A3055 Brading Road, Ryde, Isle Of Wight
21 September — 23 September
Delays likely Traffic control (multi-way signals)
Works location: On The Footway Of Brading Rd Approx 105m From Cothey Way
Works description: “Day 1 – Placing Small Hiab On Verge (30-40 Mins Max) Install New Telecom Bases Day 2 – Placing Small Hiab On Verge For 30-40 Mins Max To Install New Cabinets Onto Bases Installed Prior. Day 3 – Completion Of Electrical Works Inside Cabinet – No Cw Incursion Barriers To Be Used All 3 Days To Create Safe Working Enviroment”. Footway Diversion Will Be In Place
Responsibility for works: T-Mobile (UK)Limited
Current status: Advanced planning

Apse Manor Road, Shanklin, Isle Of Wight
21 September — 23 September
Delays possible Traffic control (two-way signals)
Works location: Shanklin: From Apse Manor Driveway, 650m North Towards Apse Heath Area. Mls 440224 And 440225: Apse Manor Road
Works description: Prep Works To Allow For Resurfacing Shanklin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Briddlesford Road, Newport, Isle Of Wight
21 September — 22 September
Delays possible Traffic control (Stop/Go boards)
Works location: Newport: From Junction With Long Lane And The Recycling Centre, Ml 310178a: Briddlesford Road-Newport
Works description: Carriageway Investigation Works Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Calbourne Road, Newport, Isle Of Wight
21 September — 22 September
Delays possible Traffic control (Stop/Go boards)
Works location: Newport: From Blacksmiths Arms, 330m West Towards Calbourne: Calbourne Road-Newport
Works description: Carriageway Investigation Works Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Grange Road, Sandown, Isle Of Wight
21 September — 23 September
Delays possible Traffic control (multi-way signals)
Works location: Broadway Jcn Of Leed Street Southwards Down To Jcn At Beachfield Road
Works description: 2 Way And Multiway Traffic Lights Required For Safe Access To Bt Boxes For Cabling Provision Purposes To Be Done At Night 22:00 – 06:00 To Minimise Disruption
Responsibility for works: BT
Current status: Advanced planning

Gravel Pit Lane, Havenstreet, Isle Of Wight
21 September — 22 September
Delays possible Traffic control (Stop/Go boards)
Works location: Havenstreet: From Junction With Combley Road To Briddlesford Road, Ml 341289, 216m: Gravel Pit Lane-Havenstree
Works description: Carriageway Investigation Works Havenstreet
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Staplers Road, Newport, Isle Of Wight
21 September — 22 September
Delays possible Traffic control (Stop/Go boards)
Works location: Newport: From Entrance To Electricity Sub Station, 470m Towards Wootton: Staplers Road-Newport
Works description: Carriageway Investigation Works Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Staplers Road, Newport, Isle Of Wight
22 September — 23 September
Delays possible Traffic control (two-way signals)
Works location: Newport: From Monkey Haven Towards Newport As Far As The Roundabout At The Junction With Long Lane Roundabout:
Works description: Please Cut Back Overhanging Branches And Hedges That Are Encroaching Vehicles Using This Section Of Carriageway (Tr: Tree Pruning Request) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3395 Church Road, Bembridge, Isle Of Wight
21 September — 04 October
Delays unlikely Some carriageway incursion
Works location: In Carriageway From O/S Silver Sands To O/S Westhill
Works description: Excavation Of Joint Hole In Carriageway To Disconnect Temporary Electrical Supply Used For Building Mccarthy & Stone Development.
Responsibility for works: Southern Electric
Current status: Advanced planning

Park Road, Ryde, Isle Of Wight
22 September — 05 October
Delays unlikely Some carriageway incursion
Works location: In Footway From O/S Substation To Junc With Barfield…
Works description: Excavation Of Joint Hole In Carriageway To Provide New Electrical Supplies To New Flats At Barfield…
Responsibility for works: Southern Electric
Current status: Advanced planning

Camp Road, Freshwater, Isle Of Wight
22 September — 30 September
Delays unlikely Some carriageway incursion
Works location: Os Halcyon
Works description: Relay Service From Farside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning

Church Hill, Totland, Isle Of Wight
22 September — 26 September
Delays unlikely No carriageway incursion
Works location: O/S Sunnybank Cottages, Church Hill
Works description: Locate And Excavate 1 Blockage In Existing Duct In Footway
Responsibility for works: BT
Current status: Advanced planning

Cross Street, Cowes, Isle Of Wight
21 September — 27 September
Delays unlikely Some carriageway incursion
Works location: 31 Cross Street, Cowes
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Culver Way, Sandown, Isle Of Wight
21 September — 23 September
Delays unlikely Traffic control (give & take)
Works location: Sandown: Top Left Hand Section Of Culver Way (Ml 440332): Culver Way-Sandown
Works description: Remedial Works To Footways Sandown
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Elm Lane, Calbourne, Isle Of Wight
22 September — 23 September
Delays unlikely Some carriageway incursion
Works location: 442497 087060 In Verge Opposite 7, Elm Lane
Works description: Replace 1 Existing Pole
Responsibility for works: BT
Current status: Advanced planning

Fitzroy Street, Sandown, Isle Of Wight
22 September — 05 October
Delays unlikely Some carriageway incursion
Works location: 2 Fitzroy Street Sandown Isle Of Wight Po36 8hy
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Green Street, Ryde, Isle Of Wight
22 September — 26 September
Delays unlikely No carriageway incursion
Works location: 459018 092222 O/S Greenmount Primary School, Green Street
Works description: Replace 1 Existing Pole 0.5m X 0.5m
Responsibility for works: BT
Current status: Advanced planning

Gregory Close, Nettlestone, Isle Of Wight
21 September — 23 September
Delays unlikely Traffic control (give & take)
Works location: Nettlestone: Whole Length Of Cul De Sac (Ml 361537): Gregory Close-Nettlestone
Works description: Remedial Works To Footways Nettlestone
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Heath Gardens, Lake, Isle Of Wight
22 September — 26 September
Delays unlikely Some carriageway incursion
Works location: 15, Heath Gdns, Sandown, Po368pq
Works description: – Remedial Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

High Street, Yarmouth, Isle Of Wight
22 September — 05 October
Delays unlikely Some carriageway incursion
Works location: Dentist, High Street, Yarmouth
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Horestone Drive, Nettlestone, Isle Of Wight
21 September — 23 September
Delays unlikely Traffic control (give & take)
Works location: Nettlestone: Whole Length Of Footway From Horestone Rise (Ml 340553): Horestone Drive-Nettlestone
Works description: Remedial Works To Footways Nettlestone
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Horestone Rise, Nettlestone, Isle Of Wight
21 September — 23 September
Delays unlikely Traffic control (give & take)
Works location: Nettlestone: Whole Length Of Road From Gully Road (Ml 340554): Horestone Rise-Nettlestone
Works description: Remedial Works To Footways Nettlestone
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Madeira Road, Ventnor, Isle Of Wight
22 September — 30 September
Delays unlikely Some carriageway incursion
Works location: Os 45
Works description: Relay Service From Nearside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning

Mews Lane, Newport, Isle Of Wight
22 September — 26 September
Delays unlikely No carriageway incursion
Works location: 26m North West From Junc Newport Footpath 117 To 98m South West From Junc Newport Footpath 117, Mews Lane
Works description: Install 180m Of Cables In Verge
Responsibility for works: BT
Current status: Advanced planning

Quay Street, Yarmouth, Isle Of Wight
22 September — 28 September
Delays unlikely Some carriageway incursion
Works location: O/S The Chemist, Quay Street, Yarmouth
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Sandcove Rise, Seaview, Isle Of Wight
21 September — 23 September
Delays unlikely Traffic control (give & take)
Works location: Seaview: Whole Length Of Road From Junction With Spithead Close 203m: Sandcove Rise-Seaview
Works description: Remedial Works To Footways Seaview
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Solent View Road, Nettlestone, Isle Of Wight
21 September — 23 September
Delays unlikely Traffic control (give & take)
Works location: Nettlestone: From Old Seaview Lane 300mtrs South (Ml 340563): Solent View Road-Nettlestone
Works description: Remedial Works To Footways Nettlestone
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Spencer Glade, Ryde, Isle Of Wight
21 September — 23 September
Delays unlikely Traffic control (give & take)
Works location: Ryde: Whole Length Of Road From Junction With Spencer Glade: Spencer Glade-Ryde
Works description: Remedial Works To Footways Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Whitcombe Road, Newport, Isle Of Wight
22 September — 26 September
Delays unlikely No carriageway incursion
Works location: 409m South East From Junc Caste Lane On, Whitcombe Road
Works description: Install 1m Of 1 Way Poly Duct In Verge
Responsibility for works: BT
Current status: Advanced planning