Isle of Wight road closures and road works: 10th October 2013
A3055 Church Road, Shanklin, Isle Of Wight
11 October — 15 October
Delays likely Traffic control (two-way signals)
Works location: O/S 8 Church Road Shanklin
Works description: Replace 1 Jointbox Frame And Cover(S) (2285mm X 680mm) In Carriageway
Responsibility for works: BT
A3055 Sandown Road, Lake, Isle Of Wight
10 October — 17 October
Delays likely Road closure
Works location: Lake: From Cemetery Road 250m South (Ml410040): Sandown Road-Lake
Works description: Carriageway Reconstruction, Planing And Resurfacing.
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Pallance Lane, Northwood, Isle Of Wight
10 October — 16 October
Delays likely Road closure
Works location: Northwood: From Wyatts Lane 370m West (Ml140279): Pallance Lane-Northwood
Works description: Carriageway Reconstruction, Planing And Resurfacing.
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
A3055 Afton Road, Freshwater, Isle Of Wight
10 October — 14 October
Delays possible Traffic control (two-way signals)
Works location: Freshwater: Outside “The Deyne” Afton Road.: Afton Road-Freshwater
Works description: Install 25 Lin M Of 150mm Diameter Land Drain (Pourous) Wrapped In Terram And Bedded And Surrounded With Pea Shingle In The Verge Across The Frontage Of ‘The Deyne’ And Connect To Existing Gully At Boundary Of ‘Wight Haven’. Reinstate Verge (Grass Seeding
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
A3055 Leeson Road, Ventnor, Isle Of Wight
10 October — 10 October
Delays possible Traffic control (Stop/Go boards)
Works location: Ventnor: Outside 1seaglen Leeson Road .: Leeson Road-Ventnor
Works description: Repair C/W Pothole 300x 300 X 30 Mm Depth But Is Within A Former Repair Right On The Wheel Track On Bend Up Hill.
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
A3055 Military Road, Brighstone, Isle Of Wight
10 October — 14 October
Delays possible Traffic control (two-way signals)
Works location: Brighstone: At Edge Of West Bound Carriageway Of Military Road, Between Lower Sutton Farm And Marsh Green Farm.:
Works description: Edge Of Carriageway Defect, 5.2metres X 130mm X 55mm, Tm=Gandt . (Cw: Pothole) Responsibility for works: Island Roads on behalf of the Isle of Wight Council
A3055 Military Road, Freshwater, Isle Of Wight
10 October — 14 October
Delays possible Traffic control (multi-way signals)
Works location: Freshwater: Military Road, Brook, By Junction Of Chine Road: Military Road-Freshwater
Works description: Defective Repair To Concrete Carriageway Needs A Concrete Patch 1.5mx1m . Tm=Two Way Lights (Cw: Pothole)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
A3055 Military Road, Freshwater, Isle Of Wight
10 October — 14 October
Delays possible Traffic control (multi-way signals)
Works location: Freshwater: 70metres Leading Up To The Traffic Lights At Brook Bay On The Military Road Coming From Freshwater. All Fiv
Works description: Five Potholes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Broadway Crescent, Binstead, Isle Of Wight
11 October — 11 October
Delays possible Traffic control (Stop/Go boards)
Works location: Binstead: Opp No 120:
Works description: Concrete Repair 6.6sqm. Tm=2 Way Traffic Lights (Cw: Pothole) Binste
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Bullys Hill, Brading, Isle Of Wight
10 October — 11 October
Delays possible Traffic control (two-way signals)
Works location: Brading: Between The Mall To Just Past Property Called: Bullys Hill-Brading – 1754
Works description: Empty And Flush Gullies. Pre Cip Planned Works. Tm – 2 Way Lights (2 Days).
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Whitecross Lane, Lake, Isle Of Wight
11 October — 15 October
Delays possible Traffic control (two-way signals)
Works location: O/S Lansdowne On Whitecross Lane, Lake, Po36 9pg, Whitecross Lane
Works description: Replace 1 Jointbox Frame And Cover(S) (2285mm X 680mm) In Carriageway
Responsibility for works: BT