Isle of Wight roadworks or road closures starting today or tomorrow.
Information provided by Elgin via Roadworks.org. It covers work carried out by BT, utility companies and Island roads.
Streetworks / Licence, Streetworks
Carriageway reconstruction
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Appuldurcombe Road
Location: at Redhill Lane, Wroxall, Isle of Wight (Appuldurcombe Road)
29 September — 14 October
Diversion route
Name: Diversion
Location: at Redhill Lane, Wroxall, Isle of Wight (Diversion)
29 September — 14 October
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: In progress
Morton Road, Brading, Isle Of Wight
29 September — 03 October
Delays likely Traffic control (multi-way signals)
Works location: O/S Ramleh Cottage
Works description: Th6 For Ground Investigations And To Locate Existing Water Mains And Services As Part Of The Morton Road Water Mains Renewal Scheme
Responsibility for works: Southern Water
Current status: Advanced planning
Morton Road, Brading, Isle Of Wight
29 September — 03 October
Delays likely Traffic control (two-way signals)
Works location: O/S Kenya
Works description: Th1 For Ground Investigations And To Locate Existing Water Mains And Services As Part Of The Morton Road Water Mains Renewal Scheme
Responsibility for works: Southern Water
Current status: Advanced planning
Redhill Lane, Wroxall, Isle Of Wight
29 September — 14 October
Delays likely Road closure
Works location: Wroxall: From Shanklin Road, Heading South For 360m (Ml540233): Redhill Lane-Wroxall:; Cw Cip Scheme Cw Cip Scheme
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4) Wroxal
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Redhill Lane, Wroxall, Isle Of Wight
29 September — 14 October
Delays likely Road closure
Works location: Wroxall: 500m North Of Appuldurcombe Road, Deading North For 490m (Ml 540231): Redhill Lane-Wroxall:; Cw Cip Scheme Cw C
Works description: Carriageway Reconstruction, Road Closure Required. (Ff-Fibrovia:R/H4, Resurface 30mm Fibrovia Plus Regulating/Patching (Kerbed=Inlay/Unkerbed=Overlay)-Rural: H4) Wroxal
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Redhill Lane, Wroxall, Isle Of Wight
29 September — 14 October
Delays likely Road closure
Works location: Wroxall: Approximately 360m South Of Junction With Shanklin Road, Heading South For 420m (Ml 540232) : Redhill Lane-Wrox
Works description: Carriageway Reconstruction, Road Closure Required. (Ff-Fibrovia:R/H4, Resurface 30mm Fibrovia Plus Regulating/Patching (Kerbed=Inlay/Unkerbed=Overlay)-Rural: H4) Wroxal
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Redhill Lane, Wroxall, Isle Of Wight
29 September — 14 October
Delays likely Road closure
Works location: Wroxall: From Appuldurcombe Road 500m North (Ml540230): Redhill Lane-Wroxall:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4) Wroxal
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Blackwater Road, Newport, Isle Of Wight
29 September — 05 October
Delays possible Some carriageway incursion
Works location: 2 Brookside, Blackwater Road
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Newport Road, Cowes, Isle Of Wight
29 September — 05 October
Delays possible Some carriageway incursion
Works location: Stanley Road (140 Newport Road), Cowes
Works description: Skip
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Church Street, Ventnor, Isle Of Wight
29 September — 26 October
Delays unlikely Some carriageway incursion
Works location: 21 Church Street, Ventnor
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Cliff Road, Totland, Isle Of Wight
30 September — 04 October
Delays unlikely Some carriageway incursion
Works location: Corner Cottage, Cliff Road , Totland, Iow.
Works description: – Install Pressure Point.
Responsibility for works: Southern Water
Current status: Advanced planning
Mews Lane, Newport, Isle Of Wight
30 September — 04 October
Delays unlikely No carriageway incursion
Works location: Private Road. 26m North West From Junc Newport Footpath 117 To 98m South West From Junc Newport Footpath 117, Mews Lane
Works description: Install 180m Of Cables In Verge
Responsibility for works: BT
Current status: Advanced planning
Mountbatten Avenue, Cowes, Isle Of Wight
29 September — 03 October
Delays unlikely Traffic control (give & take)
Works location: Cowes: Link Footway Off Mountbatten Avenue, Ml F10708: Mountbatten Avenue-Cowes
Works description: Footway Reconstruction And Surfacing (Fwl : Bit Partrecon) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Ridget Lane, Brighstone, Isle Of Wight
29 September — 03 October
Delays unlikely Some carriageway incursion
Works location: Hoxall Cottage, Hoxall Lane, Mottistone ,Iow.
Works description: – Install New Water Connection
Responsibility for works: Southern Water
Current status: Advanced planning
Star Street, Ryde, Isle Of Wight
29 September — 12 October
Delays unlikely Some carriageway incursion
Works location: Ryde Cinema, Star Street, Ryde
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Venner Avenue, Northwood, Isle Of Wight
30 September — 04 October
Delays unlikely Traffic control (give & take)
Works location: Northwood: Whole Length Of Road From Wyatts Lane To Wroxall Close, 120m, Ml 141328: Venner Avenue-Northwood
Works description: Footway Reconstruction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Northwood
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Yarborough Road, East Cowes, Isle Of Wight
29 September — 05 October
Delays unlikely Some carriageway incursion
Works location: 18 Yarborough Road,East Cowes
Works description: Skip
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning