Isle of Wight roadworks starting today or tomorrow.
A3020 High Street, Godshill, Isle Of Wight
30 October — 31 October
Delays likely Traffic control (two-way signals)
Works location: Godshill: O/S Hair Design: High Street-Godshill
Works description: Repair C/W Depression. Patch 2x7m. Total 14sqm. Tm=Two Way Temp Lights (Cw: Pothole) Godshi
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
A3020 High Street, Godshill, Isle Of Wight
30 October — 31 October
Delays likely Traffic control (two-way signals)
Works location: O/S Stone Cross Cottage High Street Godshill Isle Of Wight Po38 3hz
Works description: Access Required To Underground Bt Structure To Restore Service – No Structural Changes – Highway Will Be Unaffected. Work Being Carried Out On Existing Bt Plant
Responsibility for works: BT
A3021/A3054 Whippingham Road, East Cowes, Isle Of Wight
30 October — 12 November
Delays likely Traffic control (give & take)
Works location: East Cowes: From Crossways, South To The Racecourse (Ml 110013, 110015, 110016, 110017, 110018):
Works description: Install No 30 Lanterns (No 13 Columns) 8 X 40mph Signs, 1 No Waiting Sign, 2 Route/Direction Signs, 5 Warning Signs And 2 Lit Vehicle Speed Activation Signs East C
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
A3054 Lind Street, Ryde, Isle Of Wight
30 October — 02 November
Delays likely Road closure
Works location: Ryde: From West Street To High Street (Ml310025): Lind Street-Ryde
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H1, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Rural:H1) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
A3054 Lushington Hill, Newport, Isle Of Wight
30 October — 01 November
Delays likely Traffic control (two-way signals)
Works location: O/S 21, Lushington Hill
Works description: Replace 1 Jointbox Frame And Cover(S) (2285mm X 680mm) In Carriageway
Responsibility for works: BT
A3054 Quarr Hill, Binstead, Isle Of Wight
30 October — 31 October
Delays likely Traffic control (two-way signals)
Works location: Binstead: Next To Lamp Col 45 .Footway Tarmac Is Breaking Up Into Fissures. Some Are 3 Cms Wide.: Quarr Hill-Binstead
Works description: Repair Footway Rut Binste
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
A3055 High Street, Brading, Isle Of Wight
31 October — 04 November
Delays likely Traffic control (Stop/Go boards)
Works location: Brading: Near Door To Number 65: High Street-Brading
Works description: Surface Around Side Entry Gully Breaking Up. Needs Rebedding. Measures 900 X 600 Mm With Grille In Centre. T M Will Require Stop Go Boards. (Cw: Pothole) Bradin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
B3328 Chine Avenue, Shanklin, Isle Of Wight
31 October — 31 October
Delays likely Road closure
Works location: Shanklin: From Queens Road To The High Street (Ml430088): Chine Avenue-Shanklin
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Shankl
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Whitcombe Road, Newport, Isle Of Wight
31 October — 04 November
Delays likely Road closure
Works location: Newport: From Castle Hill Heading South To Industrial Estate, For Approximately 420m (Ml 230122): Whitcombe Road-Newport
Works description: Carriageway Reconstruction, Planing And Surfacing
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
A3020 Newport Road, Cowes, Isle Of Wight
31 October — 01 November
Delays possible
Works location: Cowes: O/S 137 And 139 Newport Road, Cowes (Service Road):
Works description: Patch 3 Areas F/W: 1.7×1.0m, 2.1×0.85m And 1.75×0.95m. Standard F/W Tm. Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
A3054 Kite Hill, Wootton, Isle Of Wight
31 October — 01 November
Delays possible Traffic control (two-way signals)
Works location: Junction Of The Boltons And The Boltons Wootton Isle Of Wight Po33 4le
Works description: Access Required To Underground Bt Structure To Restore Service – No Structural Changes – Highway Will Be Unaffected. Work Being Carried Out On Existing Bt Plant
Responsibility for works: BT
A3055 Afton Road, Freshwater, Isle Of Wight
30 October — 01 November
Delays possible Traffic control (two-way signals)
Works location: Freshwater: Outside “The Deyne” Afton Road.: Afton Road-Freshwater
Works description: Install 25 Lin M Of 150mm Diameter Land Drain (Pourous) Wrapped In Terram And Bedded And Surrounded With Pea Shingle In The Verge Across The Frontage Of ‘The Deyne’ And Connect To Existing Gully At Boundary Of ‘Wight Haven’. Reinstate Verge (Grass Seeding
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
A3055 Leeson Road, Ventnor, Isle Of Wight
30 October — 31 October
Delays possible Traffic control (two-way signals)
Works location: Ventnor: Outside No 1 Leeson Rd: Leeson Road-Ventnor
Works description: Repair C/Way Patch 3.6m2. Tm=Traffic Lights. (Cw: Pothole) Responsibility for works: Island Roads on behalf of the Isle of Wight Council
B3340 Steyne Road, Seaview, Isle Of Wight
30 October — 31 October
Delays possible Traffic control (two-way signals)
Works location: Seaview: Middle Of The Road, Steyne Road, Seaview.By Lamp Col 1.: Steyne Road-Seaview
Works description: Perm Repairs Of Patch Breaking Up Tm . Give And Take (Cw: Pothole)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
High Street, Whitwell, Isle Of Wight
30 October — 01 November
Delays possible Traffic control (two-way signals)
Works location: Whitwell: O/S Meadowside: High Street-Whitwell
Works description: Patch 5sqm. Several Potholes Up To 35mm Depth. Tm=Two Way Lights. (Cw: Pothole) Whitwe
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Upton Road, Ryde, Isle Of Wight
31 October — 08 November
Delays possible Traffic control (two-way signals)
Works location: Os No. 286
Works description: Lay New Service From Main In Nearside Carriageway To Site
Responsibility for works: Southern Gas Networks Plc
Coach Lane, Brading, Isle Of Wight
31 October — 04 November
Delays possible Traffic control (Stop/Go boards)
Works location: Brading: 35 Metres East Of Doctors Lane.: Coach Lane-Brading
Works description: Pothole 450 X 300 X 50mm Depth. Tm Will Require Stop Go Boards As On A Fast Bend.
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Oxford Street, Northwood, Isle Of Wight
31 October — 04 November
Delays possible Traffic control (two-way signals)
Works location: Northwood: (Ml-140275) C/Way Reinstatement At Junc. With Newport Rd. Gully Replacement Opposite Junc. Near Bus Stop. Cha
Works description: Reinstate 4m X 0.3m Strip In Carriageway Channel Along Kerb Leading To Side Gully. Replace 1no Gully. Raise 2m Length Of Channel Blocks To Correct Level.
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
St Thomas Street, Ryde, Isle Of Wight
30 October — 31 October
Delays possible Traffic control (two-way signals)
Works location: Ryde: Os Number 14 A Centre Of Road: St Thomas Street-Ryde
Works description: Pothole 300 X 300 X 45 Mm Depth. Tm – In Centre Of Busy Road On A Hill And Bend. Will Need Give And Take. (Cw: Pothole) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Image: functoruser under CC BY 2.0