Road closed

Isle of Wight roadworks and road closures 13th April 2016

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

It covers work carried out by BT, utility companies and Island roads.

Isle of Wight roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

A3020 Shanklin Road, Godshill, Isle Of Wight
14 April — 14 June
Delays likely Road closure
Works location: Godshill: Ml 510007 From Property Name ‘Roylands’ To A Point 241 Meters West, At The Entrance Of Sandford Farm.: Shankli
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H1 Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Rural:H1) (Kerbed=Inlay/Unkerbed=Overlay) Godshill
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Shanklin Road, Godshill, Isle Of Wight
14 April — 14 June
Delays likely Road closure
Works location: Godshill: Ml 510008 From Approx 25 Metres West Of The Junction Of Godshill Park Road, To Approx 175 Metres East Of The J
Works description: Carriageway Resurfacing Scheme Inclusive Of: Preparatory Works Such As Kerbing, Drainage, Reinstatement Of Access, Quartering, Duct Trenches Etc. Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining Godshill
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 Fairlee Link Road, Newport, Isle Of Wight
13 April — 15 April
Delays likely Lane closure
Works location: Newport: From Medina Way To Fairlee Road (Ml210047): Fairlee Link Road-Newport:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H1, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Urban:H1) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 Fairlee Road, Newport, Isle Of Wight
13 April — 15 April
Delays likely Lane closure
Works location: Newport: From Fairlee Link Road 410m North (Ml210048): Fairlee Road-Newport:; Cw Cip Scheme Cw Cip Scheme
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H1, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Rural:H1) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Leeson Road, Ventnor, Isle Of Wight
14 April — 14 June
Delays likely Road closure
Works location: Ventnor: Ml 520064 From The Junction Of Bonchurch Shute To A Point 395 Metres Thereof, To Approx O/S No. 59: Leeson Road
Works description: Carriageway Resurfacing Scheme Inclusive Of: Preparatory Works Such As Kerbing, Drainage, Reinstatement Of Access, Quartering, Duct Trenches Etc. Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining Ventnor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Morton Road, Brading, Isle Of Wight
13 April — 14 April
Delays likely Traffic control (multi-way signals)
Works location: Jnc Morton Rd/New Rd/Sandown Rd
Works description: Replace 1 Existing Pole
Responsibility for works: BT
Current status: Advanced planning

B3323 Carisbrooke Road, Newport, Isle Of Wight
13 April — 15 April
Delays likely Traffic control (two-way signals)
Works location: Newport: O/S No.128: Carisbrooke Road-Newport
Works description: Sawcut And Infill Idr – P/H’S X 2 .60 X .15 X 20mm Nearside .5 X 2 X 50mm .40 X .30 X 35mm P/H In Disintegrating Patch Patch Req’D 1.0 X 1.0 X 50/100mm Tm – Two Way Temp Lights (Cw: Pothole) Dyl’S Will Need Repainting On Completion Of Repair To P/H Please Close Down Further Works Required For Lining To Be Refreshed Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3325 Carvel Lane, Cowes, Isle Of Wight
14 April — 14 June
Delays likely Road closure
Works location: Cowes: From Terminus Road To High Street (Ml 110052): Carvel Lane-Cowes
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H1 Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Urban:H1(Kerbed=Inlay/Unkerbed=Overlay) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

High Street, Newchurch, Isle Of Wight
14 April — 14 June
Delays likely Road closure
Works location: Newchurch: From Plamers Lane To The Shute (Ml 430124): High Street-Newchurch
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Newchurch
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Car Park High Street Opp The Griffin, Godshill, Isle Of Wight
13 April — 13 June
Delays likely Road closure
Works location: Godshill: The Entire Car Park (Ml Cp074):
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Cp-Stren:R/H4 Car Park Strengthening Overlay – 60mm Foambase, 25mm Ac10 Surface) (Kerbed=Inlay/Unkerbed=Overlay) Godshill
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Church Road, Binstead, Isle Of Wight
13 April — 13 June
Delays likely Road closure
Works location: Binstead: From Binstead Hill To Quarr Road (Ml340502) : Church Road-Binstead:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Br-Stren:R/H4, Barell Cambered Roads – F1 – 100mm Channel Strengthen, Shaping And 30mm Fibrovia Surfac Course Overlay) Binste
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Little London, Newport, Isle Of Wight
14 April — 14 June
Delays likely Road closure
Works location: Newport: From 290m North Of Sea Street To Hurstake Road (Ml 240283): Little London-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1 Strengthen 30mm Fibrovia And 70mm Foambase-Rban:H4) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Blackwater Hollow, Newport, Isle Of Wight
13 April — 15 April
Delays possible Traffic control (two-way signals)
Works location: Newport: Appx 30m Past The Nat Speed Limit Sign On The Rookley Bound Side Of The C/Way: Blackwater Hollow-Newport
Works description: Idr – Edge Of C/Way Wheel Push With Several Areas Of Delam Patch Req’D 17m X .50 X 50/100mm Tm – Two Way Temp Lights (Cw: Pothole) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3327 Clarence Road, Wroxall, Isle Of Wight
13 April — 15 April
Delays possible Traffic control (two-way signals)
Works location: Wroxall: From O/S Homelands Towards Wroxall Finishing At The Red Anti Skid By The Jnc To Mountfield Road: Clarence Road-
Works description: Idr – 18 X P/H’S Various Sizes – On Both Sides Of The C/Way Unable To Photograph Due To Nat Speed Limit Road Tm – Stop And Fill Mobile Works Using Stop & Go Boards (Cw: Pothole) Wroxall
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3395 High Street, Bembridge, Isle Of Wight
13 April — 13 April
Delays possible Traffic control (Stop/Go boards)
Works location: Bembridge: Ml 340154 From Mill Road Through To Woodlands Grove: High Street-Bembridge
Works description: Road Core Excavations Bembridge
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3395 Kings Road, Bembridge, Isle Of Wight
13 April — 13 April
Delays possible Traffic control (Stop/Go boards)
Works location: Bembridge: Ml 320125 From Church Road To Pump Lane: Kings Road-Bembridge
Works description: Road Core Excavations Bembridge
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3399/B3401 Freshwater Road, Shalfleet, Isle Of Wight
13 April — 15 April
Delays possible Traffic control (two-way signals)
Works location: 466m East Of Junc Of Dodpits Lane On, Freshwater Road
Works description: Replace 1 Jointbox Frame And Cover(S) (1220mm X 680mm) In Carriageway
Responsibility for works: BT
Current status: Advanced planning

Hillway Road, Bembridge, Isle Of Wight
13 April — 13 April
Delays possible Traffic control (Stop/Go boards)
Works location: Bembridge: Ml 341325 From Commonwood Lane Through To Sandown Road: Hillway Road-Bembridge
Works description: Road Core Excavations Bembridge
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Briddlesford Road, Newport, Isle Of Wight
13 April — 15 April
Delays possible Traffic control (multi-way signals)
Works location: Newport: On The Mini Roundabout Briddlesford Road Side And Park Road Side: Briddlesford Road-Newport
Works description: Sawcut And Infill Idr – P/H’S X 8 4 X P/H ‘S On Park Road Side Patch Req’D To Incorporate All P/H’S Appx 3.0 X 1.5 X 50/100mm 4 X P/H’S On The Briddlesford Road Side 1.0 X 1.0 X 40mm .90 X .70 X 40mm .65 X .55 X 40mm .90 X .80 X 35mm Four Way Temp Lights (Cw: Pothole) H1 Rural Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Ashey Road, Ryde, Isle Of Wight
13 April — 13 April
Delays possible Traffic control (Stop/Go boards)
Works location: Ryde: Three Cores Equidistant Between Leighwood Close To Upton Road (Ml320225): Ashey Road-Ryde
Works description: Three Road Core Excavations Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Bannock Road, Whitwell, Isle Of Wight
13 April — 15 April
Delays unlikely No carriageway incursion
Works location: O/S No.17, Bannock Road
Works description: Perform 1 Excavation/S For Installation Activities1
Responsibility for works: BT
Current status: Advanced planning

Heathfield Road, Freshwater, Isle Of Wight
13 April — 18 April
Delays unlikely Traffic control (give & take)
Works location: Freshwater: From Junction With Heathfields Close To The Shielings, 230m, Ml 630213: Heathfield Road-Freshwater
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Atherley Road, Shanklin, Isle Of Wight
13 April — 15 April
Delays unlikely Some carriageway incursion
Works location: 24 Atherley Road, Shanklin, Isle Of Wight.
Works description: – Install New Water Connections.
Responsibility for works: Southern Water
Current status: Advanced planning

Church Path, East Cowes, Isle Of Wight
14 April — 18 April
Delays unlikely No carriageway incursion
Works location: Private Street. Opp No 36, Church Path
Works description: Provide 3 Core Drill(S) Into Jointbox Or Building
Responsibility for works: BT
Current status: Advanced planning

Church Path, East Cowes, Isle Of Wight
14 April — 18 April
Delays unlikely No carriageway incursion
Works location: Opp 23 On, Church Path.
Works description: Install 1m Of 1 Way Poly Duct In Footway,Provide 1 Core Drill(S) Into Jointbox Or Building.
Responsibility for works: BT
Current status: Advanced planning

Kinchington Road, Carisbrooke, Isle Of Wight
13 April — 14 April
Delays unlikely Traffic control (give & take)
Works location: Carisbrooke: From Wellington Road To Purdy Road (Ml 240162): Kinchington Road-Carisbrooke
Works description: Footway Reconstruction And Surfacing (Fwl: Bit Partrecon Fwr: Bit Fullrecon) Carisbrooke
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Osborne Road, East Cowes, Isle Of Wight
14 April — 15 April
Delays unlikely Traffic control (give & take)
Works location: East Cowes: Whole Length Of Road From Clarence Road To Osborne Road, Ml 140224a: Osborne Road-East Cowes
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Fullrecon Fwr : Bit Partrecon) East Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Steephill Court Road, Ventnor, Isle Of Wight
13 April — 21 April
Delays unlikely Some carriageway incursion
Works location: Os 10
Works description: Lay New Service From Nearside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning

Sun Hill, Cowes, Isle Of Wight
14 April — 18 April
Delays unlikely Traffic control (give & take)
Works location: Cowes: At The Junction Of Union Road & Sun Hill (Ml 140144):
Works description: Replacement Of N� 1 Sign (1 X Two Way Traffic) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Sylvan Avenue, East Cowes, Isle Of Wight
14 April — 19 April
Delays unlikely Traffic control (give & take)
Works location: East Cowes: From Old Road To John Nash Avenue (Ml140286): Sylvan Avenue-East Cowes:; Fw Cip Scheme Fw Cip Scheme
Works description: Footway Re Construction And Surfacing(Fwl-Bit Full Recon Fwr-Bit Full Recon) East C
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Union Street, Newport, Isle Of Wight
13 April — 19 April
Delays unlikely Some carriageway incursion
Works location: O/S 5
Works description: Scaff. App. 5 Union Street, Newport – 13/04 – 19/04
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Image: oatsy under CC BY 2.0