Bath Road roadworks signage

Isle of Wight roadworks and road closures 11th November 2016

Isle of Wight roadworks or road closures starting today or tomorrow.

Information provided by Elgin via Roadworks.org. It covers work carried out by BT, utility companies and Island roads.

Public event, Remembrance parade
Remembrance Service at Lind Street Memorial for Armistice Day
Responsibility for event: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Ryde Armistice Day Service
Location: at St James Street, Ryde, Isle of Wight (Ryde Armistice Day Service)
11 November — 11 November
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: Planned
Traffic interruptions

Streetworks / Licence, Streetworks
Carriageway reconstruction, planing and resurfacing to include any prepworks
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Blackwater Hollow
Location: at A3020 Blackwater Hollow, Newport, Isle of Wight (Blackwater Hollow)
11 November — 25 November
Diversion route
Name: Diversion
Location: at A3020 Blackwater Hollow, Newport, Isle of Wight (Diversion)
11 November — 25 November
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: In progress

Streetworks / Licence, Streetworks
Carriageway repair works
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Princelett Shute
Location: at C20 Princelett Shute, Newchurch, Isle of Wight (Princelett Shute)
11 November — 15 November
Diversion route
Name: Diversion
Location: at C20 Princelett Shute, Newchurch, Isle of Wight (Diversion)
11 November — 15 November
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: In progress

Streetworks / Licence, Streetworks
Carriageway repair works
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Oakhill Road
Location: at Oakhill Road, Seaview, Isle of Wight (Oakhill Road)
11 November — 12 November
Diversion route
Name: Diversion
Location: at Oakhill Road, Seaview, Isle of Wight (Diversion)
11 November — 12 November
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: In progress

Streetworks / Licence, Streetworks
Carriageway repair works
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Harbors Lake Lane
Location: at C19 Harbors Lake Lane, Newchurch, Isle of Wight (Harbors Lake Lane)
11 November — 15 November
Diversion route
Name: Diversion
Location: at C19 Harbors Lake Lane, Newchurch, Isle of Wight (Diversion)
11 November — 15 November
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: In progress

