The following roads are closed due to the recent bad weather:
Cliff Path, Lake – Closed due to safety reasons
Hyde Road, Shanklin
Landguard Road/ Collingwood Road, Shanklin – Closed due to a collapsed area of road
Oakhill Road and The Duver, Seaview – Closed due to flooding
Rew Lane, Ventnor – Closed due to a poor surface
Works starting today or tomorrow.
Newport Rd, Niton is closed between Laceys Lane and Church Street until approx 4.30pm on 7 February for drainage works.
Main Road, Havenstreet is still closed (between Church Road and Speeds Lane) This work is scheduled to be completed on 22nd January.
Copse Lane, Freshwater will be closed again today until 18:30 & daily until approx 16/1/14 (weather permitting) for surfacing works.
Cockleton Lane, Gurnard will be closed again today until 18:30 and daily until approx 17/1/14 (weather permitting) for surfacing works.
There are temp traffic lights on Newport Rd, Northwood (at jct with Oxford St) until approx 4pm today for urgent gas repair works
A3020 High Street, Godshill, Isle Of Wight
15 January — 15 January
Delays likely Traffic control (two-way signals)
Works location: Outside 1 Chapel View Cottages High Street Godshill Isle Of Wight Po38 3hz
Works description: Access Required To Underground Bt Structure To Restore Service – No Structural Changes – Highway Will Be Unaffected. Work Being Carried Out On Existing Bt Plant
Responsibility for works: BT
A3021/A3054 Whippingham Road, East Cowes, Isle Of Wight
14 January — 16 January
Delays likely Traffic control (Stop/Go boards)
Works location: East Cowes: O/S Priory School, North-Bound Lane: Whippingham Road-East Cowes
Works description: Patch C/W. 5.0×1.0m. Acute Longitudinal Level Difference 40mm. Beware Possible Shallow Electrical Cables. 800mm Yellow Letters. * Evening Work? (Cw: Pothole) East C
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
A3021/A3054 Whippingham Road, East Cowes, Isle Of Wight
15 January — 17 January
Delays likely Traffic control (give & take)
Works location: East Cowes: Bus Stop Opp The Spar: Whippingham Road-East Cowes
Works description: Idr Make Safe Pothole F/W 1000x300x35mm. Tm=Basic Chpt 8. East C
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Spring Hill, Ventnor, Isle Of Wight
14 January — 17 January
Delays likely Road closure
Works location: Ventnor: From High Street To St Boniface Road (Ml 530152): Spring Hill-Ventnor
Works description: Carriageway Reconstruction, Planing And Resurfacing.(Ff-Stren110:U/H3,Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Ashey Road, Ryde, Isle Of Wight
15 January — 24 January
Delays likely Road closure
Works location: Ryde: From Green Lane To The Ponderosa (Ml320219): Ashey Road-Ryde
Works description: Carriageway Reconstruction, Planing And Resurfacing.Night Work.(Ff-Stren100:R/H2,Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Rural:H2) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
West Hill Road, Ryde, Isle Of Wight
15 January — 22 January
Delays likely Road closure
Works location: Ryde: Westhill Rd, South Of Junction With Park Road, Ryde.: West Hill Road
Works description: Excavate 5lmt (Approx 2m Deep), Dig Out Saturated Clay, Rep[Air Suspected Damaged 9″ Pipe, Back Fill With Type 1 Tarmac With Patch, Repair Broken Kerbs (Shutering Required), Call Engineer To Site (Gs) When Hole Is Excavated, Also Contact Engineer If Job P
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
A3021 York Avenue, East Cowes, Isle Of Wight
14 January — 16 January
Delays possible Traffic control (Stop/Go boards)
Works location: East Cowes: O/S 202, Opp 203 (Near Entrance To Osborne House), E Cowes:
Works description: Patch Depression. Area Approx 14.2 X 1.8m. (Cw: Pothole) East C
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
B3330 Upper Green Road, St Helens, Isle Of Wight
14 January — 27 January
Delays possible Traffic control (multi-way signals)
Works location: Junc Of Guildford Road And Upper Green Road
Works description: Excavate A Jointbay In The Road At The Base Of The Pole To Replace The Existing
Responsibility for works: Southern Electric
Newnham Lane, Binstead, Isle Of Wight
14 January — 22 January
Delays possible Traffic control (two-way signals)
Works location: Os No. 21
Works description: Lay New Service From Main In Nearside Carriageway To Site
Responsibility for works: Southern Gas Networks Plc
Image: Hills_Alive under CC BY 2.0