road works

Isle of Wight roadworks and road closures 3rd June

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

It covers work carried out by BT, utility companies and Island roads.

Isle of Wight roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

A3054 Binstead Road, Ryde, Isle Of Wight
03 June — 10 June
Delays likely Traffic control (give & take)
Works location: Ryde: From Junction Of Ringwood Road To Stonepitts Close (Ml 310020): Binstead Road-Ryde
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 Yarmouth Road, Cranmore, Isle Of Wight
03 June — 06 June
Delays likely Traffic control (two-way signals)
Works location: Near The Greenbarn, Lucketts, Main Road, On Yarmouth Road, Bouldnor,Yarmouth Po41oxn
Works description: Yarmouth – Pcp9 – 331194 – 331195 – 331191 – Remedial Works – To Clear Internal 212 Defect
Responsibility for works: BT
Current status: Advanced planning

Ashtree Way, Nettlestone, Isle Of Wight
03 June — 03 June
Delays likely Road closure
Works location: Nettlestone: Ml 341454 Whole Road: Ashtree Way-Nettlestone
Works description: Surfacing Preparatory Works. Joint Sealing Of Concrete Road. Nettlestone
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Atkinson Drive, Newport, Isle Of Wight
04 June — 04 June
Delays likely Road closure
Works location: Newport: 240204 From The Junction Of Halberry Lane, Up To O/S No’S. 27 & 32: Atkinson Drive-Newport
Works description: Surfacing Preparatory Works. Joint Sealing Of Concrete Road. Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3323 St James Street, Newport, Isle Of Wight
03 June — 07 June
Delays likely Road closure
Works location: Newport: C/W On The Crossing Outside Of Mcdonalds (As Marked Onsite): St James Street-Newport
Works description: 28 Day Perm Required Sawcut And Infill Carriageway Repairs, Made Safe With Cold Lal X3 P/H Defects On The Crossing Outside Of Mcdonalds, 0.25mx0.2mx15mm, 1.1mx0.1mx15mm & 0.25mx0.1mx20mm. 1) 1.5m2 Around M/H Cover 2) 0.7m2 Around Double Bt Cover Tm Closure Req (Cw: Pothole) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Binstead Lodge Road, Binstead, Isle Of Wight
03 June — 03 June
Delays likely Road closure
Works location: Binstead: Ml 340484 Between The Junctions Of Hillrise Avenue Fleming Close: Binstead Lodge Road-Binstead
Works description: Surfacing Preparatory Works. Joint Sealing Of Concrete Road. Binstead
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Binstead Lodge Road, Binstead, Isle Of Wight
04 June — 04 June
Delays likely Road closure
Works location: Binstead: Ml 340483 From The Junction Of Hillrise Avenue To The Spur Road Between No.’S 134 & 146 (375 Meters): Binstead
Works description: Surfacing Preparatory Works. Joint Sealing Of Concrete Road. Binstead
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Beacon Alley, Godshill, Isle Of Wight
03 June — 15 July
Delays likely Road closure
Works location: Godshill: Ml 530116 From Whitwell Road To A Point 500 Metres West Thereof: Beacon Alley-Godshill
Works description: Carriageway Resurfacing Scheme Inclusive Of: Preparatory Works Such As Kerbing, Drainage, Reinstatement Of Access, Quartering, Duct Trenches Etc. Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining Godshill
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Beacon Alley, Godshill, Isle Of Wight
03 June — 15 July
Delays likely Road closure
Works location: Godshill: (Ml 530115) 147 Metres From Bagwich Lane To 620 Metres From Bagwich Lane: Beacon Alley-Godshill
Works description: Carriageway Resurfacing Scheme Inclusive Of: Preparatory Works Such As Kerbing, Drainage, Reinstatement Of Access, Quartering, Duct Trenches Etc. Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining Godshill
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

The Mall, Brading, Isle Of Wight
03 June — 07 June
Delays likely Road closure
Works location: Brading: Halfway Up The Mall On The Downs Bound Side Of The C/Way: The Mall-Brading
Works description: Idr – P/H’S X 5 .40 X .30 X 30mm .30 X .20 X 30mm .40 X .30 X 30mm .50 X .30 X 30mm .20 X .30 X 30mm Tm – Stop & Go Boards And Parking Restrictions Opposite The Site (Cw: Pothole) Brading
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Watery Lane, Newchurch, Isle Of Wight
03 June — 15 July
Delays likely Road closure
Works location: Newchurch: Ml 430185 Between Harbors Lake Lane And Winford Road: Watery Lane-Newchurch
Works description: Carriageway Resurfacing Scheme Inclusive Of: Preparatory Works Such As Kerbing, Drainage, Reinstatement Of Access, Quartering, Duct Trenches Etc. Resurfacing Of The Carriageway. Post Works To Kerbs, Access, Drainage, Utility Covers And Frames And Lining Newchurch
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Cherrytree Road, Nettlestone, Isle Of Wight
03 June — 03 June
Delays likely Road closure
Works location: Nettlestone: Ml 342456 Between Orchard Road And Caws Avenue: Cherrytree Road-Nettlestone
Works description: Surfacing Preparatory Works. Joint Sealing Of Concrete Road. Nettlestone
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Chestnut Grove, Ryde, Isle Of Wight
03 June — 03 June
Delays likely Road closure
Works location: Ryde: Ml 363500 Whole Road: Chestnut Grove-Ryde
Works description: Surfacing Preparatory Works. Joint Sealing Of Concrete Road. Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Madeira Road, Totland, Isle Of Wight
03 June — 07 June
Delays likely Road closure
Works location: Totland: Just Before And After The Footbridge Over The C/Way: Madeira Road-Totland
Works description: Idr – P/H’S And Poor Surface Requires Patching 6.5 X 1.0 X 50/100mm 2.0 X 1.0 X 50/100mm 5.0 X 1.5 X 50/100mm P/H’S .40 X .30 X 30mm .70 X .30 X 30mm .70 X .40 X 30mm .60 X .30 X 30mm Tm -Ds Advices Possible Road Closure (Cw: Pothole) Totland
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Redhill Lane, Wroxall, Isle Of Wight
03 June — 15 July
Delays likely Road closure
Works location: Wroxall: Approximately 360m South Of Junction With Shanklin Road, Heading South For 420m (Ml 540232) : Redhill Lane-Wrox
Works description: Carriageway Reconstruction, Road Closure Required. (Ff-Fibrovia:R/H4, Resurface 30mm Fibrovia Plus Regulating/Patching (Kerbed=Inlay/Unkerbed=Overlay)-Rural: H4) Wroxal
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Redhill Lane, Wroxall, Isle Of Wight
03 June — 15 July
Delays likely Road closure
Works location: Wroxall: From Appuldurcombe Road 500m North (Ml540230): Redhill Lane-Wroxall:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4) Wroxal
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Redhill Lane, Wroxall, Isle Of Wight
03 June — 15 July
Delays likely Road closure
Works location: Wroxall: From Shanklin Road, Heading South For 360m (Ml540233): Redhill Lane-Wroxall:; Cw Cip Scheme Cw Cip Scheme
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4) Wroxal
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Redhill Lane, Wroxall, Isle Of Wight
03 June — 15 July
Delays likely Road closure
Works location: Wroxall: 500m North Of Appuldurcombe Road, Deading North For 490m (Ml 540231): Redhill Lane-Wroxall:; Cw Cip Scheme Cw C
Works description: Carriageway Reconstruction, Road Closure Required. (Ff-Fibrovia:R/H4, Resurface 30mm Fibrovia Plus Regulating/Patching (Kerbed=Inlay/Unkerbed=Overlay)-Rural: H4) Wroxal
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Sandy Lane, Newport, Isle Of Wight
03 June — 07 June
Delays likely Road closure
Works location: Newport: Between The J/O Marvel Lane And Paradise Farm (West Of Marvel Ln): Sandy Lane-Newport
Works description: Carriageway Repairs X14 P/Hs & X3 Patches P/Hs 0.3mx0.25mx25mm 0.3mx0.2mx20mm 0.35mx0.35mx20mm 0.25mx0.2mx20mm 0.4mx0.3mx25mm 0.35mx0.15mx20mm 0.6mx0.45mx20mm 0.4mx0.3mx20mm 0.3mx0.25mx25mm 0.6mx0.6mx20mm 0.2mx0.15mx25mm 0.5mx0.25mx25mm 0.15mx0.1mx25mm 0.3mx0.3mx30mm Patch 1.8mx0.8m 1.2mx1.4m 2.1mx1.6m Tm Ds Advices Possible Road Closure Req (Cw: Pothole) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Upper Lane, Brighstone, Isle Of Wight
03 June — 07 June
Delays likely Road closure
Works location: Brighstone: O/S Bracken To The End Of The Lane: Upper Lane-Brighstone
Works description: Idr – P/H, Crazing, Delam And Fretting 3 X Patches Required 1.5 X .50 X 50/100mm 3.0 X 1.2 X 50/100mm 10.0 X 1.4 X 50/100mm Tm – Ds Advices Possible Road Closure (Cw: Pothole) Brighstone
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Warlands Lane, Shalfleet, Isle Of Wight
03 June — 07 June
Delays likely Road closure
Works location: Shalfleet: On The Edge Of C/Way On The Bend O/S Warlands Farm: Warlands Lane-Shalfleet
Works description: Idr – P/H .60 X .60 X 40mm Tm – Stop & Go Boards (Cw: Pothole) Shalfleet
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Warnes Lane, Brighstone, Isle Of Wight
03 June — 07 June
Delays likely Road closure
Works location: Brighstone: On The Nearside Of The C/Way As You Enter The Car Park: Warnes Lane-Brighstone
Works description: Sawcut And Infill Idr – Edge Of C/Way Rutting/Crazing Patching X 2 Req’D 11.0 X 1.0 X 50/100mm 6.0 X 1.0 X 50/100mm Tm – Road Closure (Cw: Pothole) H4 Rural Brighstone
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3323 St James Street, Newport, Isle Of Wight
03 June — 28 July
Delays possible Some carriageway incursion
Works location: Old Beavis Building
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 High Street, Ventnor, Isle Of Wight
03 June — 09 June
Delays unlikely Some carriageway incursion
Works location: Outside 26a High Street Ventnor
Works description: Scaffolding
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3325 High Street, Cowes, Isle Of Wight
03 June — 09 June
Delays unlikely Some carriageway incursion
Works location: O/S 55
Works description: Cherry Picker
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3395 Embankment Road, Bembridge, Isle Of Wight
03 June — 06 June
Delays unlikely Some carriageway incursion
Works location: Frm In F/W 43m North East Frm Rear Of 1 Redwing Quay To Across C/W To In F/W 43m North East Frm Opp
Works description: Interim To Permanent Reinstatement Of Original Works
Responsibility for works: BT
Current status: Advanced planning

Pallance Road, Northwood, Isle Of Wight
03 June — 15 June
Delays unlikely Some carriageway incursion
Works location: O/S 101
Works description: Skip
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

The Mall, Brading, Isle Of Wight
03 June — 13 June
Delays unlikely Some carriageway incursion
Works location: Os 6
Works description: Lay New Service From Nearside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning

Chain Lane, Newport, Isle Of Wight
03 June — 07 July
Delays unlikely Some carriageway incursion
Works location: The Foot Therapy Centre
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Roslin Lane, Chillerton, Isle Of Wight
03 June — 07 June
Delays unlikely Some carriageway incursion
Works location: Os To Opp Roslin Farm, Roslin Lane, Chillerton
Works description: Chillerton – 324224 – 324222 – Remedial Works – To Clear Internal Defect – Multiple Defects In Verge
Responsibility for works: BT
Current status: Advanced planning

Image: Craig Sunter under CC BY 2.0