B3330/B3340 Nettlestone Hill, Seaview, Isle Of Wight
11 November — 30 December
Delays likely Road closure
Works location: Seaview: From Nettlestone Hill 60m East To Seaview Road (Ml330083b): Nettlestone Hill-Seaview
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Seaview
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3340 Seaview Lane, Nettlestone, Isle Of Wight
11 November — 30 December
Delays likely Road closure
Works location: Nettlestone: From Nettlestone Green 109m North To Seaview Road (Ml330083a): Seaview Lane-Nettlestone
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Nettlestone
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3340 Seaview Lane, Nettlestone, Isle Of Wight
11 November — 30 December
Delays likely Road closure
Works location: Nettlestone: From Nettlestone Green To Holgate Lane (Ml330102): Seaview Lane-Nettlestone:; Cw Cip Scheme Cw Cip Scheme
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Nettle
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3340 Seaview Lane, Nettlestone, Isle Of Wight
11 November — 30 December
Delays likely Road closure
Works location: Nettlestone: From Seaview Lane To Holgate Lane (Ml330103): Seaview Lane-Nettlestone:; Cw Cip Scheme Cw Cip Scheme
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Recon160:U/H3, Reconstruction 25mm Ul-M 65psv And 135mm Foambase-Urban:H3) Nettle
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Blackwater Hollow, Newport, Isle Of Wight
11 November — 25 November
Delays likely Road closure
Works location: Newport: From 470m South Of Blackwater Road A Further 500m South (Ml410014): Blackwater Hollow-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing To Include Any Prepworks . (Ff-Ul-M:R/H1, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H1) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Blackwater Hollow, Newport, Isle Of Wight
11 November — 25 November
Delays likely Road closure
Works location: Newport: From 970m South Of Blacfkwater Road A Further 630m South (Ml410013): Blackwater Hollow-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing To Include Any Prepworks. (Ff-Ul-M:R/H1, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H1) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Blackwater Hollow, Newport, Isle Of Wight
11 November — 25 November
Delays likely Road closure
Works location: Newport: From Blackwater Road 465m South (Ml410015): Blackwater Hollow-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1, Resurface 25mm Ul-M 65psv Channel Plane-Urban:H1) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Blackwater Hollow, Newport, Isle Of Wight
11 November — 02 December
Delays likely Road closure
Works location: Newport: From Highwood Lane 570m North (Ml410012): Blackwater Hollow-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Sul-M:R/H1, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H1) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Carisbrooke Road, Newport, Isle Of Wight
11 November — 15 November
Delays likely Traffic control (multi-way signals)
Works location: Newport: O/S Lloyds Chemist.: Carisbrooke Road-Newport
Works description: C/W Defect X 1 Rocking Sww Cover And The Surround Is Breaking Up. Cip To Carry Out Remedial Works To Reset The Cover And Defective Surround. Tm- Cip Suggest Possible 3 Way Ttl. Main Lights To Be Switched Of. (Cw: Irnwk Not Exceed +Or- 20mm) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Harbors Lake Lane, Newchurch, Isle Of Wight
11 November — 15 November
Delays likely Road closure
Works location: Newchurch: Opposite Ager Farm: Harbors Lake Lane-Newchurch
Works description: Idr – Edge Of C/Way Erosion 12m X .50 X 50mm – Please Repair Using A Bitmac Edge With Type 1 On The Outside Of It To Infill The Eroded Verge And 1 P/H .60 X .40 X 40mm Tm – Ds Advices Possible Road Closure (Cw: Pothole) Newchurch
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Oakhill Road, Seaview, Isle Of Wight
11 November — 12 November
Delays likely Road closure
Works location: Seaview: Outside Dovergate, Oakhill Road, Seaview, Ml 340384: Oakhill Road-Seaview
Works description: Raise And Reset Manhole Cover Seaview
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Princelett Shute, Newchurch, Isle Of Wight
11 November — 15 November
Delays likely Road closure
Works location: Newchurch: O/S Princelett Farm On The Branstone Cross Bound Side Of The C/Way: Princelett Shute-Newchurch
Works description: Idr – 2 X Gully Covers Have Sunk And Require Replacing And Resetting To Level 600 X 450 X 2 Tm – Two Way Temp Lights (Cw: Irnwk Not Exceed +Or- 20mm) Newchurch
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Green Street, Ryde, Isle Of Wight
11 November — 24 November
Delays possible Some carriageway incursion
Works location: Adj 1
Works description: Excavation In Footway For New Electric Supply Backfill And Reinstate
Responsibility for works: Southern Electric
Current status: Advanced planning

Beachfield Road, Sandown, Isle Of Wight
11 November — 21 November
Delays unlikely Some carriageway incursion
Works location: Os 17
Works description: Lay New Service From Nearside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning

High Street, Bembridge, Isle Of Wight
11 November — 21 November
Delays unlikely Some carriageway incursion
Works location: Os Flat 19
Works description: Lay New Service From Nearside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning

Lane End Road, Bembridge, Isle Of Wight
11 November — 15 November
Delays unlikely Some carriageway incursion
Works location: Outside Kingsmere House – On Lane End Road, Bembridge, Po35 3tb
Works description: Replace Manhole Frame And Cover In The Footway
Responsibility for works: Southern Water
Current status: Advanced planning

Parkhurst Road, Newport, Isle Of Wight
11 November — 15 November
Delays unlikely No carriageway incursion
Works location: Cabin Is Located On The Pathway To The Left Hand Side Of The Prison Entrance
Works description: Working Within The Telecoms Cabin To Complete A Survey
Responsibility for works: T-Mobile (UK)Limited
Current status: Advanced planning

Pine Tree Close, Cowes, Isle Of Wight
11 November — 24 November
Delays unlikely Traffic control (give & take)
Works location: Cowes: Whole Length Of Road From Junction With Baring Road, 205m, Ml 141132: Pine Tree Close-Cowes
Works description: Footway Reconstruction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning