Road Closed

Road closures and road works: 4th November 2013

Isle of Wight road works starting today or tomorrow.

A3054 Bouldnor Road, Yarmouth, Shalfleet, Isle Of Wight
04 November — 30 April 2014
Delays likely Traffic control (two-way signals)
Works location: Shalfleet: Bouldnor Road, From View Point Car Park Heading West For 700m (Ml 610022, 610021, 610020, 610019): Bouldnor R
Works description: Geotechnical Scheme – Sheet Pile Wall And Soil Nailing Along Carriageway Edge
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

A3054 Racecourse, Newport, Isle Of Wight
04 November — 15 November
Delays likely Traffic control (give & take)
Works location: Newport: From Whippingham Road, South Then West To Binfield Corner (Ml 210055 And 210056):
Works description: Install No 19 Lanterns (No 14 X 8m Columns) 1 X 40mph Sign And 5 Warning Signs
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

A3055 Marlborough Road, Ryde, Isle Of Wight
04 November — 15 November
Delays likely Traffic control (give & take)
Works location: Ryde: From Appley Road, South To Brading Road (Ml 310051, 310052, 310053, 310054, 310055):
Works description: Install No 26 Lanterns ( No 25 X 8m Columns) 5 Bus Stops, 1 Route/Direction Sign, 4 Warning Signs, 1 Lit Vehicle Activation Sign And 1 Large Lit Vehicle Activation Sign Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

B3328 Chine Avenue, Shanklin, Isle Of Wight
05 November — 07 November
Delays likely Road closure
Works location: Shanklin: From Queens Road To The High Street (Ml430088): Chine Avenue-Shanklin
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Shankl
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

B3341 Medina Avenue, Newport, Isle Of Wight
05 November — 12 November
Delays likely Road closure
Works location: Newport: From York Road To Trafalgar Road (Ml210082): Medina Avenue-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H1, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Urban:H1)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

B3401 Whitepit Lane, Newport, Isle Of Wight
05 November — 11 November
Delays likely Road closure
Works location: Newport: From Watergate Road To Elm Grove (Ml 230103): Whitepit Lane-Newport
Works description: Carriageway Reconstruction, Planing And Surfacing (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Budbridge Lane, Arreton, Isle Of Wight
04 November — 05 November
Delays likely Road closure
Works location: Arreton: Budbridge Lane 250m South Of Bury Lane, Off East Lane, Merstone:
Works description: Supply Reinforced Metal Plate (Approx 3m X 6m). Overlay With 10mm, Maximum Of 200mm Of Carriageway Construction. Arreto
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Riboleau Street, Ryde, Isle Of Wight
04 November — 18 November
Delays likely Road closure
Works location: Adj 25 Riboleau St
Works description: Excavate In Road And In Footway For A New Supply
Responsibility for works: Southern Electric

A3020/A3054 Parkhurst Road, Newport, Isle Of Wight
05 November — 07 November
Delays possible
Works location: 449197 090864 Approx 35m South Of Jnc Partridge Road, Newport , Parkhurst Road
Works description: Replace 1 Existing Pole 0.5m X 0.5m
Responsibility for works: BT

A3055 Leeson Road, Ventnor, Isle Of Wight
05 November — 06 November
Delays possible Traffic control (two-way signals)
Works location: Ventnor: O/S 62: Leeson Road-Ventnor
Works description: Raise And Reset Sunken Gully Frame / Cover. Tm=Two Way Lights. No Waiting Cones May Be Required (Gl: Ironwork Rocking/Corrosion)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Kemming Road, Whitwell, Isle Of Wight
04 November — 06 November
Delays possible Traffic control (Stop/Go boards)
Works location: Whitwell: Near Entrance To Little Garth: Kemming Road-Whitwell
Works description: Pothole Centre Of C/Way. 600 X300 X 65mm Depth. Tm -Tricky Position.. Will Require Stop Go. (Cw: Pothole)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Gills Cliff Road, Ventnor, Isle Of Wight
04 November — 05 November
Delays possible Traffic control (Stop/Go boards)
Works location: Ventnor: Outside. Number 9.Gills Cliff Road.: O/S No 36
Works description: Pothole 400x 400x 50mm Depth. Centre Of C/W. Tm Will Need Stop Go. (Cw: Pothole)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Regent Street, Shanklin, Isle Of Wight
05 November — 05 November
Delays possible Traffic control (Stop/Go boards)
Works location: Shanklin: Rear Of Police Station: Regent Street-Shanklin
Works description: Area 5.4×3.95x90mm Dip. Police Cones And Priority Boards Needed Got Cut Chase And Regulate Cw With 10mmdbm
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Chapel Street, Newport, Isle Of Wight
04 November — 06 November
Delays possible Traffic control (Stop/Go boards)
Works location: Newport: Various Locations In Chapel Street: Chapel Street-Newport
Works description: Take Down And Make Safe Electrical Illuminated Sign. Please Call Mark Dawson To Site Prior To Starting Work.
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

West Lane, Brading, Isle Of Wight
04 November — 05 November
Delays possible Traffic control (two-way signals)
Works location: Brading: Opp Jct Doctors Lane: West Lane-Brading
Works description: Supply New Gully Frame And Cover And Install To Level. Tm=2 Way Traffic Lights
Responsibility for works: Island Roads on behalf of the Isle of Wight Council

Advertisement
Subscribe
Email updates?
2 Comments
oldest
newest most voted
Inline Feedbacks
View all comments