Road Closed at Undercliff Drive

Isle of Wight roadworks and road closures 26th April

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

It covers work carried out by BT, utility companies and Island roads.

Isle of Wight roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

West Street will be closed from 0930hrs Wednesday 27 April until 1630hrs Friday 29 April for the installation of a new gas connection by Southern Gas Networks. The closure is from Fairy Road to High Street. For further details contact SGN on 0800 912 1700
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

A3054 Fairlee Road, Newport, Isle Of Wight
27 April — 29 April
Delays likely Lane closure
Works location: Newport: From Fairlee Link Road 410m North (Ml210048): Fairlee Road-Newport:; Cw Cip Scheme Cw Cip Scheme
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H1, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Rural:H1) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 Main Road, Ningwood, Shalfleet, Isle Of Wight
26 April — 29 April
Delays likely Traffic control (give & take)
Works location: Shalfleet: From Hamstead Road, 270m South East, Ml 610031: Main Road-Shalfleet
Works description: Footway Re-Construction And Surfacing (Fwr : Bit Partrecon) Shalfleet
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3056 Arreton Road, Arreton, Isle Of Wight
27 April — 29 April
Delays likely Traffic control (two-way signals)
Works location: Arreton: From Junction Of Heasley Lane, South To Crossing (Ml 410064):
Works description: Slot Cutting For The New Traffic Signals Arreton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3325 High Street, Cowes, Isle Of Wight
26 April — 29 April
Delays likely Road closure
Works location: 92 High Street, Cowes, Isle Of Wight.
Works description: – Install New Water Connections
Responsibility for works: Southern Water
Current status: Advanced planning

B3399 Town Lane, Chale, Isle Of Wight
27 April — 05 May
Delays likely Road closure
Works location: Chale: From Chale Lane To Appleford Road (530083): Town Lane-Chale
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthne 25mm Ul-M 65psv And 85mm Foam Base-Rural:H3) Chale
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

West Street, Seaview, Isle Of Wight
27 April — 02 May
Delays likely Road closure
Works location: Os Albert Cottage
Works description: Lay New Service From Farside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning

A3054 Forest Road, Newport, Isle Of Wight
26 April — 28 April
Delays possible Traffic control (two-way signals)
Works location: Newport: W/B C/W At The Vehicle Crossing Entrance O/S Property Named Gilbeata House.: Forest Road-Newport – 15654
Works description: Gully Defect Works (Jetted In Approx 1m Came Up Agianst Obstruction) Please Attend Site Of A Reported Gully Blockage Following Jetting Works, Try To Rod Through. If Suspetced Collapsed System Or Other Investigation Needed, Close Down Further Works Required. Tm 2 Way Lights Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Leeson Road, Ventnor, Isle Of Wight
26 April — 28 April
Delays possible Traffic control (two-way signals)
Works location: Ventnor: O/S No. 53 (Ml 520063): Leeson Road-Ventnor
Works description: Trial Pit Excavation Ventnor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Military Road, Brighstone, Isle Of Wight
27 April — 29 April
Delays possible Traffic control (two-way signals)
Works location: Brighstone: Military Road-Brighstone, On Centre Of Carriageway At The Junction With Grange Road.: Military Road-Brighsto
Works description: Defect On The Randonnee Route, Idr , Two Pot Holes In Concrete Carriageway, 1:- 360mm X 190mm X 44mm Deep, 2:- 400mm X 150mm X 50mm Deep, Tm = Mobile Works, (Cw: Pothole) Brighstone
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3401 Calbourne Road, Newport, Isle Of Wight
27 April — 29 April
Delays possible Traffic control (Stop/Go boards)
Works location: Newport: From Rowbridge Lane To Alvington Road (Ml 220092-5): Calbourne Road-Newport
Works description: Road Core Excavations Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Long Lane, Newport, Isle Of Wight
26 April — 28 April
Delays possible Traffic control (two-way signals)
Works location: Newport: Long Lane, Newport. 1) The Post On The Grass O/S Holmbush At The Robin Hill Mini Roundabout 2) 30 Meters In To
Works description: 28 Day Perm Required The Large Sign On The Roundabout Needs New Posts Following A 24h Repair Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Alverstone Road, Newchurch, Isle Of Wight
27 April — 29 April
Delays possible Traffic control (two-way signals)
Works location: Newchurch: From Skinners Lane To Forestroad (Ml 430135): Alverstone Road-Newchurch
Works description: Surfacing Post Works To Accomodate Increase In Carriageway Height Newchurch
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Green Lane, Shanklin, Isle Of Wight
26 April — 04 May
Delays possible Traffic control (two-way signals)
Works location: Shanklin: From Junction With Princes Way To Wheeler Way, 190m, Ml 430258: Green Lane-Shanklin
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Shanklin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 Colwell Road, Freshwater, Isle Of Wight
27 April — 04 May
Delays unlikely Traffic control (give & take)
Works location: Freshwater: From Junction With Colwell Lane To Junction With The Avenue, 230m, Ml 620002: Colwell Road-Freshwater
Works description: Footway Re-Construction And Surfacing (Fwl : Bit 50% Partrecon Fwr : Bit Partrecon) Freshwater
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 Tennyson Road, Yarmouth, Isle Of Wight
27 April — 29 April
Delays unlikely Some carriageway incursion
Works location: Bay Tree House, Tennyson Rd
Works description: – Remedial Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Apse Manor Road, Shanklin, Isle Of Wight
26 April — 28 April
Delays unlikely Some carriageway incursion
Works location: Aspen Cottage, Apse Manor Rd, Shanklin
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

