Road cones:

Isle of Wight roadworks and road closures 28th April

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

It covers work carried out by BT, utility companies and Island roads.

Isle of Wight roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

A3020 High Street, Godshill, Isle Of Wight
29 April — 29 June
Delays likely Road closure
Works location: Godshill: From Hollow Lane To Church Lane (Ml 510010): High Street-Godshill:; Cw Cip Scheme Cw Cip Scheme
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Godshi
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 School Road, Godshill, Isle Of Wight
29 April — 29 June
Delays likely Road closure
Works location: Godshill: From Church Hollow To Newport Road (Ml510011): School Road-Godshill
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H1 Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Urban:H1 (Kerbed=Inlay/Unkerbed=Overlay) Godshill
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Esplanade, Ryde, Isle Of Wight
28 April — 28 June
Delays likely Road closure
Works location: Ryde: From Dover Street For The Entire Length Of The Roundabout (Ml 310061): Esplanade-Ryde
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:U/H1 Resurface 25mm Ul-M 65psv Plus Regulating-Urban:H/1(Kerbed=Inlay/Unkerbed=Overlay) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Ash Grove, Cowes, Isle Of Wight
29 April — 29 June
Delays likely Road closure
Works location: Cowes: From Mill Hill Road To Love Lane (Ml140197) : Ash Grove-Cowes:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3341 Castle Hill, Newport, Isle Of Wight
28 April — 28 June
Delays likely Road closure
Works location: Newport: Ml 240085 Betwen The Junctions Of Castle Lane And Cedar Hill: Castle Hill-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4 F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) (Kerbed=Inlay/Unkerbed=Overlay) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Beatrice Avenue, East Cowes, Isle Of Wight
29 April — 01 June
Delays likely Road closure
Works location: East Cowes: From Gort Road To Crossways Road (Ml130234) : Beatrice Avenue-East Cowes:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H3, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural: H3) East C
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Beatrice Avenue, East Cowes, Isle Of Wight
29 April — 01 June
Delays likely Road closure
Works location: East Cowes: From Victoria Grove To Gort Road (Ml130233) : Beatrice Avenue-East Cowes:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) East C
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Brook Village Road, Brook, Isle Of Wight
29 April — 20 May
Delays likely Road closure
Works location: Brook: Ml 630196 From Badger Lane To A Point 344 Meters North East Thereof, To O/S A Property Named Lorien: Brook Villag
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3 Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) (Kerbed=Inlay/Unkerbed=Overlay) Brook
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Churchill Close, Lake, Isle Of Wight
29 April — 29 June
Delays likely Road closure
Works location: Lake: From Churchill Close Heading South In Cul-De-Sac Dead End (Ml 460504): Churchill Close-Lake:; Cw Cip Scheme Cw Cip
Works description: Carriageway Reconstruction, Concrete Bay Repair (Cc-Recon5%:U/H4, 5% Concrete Reconstruction And Seal Joints-Urban:H4) Lake
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Collingwood Road, Shanklin, Isle Of Wight
28 April — 28 June
Delays likely Road closure
Works location: Shanklin: From Landguard Road To Northbourne Avenue (Ml440242): Collingwood Road-Shanklin
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Cc-Recon20%:U/H4 20% Concrete Reconstruction And Seal Joints-Urban:H4 (Kerbed=Inlay/Unkerbed=Overlay) Shanklin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Collingwood Road, Shanklin, Isle Of Wight
28 April — 28 June
Delays likely Road closure
Works location: Shanklin: From Northbourne Avenue 210 M West (Ml 440243): Collingwood Road-Shanklin:; Cw Cip Scheme Cw Cip Scheme
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Shankl
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Rectory Lane, Gatcombe, Isle Of Wight
29 April — 04 May
Delays likely Road closure
Works location: Gatcombe: At The Jnc Of Rectory Road And Gatcombe Road: Rectory Lane-Gatcombe
Works description: Idr – Edge Of C/Way Erosion Requires Patching Appx 13.0 X .70 X 100/150mm Tm – Road Closure Gatcombe
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3401 Calbourne Road, Newport, Isle Of Wight
28 April — 28 April
Delays possible Traffic control (two-way signals)
Works location: Opposite Little Shilllings, Calbourne Road, Newport Isle Of Wight Po30 4pt
Works description: Access Required To Underground Bt Structure To Provide Service – No Structural Changes. Work Being Carried Out On Existing Bt Plant
Responsibility for works: BT
Current status: Advanced planning

B3401 Station Road, Ningwood, Shalfleet, Isle Of Wight
29 April — 29 April
Delays possible Traffic control (multi-way signals)
Works location: Shalfleet: On Bend It Juc Of Station Road And Upper Road Wellow: Station Road-Shalfleet
Works description: Edge Of Carriage Pot Hole, Patch Repair Required 10.0 X 1.0 X 35mm Tm Ds Advices Possible 3 Way Traffic Lights (Cw: Pothole) Shalfleet
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Bunts Hill, Porchfield, Isle Of Wight
29 April — 03 May
Delays possible Traffic control (Stop/Go boards)
Works location: Porchfield: Ml 630184 From Bunts Hill Barns To Hillside Property: Bunts Hill-Porchfield
Works description: #11 Minor Drainage Scheme Porchfield
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Ashlake Copse Road, Wootton, Isle Of Wight
28 April — 10 May
Delays unlikely Some carriageway incursion
Works location: Os Orchard Lodge
Works description: Lay New Service From Farside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning

B3401 Shide Road, Newport, Isle Of Wight
28 April — 12 May
Delays unlikely Traffic control (give & take)
Works location: Newport: From The Junction With Medina Avenue, West To Junction With Watergate Road (Ml 230106, Ml 230105 & Ml 230104):
Works description: Replacement Of N� 5 Signs (2 X Give Way, 2 X Bend Ahead & 1 X Roundabout) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Burnt House Lane, Newport, Isle Of Wight
29 April — 13 May
Delays unlikely Traffic control (give & take)
Works location: Newport: Loc 1 – North West Of The Junction Of Pan Lane & Burnthouse Lane. Loc 2 – At The Junction Of St Georges Way &
Works description: Replacement Of N� 4 Signs (1 X Give Way Ahead, 1 X Give Way & 2 X Speed Restriction) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Heathfield Road, Freshwater, Isle Of Wight
28 April — 04 May
Delays unlikely Traffic control (give & take)
Works location: Freshwater: From Junction With Heathfields Close To The Shielings, 230m, Ml 630213: Heathfield Road-Freshwater
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Heathfield Road, Freshwater, Isle Of Wight
29 April — 04 May
Delays unlikely Some carriageway incursion
Works location: Saxonbury, Heathfield Rd, Freshwater
Works description: Remedial Reinstatement Of Core Failure.
Responsibility for works: Southern Water
Current status: Advanced planning

High Street, Yarmouth, Isle Of Wight
29 April — 05 May
Delays unlikely Some carriageway incursion
Works location: The Deacons, High Street, Yarmouth
Works description: Scaffolding
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Catherine Terrace, Newport, Isle Of Wight
29 April — 04 May
Delays unlikely Some carriageway incursion
Works location: 12 Catherine Terrace
Works description: – Remedial Reinstatement Of Failed Core.
Responsibility for works: Southern Water
Current status: Advanced planning

College Road, Newport, Isle Of Wight
29 April — 13 May
Delays unlikely Traffic control (give & take)
Works location: Newport: At The Junction Of Shide Road & College Road (Ml 240307):
Works description: Replacement Of N� 1 Sign (1 X Give Way) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Mill Street, Newport, Isle Of Wight
29 April — 04 May
Delays unlikely Some carriageway incursion
Works location: Old Unigate Dairy
Works description: – Remedail Reinstatement Of Failed Core.
Responsibility for works: Southern Water
Current status: Advanced planning

St Pauls Crescent, Shanklin, Isle Of Wight
28 April — 02 May
Delays unlikely Some carriageway incursion
Works location: 19 St. Pauls Crescent. Shanklin, Isle Of Wight.
Works description: Remidial Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

The Square, Freshwater, Isle Of Wight
28 April — 06 May
Delays unlikely Some carriageway incursion
Works location: Os Rockstone
Works description: Relay Service From Farside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning

Uplands Road, Northwood, Isle Of Wight
28 April — 05 May
Delays unlikely Traffic control (give & take)
Works location: Northwood: From Junction With Fieldway Crescent 280m South, Ml 140174: Uplands Road-Northwood
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Northwood
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Upper Moorgreen Road, Cowes, Isle Of Wight
29 April — 05 May
Delays unlikely Some carriageway incursion
Works location: O/S 115
Works description: Skip App. 115 Upper Moorgreen Road, 29/04 – 05/05
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Image: Hills_Alive under CC BY 2.0