Isle of Wight roadworks or road closures starting today or tomorrow.
Information provided by Elgin via Roadworks.org. It covers work carried out by BT, utility companies and Island roads.
Streetworks / Licence, Streetworks
New utility connection works
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Coastguard Lane
Location: at Coastguard Lane, Brighstone, Isle of Wight (Coastguard Lane)
14 November — 16 November
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: In progress
Streetworks / Licence, Streetworks
Carriageway reconstruction, planing and resurfacing
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Hillis Gate Road
Location: at C06/C02 Hillis Gate Road, Northwood, Isle of Wight (Hillis Gate Road)
14 November — 02 December
Diversion route
Name: Diversion
Location: at C06/C02 Hillis Gate Road, Northwood, Isle of Wight (Diversion)
14 November — 02 December
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: In progress
Streetworks / Licence, Streetworks
REPLACE MANHOLE FRAME AND COVER IN THE CARRIAGEWAY
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Diversion route
Name: Diversion
Location: at A3055 Church Road, Shanklin, Isle of Wight (Diversion)
15 November — 17 November
Road closure
Name: Church Road
Location: at A3055 Church Road, Shanklin, Isle of Wight (Church Road)
15 November — 17 November
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: Planned
Streetworks / Licence, Streetworks
Carriageway resurfacing scheme
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Harding Road
Location: at C64 Harding Road, Ryde, Isle of Wight (Harding Road)
14 November — 30 December
Diversion route
Name: Diversion
Location: at C64 Harding Road, Ryde, Isle of Wight (Diversion)
14 November — 30 December
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: In progress
Streetworks / Licence, Streetworks
Tree Cutting works
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Bedbury Lane
Location: at C07 Bedbury Lane, Freshwater, Isle of Wight (Bedbury Lane)
14 November — 25 November
Diversion route
Name: Bedbury Lane
Location: at C07 Bedbury Lane, Freshwater, Isle of Wight (Bedbury Lane)
14 November — 25 November
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: Planned
Harding Road, Ryde, Isle Of Wight
14 November — 30 December
Delays likely Road closure
Works location: Ryde: Ml 340547 Between Great Preston Road And Cross Street: Harding Road-Ryde
Works description: Carriageway Resurfacing Scheme Inclusive Of: Preparatory Works Such As Kerbing, Drainage, Reinstatement Of Access, Quartering, Duct Trenches Etc. Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Castle Lane, Carisbrooke, Isle Of Wight
14 November — 18 November
Delays likely Road closure
Works location: Carisbrooke: Ml 240247 From The Junction Of Millers Lane To Castle Hill: Castle Lane-Carisbrooke
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:/U/H4 F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) (Kerbed=Inlay/Unkerbed=Overlay) Carisbrooke
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Church Road, Shanklin, Isle Of Wight
15 November — 17 November
Delays likely Road closure
Works location: Outside 11 Church Road, Shanklin, Po37 6nu
Works description: Replace Manhole Frame And Cover In The Carriageway
Responsibility for works: Southern Water
Current status: Advanced planning
Coastguard Lane, Brighstone, Isle Of Wight
14 November — 16 November
Delays likely Road closure
Works location: Throstles Nest, Coastguard Lane, Brook, Iow.
Works description: – Install New Water Connection
Responsibility for works: Southern Water
Current status: Advanced planning
Hillis Gate Road, Northwood, Isle Of Wight
14 November — 02 December
Delays likely Road closure
Works location: Northwood: From Rolls Hill Road 540m South (Ml140060): Hillis Gate Road-Northwood:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Fibrovia:R/H4, Resurface 30mm Fibrovia Plus Regulating/Patching(Kerbed=Inlay/Unkerbed=Overlay)-Rural:H4) To Include Any Prep Works Required Prior To Resurfacing Northw
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Hillis Gate Road, Northwood, Isle Of Wight
14 November — 02 December
Delays likely Road closure
Works location: Northwood: From Marks Corner 540m North (Ml140059): Hillis Gate Road-Northwood:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Fibrovia:R/H4, Resurface 30mm Fibrovia Plus Regulating/Patching(Kerbed=Inlay/Unkerbed=Overlay)-Rural:H4) Northw
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Bullen Road, Nettlestone, Isle Of Wight
14 November — 22 November
Delays possible Traffic control (two-way signals)
Works location: Os The Yard
Works description: Lay New Main And 7 New Services From Farside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning
Green Street, Ryde, Isle Of Wight
14 November — 16 November
Delays possible Some carriageway incursion
Works location: 459020-092218 Os Old Greenmount Primary School Green Lane
Works description: Replace 1 Existing Pole 0.5m X 0.5m
Responsibility for works: BT
Current status: Advanced planning
High Street, Newport, Isle Of Wight
15 November — 12 December
Delays possible Some carriageway incursion
Works location: O/S Hose Rhodes Dickson,138 High Street, Newport
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Newnham Road, Binstead, Isle Of Wight
14 November — 25 November
Delays possible Traffic control (two-way signals)
Works location: Binstead: From Newnham Lane To Verwood Drive, Ml 330203: Newnham Road-Binstead
Works description: Surfacing Prep Works – Removing Channel Blocks And Strengthening The Haunch On Both Sides Of The Carriageway Binstead
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Niton Road, Rookley, Isle Of Wight
14 November — 16 November
Delays possible Traffic control (two-way signals)
Works location: Rookley: Niton Road Rookley On The Rookley Bound Side Of The C/Way Before Bridleway Gl15: Niton Road-Rookley
Works description: Gully (40002) Has Sunk And Requires Resetting To Level 600mm X 600mm Tm – Two Way Temp Lights (Cw: Irnwk Not Exceed +Or- 20mm) Rookley
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
St James Street, Newport, Isle Of Wight
14 November — 27 November
Delays possible Some carriageway incursion
Works location: Wight Mountain Cycle Shop, St James St Newport
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
St James Street, Newport, Isle Of Wight
14 November — 14 November
Delays possible Some carriageway incursion
Works location: St James Street, Newport
Works description: Crane Licence – St James Street, Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Atherley Park Way, Shanklin, Isle Of Wight
14 November — 22 November
Delays unlikely Some carriageway incursion
Works location: Land Opp 1
Works description: Lay New Main And 12 Services From Nearside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning
Baring Road, Cowes, Isle Of Wight
15 November — 28 November
Delays unlikely Some carriageway incursion
Works location: The Studio Trinity, Church Lane, Cowes , Iow.
Works description: Install New Water Service Connection,
Responsibility for works: Southern Water
Current status: Advanced planning
Broadway Crescent, Binstead, Isle Of Wight
14 November — 06 February 2017
Delays unlikely Traffic control (give & take)
Works location: From 109 To 67 Broardway Crescent
Works description: Lay 250m Of 125mm Pe In 6″ Ci To Remove 6″ From Risk And Relay 25 Services
Responsibility for works: SGN
Current status: Advanced planning
Bullen Road, Nettlestone, Isle Of Wight
15 November — 17 November
Delays unlikely Some carriageway incursion
Works location: The Yard,Bullen Road,Ryde
Works description: Water Main Connection To New Site. Work Is Within Sgn Site
Responsibility for works: Southern Water
Current status: Advanced planning
Daniel Street, Ryde, Isle Of Wight
14 November — 20 November
Delays unlikely Some carriageway incursion
Works location: O/S 5 Daniel Street, Ryde
Works description: Skip
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Fishbourne Lane, Wootton, Isle Of Wight
14 November — 02 December
Delays unlikely Some carriageway incursion
Works location: Os 77-79 (Between Junc Ranalagh Drive And Ferry Terminal)
Works description: Excavation In Footway For New Electric Supply
Responsibility for works: Southern Electric
Current status: Advanced planning
High Street, Ventnor, Isle Of Wight
14 November — 20 November
Delays unlikely Some carriageway incursion
Works location: O/S 40 High Street, Ventnor
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
High Street, Yarmouth, Isle Of Wight
15 November — 23 November
Delays unlikely Some carriageway incursion
Works location: Os Florins
Works description: Disconnect Service From Farside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning
Pier Road, Seaview, Isle Of Wight
15 November — 28 November
Delays unlikely Some carriageway incursion
Works location: O/S Sancove Opposite Lampost
Works description: Skip
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Pine Tree Close, Cowes, Isle Of Wight
14 November — 24 November
Delays unlikely Traffic control (give & take)
Works location: Cowes: Spur At Top Right Of Close, 88m, Ml 162132: Pine Tree Close-Cowes
Works description: Footway Reconstruction And Surfacing (Fwl : Bit Partrecon Fwr : Bit 50% Partrecon) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Quarry Road, Ryde, Isle Of Wight
14 November — 20 November
Delays unlikely Some carriageway incursion
Works location: O/S 37 Quarry Road, Ryde
Works description: Skip
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Seafield Road, Seaview, Isle Of Wight
14 November — 20 November
Delays unlikely Some carriageway incursion
Works location: O/S 6 Seafield Terrace, Seafield Road, Seaview
Works description: Skip
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Shorwell Bridleway 24, Shorwell, Isle Of Wight
15 November — 17 November
Delays unlikely No carriageway incursion
Works location: 330m West From Junc Of Atherfield Road , Shorwell Bridleway 24
Works description: Install 3m Of 1 Way Poly Duct In Footway
Responsibility for works: BT
Current status: Advanced planning
St Thomas Street, Ryde, Isle Of Wight
14 November — 18 November
Delays unlikely Traffic control (give & take)
Works location: Ryde: St. Thomas Street, Ryde O/S No.14. ( Next To The Junction With Buckingham Road).: St Thomas Street-Ryde
Works description: Relay 6.5sqm Of “Victorian” Brick Pavers On A Vehicle Crossing
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Tennyson Road, Freshwater, Isle Of Wight
14 November — 25 November
Delays unlikely Traffic control (give & take)
Works location: Freshwater: From Junction With Avenue Road To Junction With High Street, 308m, Ml 620051: Tennyson Road-Freshw
Works description: Footway Reconstruction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
The Avenue, Gurnard, Isle Of Wight
14 November — 25 November
Delays unlikely Traffic control (give & take)
Works location: Gurnard: From Worsley Road To Tilbury Road (Ml 140109): The Avenue-Gurnard
Works description: Footway Reconstruction And Surfacing (Fwl: Bit Partrecon Fwr: Bit Partrecon) Gurnard
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning