Isle of Wight roadworks or road closures starting today or tomorrow.
Information provided by Elgin via Roadworks.org. It covers work carried out by BT, utility companies and Island roads.
You can also check ongoing current works by visiting the Island Roads Website.
Streetworks / Licence, Streetworks
Quartering and hedge cutting works
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Road closure
Name: Lower Knighton Lane
Location: at Lower Knighton Lane, Newchurch, Isle of Wight (Lower Knighton Lane)
08 December — 09 December
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: Planned
Streetworks / Licence, Streetworks
Works by Aeropark Developments Ltd to make minor adjustments to manhole cover in carriageway
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Priority signs
Name: Mill Street
Location: at Mill Street, Newport, Isle of Wight (Mill Street)
07 December — 09 December
Responsibility: Island Roads on behalf of the Isle of Wight Council
Status: In progress
Horsebridge Hill, Newport, Isle Of Wight
07 December — 09 December
Delays likely Traffic control (two-way signals)
Works location: 53 Horsebridge Hill, Newport, Isle Of Wight.
Works description: – Install New Water Service.
Responsibility for works: Southern Water
Current status: Planned work about to start
Lower Knighton Lane, Newchurch, Isle Of Wight
08 December — 09 December
Delays likely Road closure
Works location: Newchurch: Whole Length Of Lane: Lower Knighton Lane-Newchurch
Works description: Quartering And Hedging 2.5m As Required Prior To Resurfacing Newchurch
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
St James Street, Newport, Isle Of Wight
07 December — 09 December
Delays likely Traffic control (multi-way signals)
Works location: Newport: O/S Fields.: St James Street-Newport
Works description: 1 Concrete Pad Has Lifted Slightly And Has Slight Movement
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Planned work about to start
Alum Bay New Road, Totland, Isle Of Wight
08 December — 20 December
Delays possible Traffic control (two-way signals)
Works location: Totland: From Junction With Church Hill, 440m Towards Alumbay: Alum Bay New Road-Totland
Works description: Footway Reconstruction And Surfacing (Fwl : Bit Fullrecon Fwr : Bit 50% Partrecon) Totland
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Planned work about to start
Carters Road, Ryde, Isle Of Wight
07 December — 09 December
Delays possible Traffic control (two-way signals)
Works location: Ryde: Opposite Ravens Oaks, Carters Road, Ryde: Carters Road-Ryde
Works description: Please Arrange To Have The Edge Of The C/Way Filled With Loose Material (Type 1, Crushed Concrete, Planings Or Earth) For Appx 45m X .30 X 40mm Along The Smallbrook Bound Side Of The C/Way Tm – Stop & Go Boards (Cw: Pothole) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Planned work about to start
Green Street, Ryde, Isle Of Wight
07 December — 20 December
Delays possible Some carriageway incursion
Works location: Adj To 1 Green St
Works description: Excavation In Footway For New Electric Supply
Responsibility for works: Southern Electric
Current status: Advanced planning
Castle Court, Ventnor, Isle Of Wight
08 December — 16 December
Delays unlikely Traffic control (give & take)
Works location: Ventnor: Short Spur At Top Right Of Castle Court, 31m, Ml 540256a: Castle Court-Ventnor
Works description: Footway Reconstruction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Ventnor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Hungerberry Close, Shanklin, Isle Of Wight
07 December — 09 December
Delays unlikely No carriageway incursion
Works location: Opp 10, Hungerberry Close
Works description: Replace 1 Jointbox Frame And Cover(S) (915mm X 445mm) In Footway
Responsibility for works: BT
Current status: Planned work about to start
Nelson Street, Ryde, Isle Of Wight
08 December — 21 December
Delays unlikely Some carriageway incursion
Works location: O/S 26
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Planned work about to start
Saunders Way, East Cowes, Isle Of Wight
08 December — 21 December
Delays unlikely Some carriageway incursion
Works location: From Opp 4 Grace Woodford Drive To Opp 10 Grace Woodford Drive
Works description: Excavation Of Joint Hole In Verge And Footway To Provide New Electrical Connection Proposed Marina Industrial Development
Responsibility for works: Southern Electric
Current status: Advanced planning