Isle of Wight roadworks or road closures starting today or tomorrow.
Information provided by Elgin via Roadworks.org. It covers work carried out by BT, utility companies and Island roads.
Public event, Carnival / Parade / Street party
Responsibility for event: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Various Streets – Ventnor Childrens Carnival
Location: at A3055,C45 Dudley Road,Pier Street,High Street,Victoria Street,Albert Street,Church Street,Belgrave Road,Park Avenue, Ventnor, Isle of Wight (Various Streets – Ventnor Childrens Carnival)
10 August — 10 August
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: Planned
Public event, Carnival / Parade / Street party
Ventnor Main Carnival
Responsibility for event: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Various Streets – Ventor Main Carnival
Location: at A3055,C46,C45 Dudley Road,Pier Street,High Street,Spring Hill,Victoria Street,Madeira Road,St Catherine Street,Albert Street,Church Street,Belgrave Road,Park Avenue, Ventnor, Isle of Wight (Various Streets – Ventor Main Carnival)
10 August — 10 August
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: Planned
Public event, Entertainment event
Fireworks Display to end Cowes Week Sailing Regatta. Cowes Parade and Princes Green closed all day. One Way in place on Egypt Esplanade and Prince’s Esplanade all day. Additional road closures and one ways between 21:00 and 23:30 approximately.
Responsibility for event: Island Roads on behalf of the Isle of Wight Council
Temporary one-way
Name: Cowes Week Fireworks Night 2016
Location: at C78 Castle Hill,Queens Road,The Parade, Cowes, Isle of Wight (Cowes Week Fireworks Night 2016)
11 August — 12 August
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: Planned
B3399 Newport Road, Freshwater, Isle Of Wight
10 August — 26 August
Delays likely Road closure
Works location: Freshwater: From Wilmingham Lane 540m East (Ml620105): Newport Road-Freshwater
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H2, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural: H2) Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3399 Newport Road, Freshwater, Isle Of Wight
10 August — 26 August
Delays likely Road closure
Works location: Freshwater: From 540m East Of Wilmingham Lane A Further 500m East (Ml620106): Newport Road-Freshwater
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H2,Resurface 25mm Ul-M 65sv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H2) Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3399 Newport Road, Freshwater, Isle Of Wight
10 August — 26 August
Delays likely Road closure
Works location: Freshwater: From 260m West Of Wilmingham Lane A Further 250m West (Ml620103): Newport Road-Freshwater:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren150:R/H2, Strengthen 25mm Ul-M 65psv And 125mm Hdm50-Rural:H2) Freshw
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3399 Newport Road, Freshwater, Isle Of Wight
10 August — 26 August
Delays likely Road closure
Works location: Freshwater: From Wilmingham Lane 146m West (Ml620104): Newport Road-Freshwater
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H2, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural: H2) Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3399 Newport Road, Freshwater, Isle Of Wight
11 August — 17 August
Delays likely Road closure
Works location: Freshwater: From 540m East Of Wilmingham Lane A Further 500m East (Ml620106): Newport Road-Freshwater
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H2,Resurface 25mm Ul-M 65sv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H2) Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Cross Street, Oakfield, Ryde, Isle Of Wight
11 August — 01 September
Delays likely Road closure
Works location: Ryde: Ml 341231 Between Harding Road And Slade Road: Cross Street-Ryde
Works description: Carriageway Resurfacing Scheme Inclusive Of: Preparatory Works Such As Kerbing, Drainage, Reinstatement Of Access, Quartering, Duct Trenches Etc. Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Newnham Lane, Binstead, Isle Of Wight
10 August — 26 August
Delays likely Road closure
Works location: Binstead: From Newnham Road 300m West (Ml340344): Newnham Lane-Binstead:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Fibrovia:R/H4, Resurface 30mm Fibrovia Plu Regulating/Patching (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H4) Binste
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Newnham Lane, Binstead, Isle Of Wight
10 August — 26 August
Delays likely Road closure
Works location: Binstead: From A Point 590m East Of Firestone Copse Road For A Further 550m East (Ml340345): Newnham Lane-Binstead:; Eri
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Fibrovia:R/H4, Resurface 30mm Fibrovia Plus Regulating/Patching (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H4) Binste
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Newnham Lane, Binstead, Isle Of Wight
10 August — 26 August
Delays likely Road closure
Works location: Binstead: From Firestone Copse 590m East (Ml340346): Newnham Lane-Binstead:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4) Binste
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3056 Newport Road, Lake, Isle Of Wight
11 August — 15 August
Delays possible Traffic control (two-way signals)
Works location: New Aldi Store,Newport Road,Sandown,Iow.
Works description: – Install New Water Connection
Responsibility for works: Southern Water
Current status: Advanced planning
B3395 Sandown Road, Bembridge, Isle Of Wight
10 August — 12 August
Delays possible Traffic control (two-way signals)
Works location: Bembridge: Longlands Shute, Sandown Rd, East Bound Above Longlands Farm: Sandown Road-Bembridge
Works description: Sawcut And Infill Saw Cut Patch Approx 7m Across Width Of C/W X 500mm To Remove Cracking And Ridge. Grounding Out Marks In C/W. Tm=2 X Way Lights (Cw: Pothole) Bembridge
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3399 Town Lane, Chale, Isle Of Wight
10 August — 12 August
Delays possible Traffic control (two-way signals)
Works location: Chale: O/S Marricourt.: Town Lane-Chale – 11105
Works description: Please Excavate/ Investigate And Carry Out Repairs To Suspected Collapsed System Pipe (Gl: Non Functioning Gully) Chale
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Pallance Road, Northwood, Isle Of Wight
10 August — 18 August
Delays possible Traffic control (two-way signals)
Works location: Outside No 46a
Works description: Lay New Service From Nearside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning
B3321 Clarence Road, East Cowes, Isle Of Wight
11 August — 17 August
Delays unlikely Some carriageway incursion
Works location: O/S Clarence Boat Yard
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Elm Lane, Calbourne, Isle Of Wight
11 August — 12 August
Delays unlikely Some carriageway incursion
Works location: 442497 087060 In Verge Opposite 7, Elm Lane
Works description: Replace 1 Existing Pole
Responsibility for works: BT
Current status: Advanced planning
Green Street, Ryde, Isle Of Wight
11 August — 15 August
Delays unlikely No carriageway incursion
Works location: 459018 092222 Greenmount Primary School Green Street
Works description: Replace 1 Existing Pole 0.5m X 0.5m
Responsibility for works: BT
Current status: Advanced planning
Madeira Lane, Freshwater, Isle Of Wight
11 August — 19 August
Delays unlikely Some carriageway incursion
Works location: Outside Charmdale
Works description: Lay New Service From Nearside Footway To Site
Responsibility for works: SGN
Current status: Advanced planning
Martine Close, Freshwater, Isle Of Wight
11 August — 18 August
Delays unlikely Traffic control (give & take)
Works location: Freshwater: From Junction With Colwell Road, 141m, Ml 640581: Martine Close-Freshwater
Works description: Footway Re-Construction And Surfacing (Fwr : Con 33% Bayrepl) Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
School Lane, Newport, Isle Of Wight
10 August — 18 August
Delays unlikely Some carriageway incursion
Works location: Os Plots 1 -3 & Plots 20 – 22
Works description: Lay New Services From Nearside Carriageway To Sites
Responsibility for works: SGN
Current status: Advanced planning
Wellington Road, Newport, Isle Of Wight
10 August — 23 August
Delays unlikely Some carriageway incursion
Works location: O/S 84 – O/S Trinity Middle School
Works description: Excavation Of Electrical Joint Hole In Footway For New Electrical Service To Christ The Kings College Backfill And Reinstate
Responsibility for works: Southern Electric
Current status: Advanced planning