Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
Roadworks or road closures starting today or tomorrow.
A3020 Horsebridge Hill, Newport, Isle Of Wight
10 July — 23 July
Delays likely Traffic control (two-way signals)
Works location: Newport: From Parkhurst Road, North To Junction Of Stag Lane (Ml 210022, Ml 210023 And Ml 210024): :; Sl Cip Scheme Sl C
Works description: Install No 17 Lanterns (No 16 Columns) 8 40 Mph Signs, 10 Warning Signs And 2 Lit Speed Signs Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Paddock Road, Shanklin, Isle Of Wight
11 July — 11 August
Delays likely Road closure
Works location: Shanklin: From Highfield Road To Florence Road )Ml440280): Paddock Road-Shanklin:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff:Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Shankl
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Sibden Road, Shanklin, Isle Of Wight
11 July — 16 August
Delays likely Road closure
Works location: Shanklin: From Furze Hill Road 221m West (Ml441295): Sibden Road-Shanklin:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Shankl
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3020 Newport Road, Cowes, Isle Of Wight
10 July — 14 July
Delays possible Some carriageway incursion
Works location: 404 Newport Rd
Works description: Perm Reinstatement Of F/Way
Responsibility for works: Southern Water
Current status: Advanced planning
Appuldurcombe Road, Wroxall, Isle Of Wight
11 July — 14 July
Delays possible Traffic control (Stop/Go boards)
Works location: Wroxall: First 2are 10 Metres From One Entrance To Appuldurcombe Cottages And The Other 2 Are 2 And 10metres From The Ot
Works description: First , 2 Potholes -Both Measure 300×300 X55 Mm Depth. Plus 2 More 300x 200 X 65mmdepth. Will Need Stop Go On Narrow Lane. (Cw: Pothole) Wroxal
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3327 Clarence Road, Wroxall, Isle Of Wight
11 July — 14 July
Delays possible Traffic control (two-way signals)
Works location: Wroxall: About 100 Metres North Of Welcome To Ventnor Sign On Southbound Side.Large Area Of Delamination Marked Up. 1500
Works description: Overlay/ Make Safe Areas Of Delamination. Tm Will Need Stop Go.. Busy Fast Road. Bus Route. On Bend. Wroxal
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3327 Newport Road, Ventnor, Isle Of Wight
10 July — 23 July
Delays possible Traffic control (two-way signals)
Works location: Ventnor: From Ocean View Road, North To Last Light (Ml 520069, Ml 520070, Ml 520071 And Ml 540252): :; Sl Cip Scheme Sl
Works description: Install No 23 Lanterns ( No 14 Columns) 6 Bus Stops, 3 No Waiting Signs, 2 Route/Direction Signs And 2 Warning Signs Ventno
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3327 St Johns Road, Wroxall, Isle Of Wight
10 July — 10 July
Delays possible Traffic control (two-way signals)
Works location: Os Hazel Dene St Johns Road Wroxall Isle Of Wight Po38 3ef
Works description: Access Required To Underground Bt Structure To Restore Service – No Structural Changes – Highway Will Be Unaffected. Work Being Carried Out On Existing Bt Plant
Responsibility for works: BT
Current status: Advanced planning
B3399 Limerstone Road, Brighstone, Isle Of Wight
10 July — 11 July
Delays possible Traffic control (two-way signals)
Works location: Telegraph Pole Opposite Windymere Limerstone Road Brighstone Isle Of Wight Po30 4ae
Works description: Safe Access To Replace Decayed Telegraph Pole.
Responsibility for works: BT
Current status: Advanced planning
Blackbridge Road, Freshwater, Isle Of Wight
10 July — 11 July
Delays possible Traffic control (two-way signals)
Works location: Freshwater: Bridge Deck : Blackbridge- Freshwater—Unclassified Road Over – Blackbridge, Freshwater:; David Edmead
Works description: Trial Pits Are Required To Confirm Location And Depths Of Existing Services, The Catman Has Previousl Scanned And Marked Service Locations However Structures Gang Are To Scan And Confirm Prior To Excavations. Freshw
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning