Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org
Roadworks
A3020/A3054 Parkhurst Road, Newport, Isle Of Wight
10 April — 10 July
Delays likely Road closure
Works location: Newport: From Forest Road To St Marys Roundabout (Ml 210046): Parkhurst Road-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M-Mcp:U/H1, Resurface 25mm Ul-M 65psv Channel Plane-Urban:H1) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3020/A3054 Parkhurst Road, Newport, Isle Of Wight
10 April — 10 July
Delays likely Road closure
Works location: Newport: From Catherine Terrace To St Marys Roundabout (Ml 220146): Parkhurst Road-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:U/H2, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Urban:H2) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3020 Medina Way, Newport, Isle Of Wight
10 April — 10 July
Delays likely Road closure
Works location: Newport: Northbound C/Way-From 290m North Of Coppins Bridge A Further 300m North (Ml 210009): Medina Way-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:U/H1, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Urban:H1) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3020 Medina Way, Newport, Isle Of Wight
10 April — 10 July
Delays likely Road closure
Works location: Newport: Northbound C/Way-From Coppins Bridge 290m North (Ml 210008): Medina Way-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:U/H1, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed+Inlay/Unkerbed=Overlay)-Urban:H1) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3020 Mill Hill Road, Cowes, Isle Of Wight
10 April — 10 July
Delays likely Road closure
Works location: Cowes: From Newport Road To Birmingham Road (Ml 110009): Mill Hill Road-Cowes
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Fc-Ul-M&Flexi:R/H1, Resurface 40mm Ul-M 65psv (Kerbed=Inlay/Unkerbed=Overlay) With Flexiplast System-Rural:H1) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3054 Fairlee Road, Newport, Isle Of Wight
10 April — 10 July
Delays likely Road closure
Works location: Newport: From Seaclose To Halberry Lane (Ml 210049): Fairlee Road-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H1 Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Urban:H1) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3054 Forest Road, Newport, Isle Of Wight
10 April — 10 July
Delays likely Road closure
Works location: Newport: From Betty Haunt Lane 370m East (Ml 210036): Forest Road-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1 Resurface 25mm Ul-M 65psv Channel Palne-Urban:H1) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3054 Forest Road, Newport, Isle Of Wight
10 April — 10 July
Delays likely Road closure
Works location: Newport: From Poleclose Lane To Gunville Road (Ml 210039): Forest Road-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1 Resurface 25mm Ul-M 65psv Channel Plane-Urban:H1) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3054 Forest Road, Newport, Isle Of Wight
10 April — 10 July
Delays likely Road closure
Works location: Newport: From Gunville Road East (Ml 210040): Forest Road-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1 Resurface 25mm Ul-M 65psv Channel Plane-Urban:H1) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3054 Forest Road, Newport, Isle Of Wight
10 April — 10 July
Delays likely Road closure
Works location: Newport: From 370m East Of Betty Haunt Lane A Further 190m East (Ml 210037): Forest Road-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1 Resurface 25mm Ul-M 65psv Channel Palne-Urban:H1) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3054 Forest Road, Newport, Isle Of Wight
10 April — 10 July
Delays likely Road closure
Works location: Newport: From 410m East Of Gunvile Road A Further 270m East (Ml 210041): Forest Road-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1 Resurface 25mm Ul-M 65psv Channel Plane-Urban:H1) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3054 Forest Road, Newport, Isle Of Wight
10 April — 10 July
Delays likely Road closure
Works location: Newport: From Argyle Road To Parkhurst Road (Ml 210045): Forest Road-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1 Resurface 25mm Ul-M 65psv Channel Plane-Urban:H1) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3054 Forest Road, Newport, Isle Of Wight
10 April — 10 July
Delays likely Road closure
Works location: Newport: From 910m East Of Unville Road A Further 280m East (Ml 210043): Forest Road-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1 Resurface 25mm Ul-M 65psv Channel Plane-Urban:H1) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3054 Forest Road, Newport, Isle Of Wight
10 April — 10 July
Delays likely Road closure
Works location: Newport: From 560m East Of Betty Haunt Lane To Poleclose Lane (Ml 210038): Forest Road-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1 Resurface 25mm Ul-M 65psv Channel Palne-Urban:H1) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3054 Forest Road, Newport, Isle Of Wight
10 April — 10 July
Delays likely Road closure
Works location: Newport: From 680m East Of Gunville Road A Further 230m East (Ml 210042): Forest Road-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1 Resurface 25mm Ul-M 65psv Channel Plane-Urban:H1) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3055 Esplanade, Ryde, Isle Of Wight
09 April — 09 June
Delays likely Road closure
Works location: Ryde: Westbound C/Way-From Union Street To Dover Street (Ml 310062): Esplanade-Ryde
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Cc-Ul-M&Flexi&5%Recon:U/H1, Resurface 40mm Ul-M 65psv With Flexiplast System & 5% Reconscruction-Urban:H1) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3323 Pyle Street, Newport, Isle Of Wight
10 April — 10 July
Delays likely Road closure
Works location: Newport: From Town Lane To East Street (Ml 230147): Pyle Street-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Br-Stren:R/H3,Barell Cambered Roads – F1 – 100mm Channel Strengthen, Shaping And 30mm Fibrovia Surfac Course Overlay) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3326 Monkton Street, Ryde, Isle Of Wight
09 April — 15 May
Delays likely Road closure
Works location: From Simeon Street To The Strand, Monkton Street, Ryde, Isle Of Wight.
Works description: – Flood Alleviation Scheme From Simeon Street To The Strand.
Responsibility for works: Southern Water
Current status: Advanced planning
Brooklands Road, Cowes, Isle Of Wight
10 April — 10 July
Delays likely Road closure
Works location: Cowes: From Park Road To Moorgreen Road (Ml 140176): Brooklands Road-Cowes
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4 F1-Strengthen 30mm Firbrovia And 70mm Foambase-Urban:H4) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Pallance Road, Northwood, Isle Of Wight
09 April — 23 June
Delays likely Road closure
Works location: Northwood: From 490m East Of Pallance Lane To Wyatts Lane (Ml130057): Pallance Road-Northwood
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Northwood
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Pallance Road, Northwood, Isle Of Wight
09 April — 23 June
Delays likely Road closure
Works location: Northwood: From Pallance Lane 250m East Thereof (Ml130055): Pallance Road-Northwood:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H3, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural: H3) Northw
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Pallance Road, Northwood, Isle Of Wight
09 April — 23 June
Delays likely Road closure
Works location: Northwood: From Place Road To Wyatts Lane (Ml130058): Pallance Road-Northwood:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Northw
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Pallance Road, Northwood, Isle Of Wight
09 April — 23 June
Delays likely Road closure
Works location: Northwood: From 240m East Of Rew Street To Pallance Lane (Ml130054): Pallance Road-Northwood
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Northwood
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Pallance Road, Northwood, Isle Of Wight
09 April — 23 June
Delays likely Road closure
Works location: Northwood: Frpm Rew Street 240m East (Ml130053): Pallance Road-Northwood
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Northwood
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Pallance Road, Northwood, Isle Of Wight
09 April — 23 June
Delays likely Road closure
Works location: Northwood: From 250m East Of Pallance Lane A Further 240m East (Ml130056): Pallance Road-Northwood
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Cc-Ul-M&Flexi&5%Recon:R/H3, Resurface 40mm Ul-M 65psv With Flexiplast System & 5% Reconstruction-Rural:H3 Northwood
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Cockleton Lane, Gurnard, Isle Of Wight
10 April — 10 July
Delays likely Road closure
Works location: Gurnard: From Hilton Road To Bay View Road (Ml130071) : Cockleton Lane-Gurnard:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Gurnar
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Gunville Road, Carisbrooke, Isle Of Wight
10 April — 10 July
Delays likely Road closure
Works location: Carisbrooke: From Alvington Manor View To Gunville West (Ml 220129): Gunville Road-Carisbrooke
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren150:U/H2 Strengthen 25mm Ul-M 65psv And 125mm Hdm50-Urban:H2) Carisbrooke
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Priory Road, Carisbrooke, Isle Of Wight
10 April — 10 July
Delays likely Road closure
Works location: Carisbrooke: From High Street To School Lane (Ml 240165): Priory Road-Carisbrooke
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Carisbrooke
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Station Road, Wootton, Isle Of Wight
09 April — 09 July
Delays likely Road closure
Works location: Wootton: From High Street 210m South (Ml 320174): Station Road-Wootton
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren150:U/H2, Strengthen 25mm Ul-M 65psv And 125mm Hdm50-Urban:H2) Wootton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Station Road, Wootton, Isle Of Wight
09 April — 09 July
Delays likely Road closure
Works location: Wootton: From Park View To Glendale Close (Ml 320172): Station Road-Wootton
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H2, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Urban:H2) Wootton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Station Road, Wootton, Isle Of Wight
09 April — 09 July
Delays likely Road closure
Works location: Wootton: From Glendale Close 370m Northeast (Ml 320173): Station Road-Wootton
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H2, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Urban:H2) Wootton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Station Road, Wootton, Isle Of Wight
09 April — 09 July
Delays likely Road closure
Works location: Wootton: From Park View 210m Southwest (Ml320171): Station Road-Wootton
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H2, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Urban:H2) Wootton
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Victoria Road, Cowes, Isle Of Wight
10 April — 10 July
Delays likely Road closure
Works location: Cowes: From St Marys Road To Park Road (Ml 130086): Victoria Road-Cowes
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:Uh3,Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Hunnyhill, Newport, Isle Of Wight
10 April — 10 July
Delays likely Road closure
Works location: Newport: From Crocker Street To Heytesbury Road (Ml 220144): Hunnyhill-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Cc-Ul-M&Flexi&30%Recon:U/H2, F1-Resurface 40mm Ul-M 65psv With Flexiplast System & 30% Reconstruction-Urban:H2) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Hunnyhill, Newport, Isle Of Wight
10 April — 10 July
Delays likely Road closure
Works location: Newport: From Heytesbury Road To Catherine Terrace (220145): Hunnyhill-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Cc-Ul-M&Flexi&30%Recon:U/H2, F1-Resurface 40mm Ul-M 65psv With Flexiplast System & 30% Reconstruction-Urban:H2) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Little London, Newport, Isle Of Wight
10 April — 10 July
Delays likely Road closure
Works location: Newport: From Sea Street To 290m North (Ml 240282): Little London-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:U/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Urban:H3) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Little London, Newport, Isle Of Wight
10 April — 10 July
Delays likely Road closure
Works location: Newport: From 290m North Of Sea Street To Hurstake Road (Ml 240283): Little London-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1 Strengthen 30mm Fibrovia And 70mm Foambase-Rban:H4) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Mayfield Road, East Cowes, Isle Of Wight
10 April — 10 July
Delays likely Road closure
Works location: East Cowes: From Oakfield Oad To Victoria Grove (Ml 141256): Mayfield Road-East Cowes
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1 Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) East Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Sandy Lane, Newport, Isle Of Wight
10 April — 10 July
Delays likely Road closure
Works location: Newport: From Marvel Lane 190m East (Ml 240300): Sandy Lane-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Fibrovia:R/H4, Resurface 30mm Fibrovia Plus Regulating/Patching (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H4) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Sandy Lane, Newport, Isle Of Wight
10 April — 10 July
Delays likely Road closure
Works location: Newport: From Blackwater Road 220m North West (Ml 240299): Sandy Lane-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Fibrovia:R/H4,Resurface 30mm Fibrovia Plus Regulating/Patching (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H4) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Sandy Lane, Newport, Isle Of Wight
10 April — 10 July
Delays likely Road closure
Works location: Newport: From Whitcombe Road 405m North East (Ml 240303): Sandy Lane-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-M:R/H3, Resurface 25mm Ul-M 65psv Plus Regulating (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H3) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Watergate Road, Newport, Isle Of Wight
10 April — 10 July
Delays likely Road closure
Works location: Newport: From 250m South Of Shide Road A Further 250m South (Ml240289): Watergate Road-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Br-Stren:R/H4,V) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Watergate Road, Newport, Isle Of Wight
10 April — 10 July
Delays likely Road closure
Works location: Newport: From Shide Road 240m South (Ml 240288): Watergate Road-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Br-Stren:R/H4,V) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3054 High Street, Wootton, Isle Of Wight
09 April — 13 April
Delays possible Some carriageway incursion
Works location: 80, High St, Wootton Bridge, Ryde
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning
A3056 Newport Road, Apse Heath, Isle Of Wight
09 April — 10 April
Delays possible Traffic control (two-way signals)
Works location: Apse Heath: O/S Bramley Cottage.: Newport Road-Apse Heath
Works description: Infill C/W Pothole 2×0.4x40mm Tm Stop/Go Apse Heath
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3330 St Johns Road, Ryde, Isle Of Wight
09 April — 13 April
Delays possible Some carriageway incursion
Works location: 113, St. Johns Rd, Ryde
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning
A3054 Forest Road, Newport, Isle Of Wight
10 April — 10 July
Delays unlikely Traffic control (give & take)
Works location: Newport: From 1190m East Of Gunville Road To Argyle Road (Ml 210044): Forest Road-Newport
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Ul-Mcp:U/H1 Resurface 25mm Ul-M 65psv Channel Plane-Urban:H1) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3340 Fairy Road, Seaview, Isle Of Wight
09 April — 13 April
Delays unlikely Some carriageway incursion
Works location: Cairnbrook, Fairy Rd, Seaview
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning
B3341 Castle Hill, Newport, Isle Of Wight
09 April — 22 April
Delays unlikely Traffic control (give & take)
Works location: Newport: From Castle Road, West To Junction Of Castle Lane (Ml 240085):
Works description: Install N? 4 Lanterns (N? 4 Columns) 1 Warning Sign & 1 Route/Direction Sign (Ml 240085) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3395 Steyne Road, Bembridge, Isle Of Wight
09 April — 13 April
Delays unlikely Some carriageway incursion
Works location: O/S 41-43 Steyne Road Bembridge
Works description: Provide New Pole To Provide Service To Customer
Responsibility for works: BT
Current status: Advanced planning