Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
It covers work carried out by BT, utility companies and Island roads.
Isle of Wight roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org
A3055 Leeson Road, Ventnor, Isle Of Wight
20 May — 14 June
Delays likely Road closure
Works location: Ventnor: Ml 520064 From The Junction Of Bonchurch Shute To A Point 395 Metres Thereof, To Approx O/S No. 59: Leeson Road
Works description: Carriageway Resurfacing Scheme Inclusive Of: Preparatory Works Such As Kerbing, Drainage, Reinstatement Of Access, Quartering, Duct Trenches Etc. Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining Ventnor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3055 Leeson Road, Ventnor, Isle Of Wight
20 May — 17 June
Delays likely Road closure
Works location: Ventnor: Ml 520063 From Approx O/S No. 59 To To A Point 274 Meters West To Approx Opp. No. 23: Leeson Road-Ventnor
Works description: Carriageway Resurfacing Scheme Inclusive Of: Preparatory Works Such As Kerbing, Drainage, Reinstatement Of Access, Quartering, Duct Trenches Etc. Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining Ventnor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3323 East Street, Newport, Isle Of Wight
19 May — 25 May
Delays likely Road closure
Works location: Newport: Ml 210080 From The Junctions Of Church Litten To Coppins Bridge: East Street-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H1 Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Urban:H1) (Kerbed=Inlay/Unkerbed=Overlay) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Car Park Carisbrooke High Street, Carisbrooke, Isle Of Wight
20 May — 11 June
Delays likely Road closure
Works location: Carisbrooke: Cp013 Carisbrooke Car Park:
Works description: Carriageway Resurfacing Scheme Inclusive Of: Preparatory Works Such As Kerbing, Drainage, Reinstatement Of Access, Quartering, Duct Trenches Etc. Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining Carisbrooke
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Castle Street, Carisbrooke, Isle Of Wight
20 May — 24 May
Delays likely Road closure
Works location: Carisbrooke: O/S Carisbrooke Mill And No.’S 31,33 And 35: Castle Street-Carisbrooke
Works description: Sawcut And Infill Idr – P/H’S X 5 .60 X .50 X 30mm .50 X .30 X 30mm .50 X .30 X 30mm .40 X .40 X 40mm O/S No.31 .90 X .40 X 40mm O/S No.33/35 Tm – Road Closure (Cw: Pothole) Carisbrooke
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3021 Castle Street, East Cowes, Isle Of Wight
19 May — 20 May
Delays possible Traffic control (multi-way signals)
Works location: Junction Castle Street/Columbine Road/Maresfield Road/Old Road
Works description: Service Sewer Monitoring Equipment Within The Foul Manhole Chamber
Responsibility for works: Southern Water
Current status: Advanced planning
B3323 Bowcombe Road, Carisbrooke, Isle Of Wight
20 May — 03 June
Delays possible Traffic control (two-way signals)
Works location: Carisbrooke: From Junction With Nodgham Lane 590m West Towards Shorwell, Ml 230069: Bowcombe Road-Carisbrooke
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Carisbrooke
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3323 St James Street, Newport, Isle Of Wight
20 May — 26 May
Delays possible Some carriageway incursion
Works location: O/S 80
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3395 Embankment Road, Bembridge, Isle Of Wight
19 May — 23 May
Delays possible Traffic control (Stop/Go boards)
Works location: 43m North East Frm Rear Of 1 Redwing Quay To Across C/W To 43m North East Frm Opp Rear Of 1 Redwing Qu
Works description: Install 3m Of 1 Way Poly Duct In Footway,Install 6m Of 1 Way Poly Duct In Carriageway
Responsibility for works: BT
Current status: Advanced planning
Watery Lane, Newchurch, Isle Of Wight
19 May — 02 June
Delays possible Traffic control (two-way signals)
Works location: Os Garden Centre, Watery Lane,
Works description: Shanklin – Pcp11 – 317990 – Bduk – Remedial Works – To Clear Highway Defect
Responsibility for works: BT
Current status: Advanced planning
A3054 Halletts Shute, Yarmouth, Isle Of Wight
19 May — 23 May
Delays unlikely Traffic control (give & take)
Works location: Yarmouth: From Pixley Hill North East To Norton Corner, 320m Towards Yarmouth: Halletts Shute-Yarmouth
Works description: Footway Re-Surfacing (Fwr : Bit Fullrecon) Yarmouth
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3399 Main Road, Brighstone, Isle Of Wight
20 May — 27 May
Delays unlikely Traffic control (give & take)
Works location: Brighstone: From Junction With New Road, 620m East Towards Shorwell, Ml 630128: Main Road-Brighstone
Works description: Footway Re-Construction And Surfacing (Fwr : Bit Fullrecon) Brighstone
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3401 Main Road, Thorley, Isle Of Wight
20 May — 25 May
Delays unlikely Traffic control (give & take)
Works location: Thorley: From Junction With Blacksmiths Lane 250m East Towards Wellow Ml 630147: Main Road-Thorley
Works description: Footway Re-Construction And Surfacing (Fwr : Bit Fullrecon) Thorley
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Alverstone Road, Newchurch, Isle Of Wight
19 May — 27 May
Delays unlikely Some carriageway incursion
Works location: Os Ruskin
Works description: Relay Service From Farside Footway To Site
Responsibility for works: SGN
Current status: Advanced planning
Crocker Street, Newport, Isle Of Wight
19 May — 08 June
Delays unlikely Some carriageway incursion
Works location: O/S 75 Crocker And 34/35 Holyrood Street
Works description: Scaffolding
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Dudley Road, Ventnor, Isle Of Wight
20 May — 24 May
Delays unlikely Some carriageway incursion
Works location: 15 Dudley Road , Ventnor, Isle Of Wight.
Works description: – Install New Water Connection
Responsibility for works: Southern Water
Current status: Advanced planning
Longhalves Lane, Freshwater, Isle Of Wight
19 May — 24 May
Delays unlikely Traffic control (give & take)
Works location: Freshwater: From Junction With School Green Road, 107m, Ml 660609: Longhalves Lane-Freshwater
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon) Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Moon Close Path, East Cowes, Isle Of Wight
19 May — 23 May
Delays unlikely Traffic control (give & take)
Works location: East Cowes: Footway Link From Moon Close To Benton Close: Moon Close Path-East Cowes
Works description: Footway Reconstruction And Surfacing (Fwl Bit : Partrecon) East Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Newport Quay, Newport, Isle Of Wight
19 May — 20 May
Delays unlikely Some carriageway incursion
Works location: Up From Jct Sea Street, In Newport Quay
Works description: Service Sewer Monitoring Equipment Within The Foul Manhole Chamber
Responsibility for works: Southern Water
Current status: Advanced planning
Priory Farm Lane, Carisbrooke, Isle Of Wight
20 May — 27 May
Delays unlikely No carriageway incursion
Works location: Os 5
Works description: Lay New Service From Nearside Verge To Site
Responsibility for works: SGN
Current status: Advanced planning
South Street, Ryde, Isle Of Wight
20 May — 02 June
Delays unlikely Some carriageway incursion
Works location: O/S 4
Works description: Skip
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Spencer Road, Ryde, Isle Of Wight
19 May — 23 May
Delays unlikely Some carriageway incursion
Works location: Os Ryde Tel Exchange, Spencer Road
Works description: Install 2m Of 1 Way Poly Duct In Footway,Provide 1 Core Drill(S) Into Jointbox Or Building
Responsibility for works: BT
Current status: Advanced planning