Rd Seaview Isle Of Wight Iw
Responsibility: Southern Water
EToN status: Advanced planning

Ommanney Road, Yarmouth, Isle Of Wight
02 September — 04 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at Tumble-Home Ommanney Rd Yarmouth Isle
Responsibility: Southern Water
EToN status: Advanced planning

Princes Esplanade, Gurnard, Isle Of Wight
02 September — 04 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at 3 Princes Esplanade Cowes Isle Of Wigh
Responsibility: Southern Water
EToN status: Advanced planning

Queens Road, Cowes, Isle Of Wight
02 September — 04 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at 61 Queens Rd Cowes Isle Of Wight Iw
Responsibility: Southern Water
EToN status: Advanced planning

St Marys Road, Cowes, Isle Of Wight
02 September — 04 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at 109 St. Marys Rd Cowes Isle Of Wight I
Responsibility: Southern Water
EToN status: Advanced planning

Stephenson Road, Cowes, Isle Of Wight
02 September — 04 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at 70 Flat 2 Stephenson Rd Cowes Isle Of
Responsibility: Southern Water
EToN status: Advanced planning

The Green, Cowes, Isle Of Wight
02 September — 04 September Some carriageway incursion
Delays unlikely due to Streetworks
Universal Water Metering Programme at 24 The Green Cowes Isle Of Wight Iw
Responsibility: Southern Water
EToN status: Advanced planning

West Hill Road, Ryde, Isle Of Wight
03 September — 10 September Some carriageway incursion
Delays unlikely due to Streetworks
Skip (Weaver Bros) at O/S 81
Responsibility: Island Roads on behalf of the Isle of Wight Council
EToN status: Advanced planning