B3320 Bridge Road, Cowes, Isle Of Wight
27 April — 29 April
Delays unlikely Some carriageway incursion
Works location: 2 Bridge Rd Cowes
Works description: – Replace Cover And Frame In Footway
Responsibility for works: Southern Water
Current status: Advanced planning

B3325 Terminus Road, Cowes, Isle Of Wight
27 April — 03 May
Delays unlikely Some carriageway incursion
Works location: 2a Terminus Road.
Works description: Scaffolding
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3401 High Street, Carisbrooke, Isle Of Wight
27 April — 29 April
Delays unlikely No carriageway incursion
Works location: S/O 198 Carisbrooke Road On, High Street
Works description: Install 1m Of 3 Poly Ducts In Footway,Provide 3 Core Drill(S) Into Jointbox Or Building
Responsibility for works: BT
Current status: Advanced planning

Atherley Road, Shanklin, Isle Of Wight
26 April — 28 April
Delays unlikely Some carriageway incursion
Works location: 22 Atherley Road , Shanklin, Isle Of Wight.
Works description: – Disconnect Supply
Responsibility for works: Southern Water
Current status: Advanced planning

Priory Road, Carisbrooke, Isle Of Wight
26 April — 28 April
Delays unlikely No carriageway incursion
Works location: S/O 72 High Street To Opp 2, Priory Road
Works description: Install 25m Of 1 Way Poly Duct In Footway,Provide 1 Core Drill(S) Into Jointbox Or Building
Responsibility for works: BT
Current status: Advanced planning

Carisbrooke High, Newport, Isle Of Wight
26 April — 09 May
Delays unlikely Some carriageway incursion
Works location: Newport: Opposite The Car Park In The High Street (Ml 210098): Opp Co-Op Pelican
Works description: Replacement Of Traffic Signals Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Castle Street, Carisbrooke, Isle Of Wight
27 April — 29 April
Delays unlikely Some carriageway incursion
Works location: 15 Castle Street, Newport, Isle Of Wight.
Works description: – Install New Water Connection
Responsibility for works: Southern Water
Current status: Advanced planning

Cliff Road, Totland, Isle Of Wight
27 April — 28 April
Delays unlikely No carriageway incursion
Works location: In Tarmac Outside Greywood Crossing Carriageway To Outside Hatherwood , Cliff Road
Works description: Remedial Reinstatement To Rectify The Tarmac In The Fw As Sunk And Causing Trip Hazards. To Replace Two Kerbs
Responsibility for works: BT
Current status: Advanced planning

Enterprise Way, Cowes, Isle Of Wight
26 April — 10 May
Delays unlikely Traffic control (give & take)
Works location: Cowes: At The Junction Of Newport Road & Enterprise Way (Ml 110003):
Works description: Replacement Of N� 2 Signs (2 X No Entry) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Maxted Close, Cowes, Isle Of Wight
26 April — 10 May
Delays unlikely No carriageway incursion
Works location: Adj To 20 Maxted Close
Works description: Excavate In Verge And Footway For New Electric Supply
Responsibility for works: Southern Electric
Current status: Advanced planning

Shamblers Road, Cowes, Isle Of Wight
26 April — 29 April
Delays unlikely Traffic control (give & take)
Works location: Cowes: From Junction With St Faiths Road To Mill Hill Road, 256m, Ml 140200: Shamblers Road-Cowes
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Spring Walk, Newport, Isle Of Wight
27 April — 04 May
Delays unlikely Traffic control (give & take)
Works location: Newport: Whole Length Of Road From Junction With Gunville Road, 220m, Ml 240248: Spring Walk-Newport
Works description: Footway Re-Construction And Surfacing (Fwl : Bit Partrecon Fwr : Bit Partrecon) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Sylvan Avenue, East Cowes, Isle Of Wight
26 April — 28 April
Delays unlikely Traffic control (give & take)
Works location: East Cowes: From John Nash Avenue To Birch Close (Ml 140287): Sylvan Avenue-East Cowes
Works description: Footway Reconstruction And Surfacing (Fwl: Bit Partrecon Fwr: Bit Partrecon) East Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Warwick Street, Ryde, Isle Of Wight
27 April — 06 May
Delays unlikely Some carriageway incursion
Works location: Outside No 31
Works description: Lay New Service From Nearside Carriageway To Site
Responsibility for works: SGN
Current status: Advanced planning

West Street, Ventnor, Isle Of Wight
27 April — 11 May
Delays unlikely Traffic control (give & take)
Works location: From Adj 2 To O/S 25
Works description: Excavation Of Cable Trench In Footway For New Electrical Connection To New Property. Backfill And Reinstate.
Responsibility for works: Southern Electric
Current status: Advanced planning