Road works road closed signs

Roadworks and road closures: 11th December 2014

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

A3020/A3054 Parkhurst Road, Newport, Isle Of Wight
11 December — 15 December
Delays likely Traffic control (two-way signals)
Works location: Parkhurst Road From Horsebridge Hill To Hunnyhill
Works description: Access To Bt Boxes Required To Recover Redundant Cable.
Responsibility for works: BT
Current status: Advanced planning

A3020 High Street, Godshill, Isle Of Wight
11 December — 11 December
Delays likely Traffic control (two-way signals)
Works location: Outside Godshill Methodist Church High Street Godshill Isle Of Wight Po38 3hz
Works description: Access Required To Underground Bt Structure To Provide Service – No Structural Changes. Work Being Carried Out On Existing Bt Plantbetween 09.30 And 15.30hrs
Responsibility for works: BT
Current status: Advanced planning

A3020 Horsebridge Hill, Newport, Isle Of Wight
11 December — 15 December
Delays likely Traffic control (two-way signals)
Works location: Horsebrigde Hill From Cowes Road To Parkhurst Road
Works description: Access To Bt Boxes Required To Recover Redundant Cable.
Responsibility for works: BT
Current status: Advanced planning

A3055 Arthurs Hill, Shanklin, Isle Of Wight
12 December — 16 December
Delays likely Traffic control (multi-way signals)
Works location: Shanklin: From Hope Road, North To Junction Of Wilton Park Road (Ml 410036 And Ml 410037): :; Sl Cip Scheme Sl Cip Schem
Works description: Install No 11 Lanterns ( No 9 Columns) 1 Warning Sign, 2 Bus Stops, 2 Neighbourhood Watch Signs, 5 Route/Direction Signs And 1 Lit Vehicle Activation Sign Shankl
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3323 St James Street, Newport, Isle Of Wight
11 December — 15 December
Delays likely Traffic control (two-way signals)
Works location: St James Street From Hunnyhill To Crocker Street
Works description: Access To Bt Boxes Required To Recover Redundant Cable.
Responsibility for works: BT
Current status: Advanced planning

St Catherine Street, Ventnor, Isle Of Wight
11 December — 15 December
Delays likely Traffic control (convoy working)
Works location: Ventnor: From Victoria Street, East To Madeira Road (Ml 540176, 540264): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install No 11 Lanterns (No 9 Columns) 2 Route/Direction Signs, 1 Warning Sign Ventno
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3020 Victoria Avenue, Shanklin, Isle Of Wight
11 December — 15 December
Delays possible Traffic control (two-way signals)
Works location: Cliff Bridge To Victoria Avenue/St Johns Road
Works description: Access To Bt Boxes Required To Recover Redundant Cable. 2 Way Rolling Traffic Lights Will Be Required. Pedestrian Barriers Will Be Used Where Applicable. Work Will Take Place Between 09:30 And 15:30hrs. No Work Will Take Place At Bus Stops Or Junctions. No Work Will Take Place Over The Weekend.Extra Day Required On Top Of Initial Notice
Responsibility for works: BT
Current status: Advanced planning

A3055 Afton Road, Freshwater, Isle Of Wight
11 December — 15 December
Delays possible Traffic control (two-way signals)
Works location: Afton Road Junction School Green Road To Afton Road Junction With Newport Road
Works description: Access To Bt Boxes Required To Recover Redundant Cable. 2 Way Traffic Lights Are Required. Pedestrian Barriers Will Be Used Where Applicable. No Work Will Take Place At Bus Stops Or Junctions. Work Will Take Place During Working Hours. No Work Will Take Place Over The Weekend.
Responsibility for works: BT
Current status: Advanced planning

B3401 Calbourne Road, Newport, Isle Of Wight
11 December — 11 December
Delays possible Traffic control (two-way signals)
Works location: Os 9 Calbourne Road Newport Isle Of Wight Po30 1nl
Works description: Access Required To Underground Bt Structure To Restore Service – No Structural Changes. Work Being Carried Out On Existing Bt Plant
Responsibility for works: BT
Current status: Advanced planning

Staplers Road, Newport, Isle Of Wight
12 December — 16 December
Delays possible Traffic control (two-way signals)
Works location: Newport: Adjacent To The Junction Of Fairmount Drive, Opposite Polars (Ml 210124):
Works description: Install New 29 – Replacement Padestrian Crossing Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Hunnyhill, Newport, Isle Of Wight
11 December — 15 December
Delays possible Traffic control (two-way signals)
Works location: Hunnyhill From Parkhurst Road To St James Street
Works description: Access To Bt Boxes Required To Recover Redundant Cable.
Responsibility for works: BT
Current status: Advanced planning

Central Way, Sandown, Isle Of Wight
11 December — 24 December
Delays possible Traffic control (Stop/Go boards)
Works location: Sandown: Various Footways Around Central Way, Sandown (Ml F40672/73/75): Central Way-Sandown
Works description: Footway Re Constrution And Surfacing (Bit Part Recon) Sandown
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 Bridge Road, Yarmouth, Isle Of Wight
12 December — 30 December
Delays unlikely Traffic control (give & take)
Works location: Yarmouth: From River Road, West To Column 32 (Ml 620015):
Works description: Install N? 12 Lanterns (N? 5 Columns) Yarmouth
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Esplanade, Ryde, Isle Of Wight
12 December — 12 December
Delays unlikely Traffic control (give & take)
Works location: Ryde: Centre Of Bus Station In A Line With Cctv Pole And Bus Standf.: Esplanade-Ryde:; Ops Hub – 3rd Party/Authority
Works description: Surround Completely Broken Up. Needs Frame Rebedding And New Dbm Surround Of 20-30mm Width All Round. (Gl: Ironwork Rocking/Corrosion) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

B3327 Newport Road, Ventnor, Isle Of Wight
11 December — 15 December
Delays unlikely Some carriageway incursion
Works location: Lower Downside
Works description: – Interim To Pem Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Bay Road, Freshwater, Isle Of Wight
11 December — 19 December
Delays unlikely Traffic control (give & take)
Works location: Os Vista
Works description: Relay Service From Nearside Carriageway To Site
Responsibility for works: Southern Gas Networks Plc
Current status: Advanced planning

Carter Avenue, Shanklin, Isle Of Wight
11 December — 15 December
Delays unlikely Some carriageway incursion
Works location: 102, Carter Ave, Shanklin
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Crocker Street, Newport, Isle Of Wight
11 December — 15 December
Delays unlikely Some carriageway incursion
Works location: Crocker Street From Hunnyhill To O/S The Telephone Exchange
Works description: Access To Bt Boxes Required To Recover Redundant Cable
Responsibility for works: BT
Current status: Advanced planning

Elm Close, Ryde, Isle Of Wight
11 December — 15 December
Delays unlike Some carriageway incursion
Works location: 6b, Elm Cl, Ryde, Po331edy
Works description: -Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Everard Close, Freshwater, Isle Of Wight
12 December — 16 December
Delays unlikely Traffic control (give & take)
Works location: Freshwater: From Victoria Road, West To Dead End (Ml 640364): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install No 3 Lanterns (No 3 Columns) 1 Warning Sign Freshw
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Holford Road, Wootton, Isle Of Wight
12 December — 16 December
Delays unlikely Traffic control (give & take)
Works location: Wootton: From Footways, North East To Norman Way (Ml 340414): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install No 6 Lanterns (No 6 Columns) Wootto
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Ludbrook Way, Whitwell, Isle Of Wight
12 December — 16 December
Delays unlikely Traffic control (give & take)
Works location: Whitwell: From Nettlecombe Lane, South To Dead End (Ml 540218 And Ml 542218): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install No 2 Lanterns (No 2 Columns) 1 Warning Sign Whitwe
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Market Square, Yarmouth, Isle Of Wight
11 December — 17 December
Delays unlikely Some carriageway incursion
Works location: O/S The Deli
Works description: Scaffold (Lowes Scaffold)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Oaklyn Gardens, Shanklin, Isle Of Wight
11 December — 15 December
Delays unlikely Some carriageway incursion
Works location: 32 Oaklyn Gardens
Works description: – Interim To Pem Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

River View, East Cowes, Isle Of Wight
12 December — 16 December
Delays unlikely Traffic control (give & take)
Works location: East Cowes: From Campfield Road, North And South To Dead Ends (Ml 141335): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install No 6 Lanterns (No 5 Columns) 1 Warning Sign East C
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Sandy Lane, Shanklin, Isle Of Wight
11 December — 15 December
Delays unlikely Some carriageway incursion
Works location: 41 Sandy Lane
Works description: – Interim To Pem Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Station Approach, Lake, Isle Of Wight
11 December — 24 December
Delays unlikely Traffic control (give & take)
Works location: S/O 1 Fairfield Gardens
Works description: Excavate A Joint Hole In Footway For A New Electric Service To Site
Responsibility for works: Southern Electric
Current status: Advanced planning

Union Road, Cowes, Isle Of Wight
11 December — 15 December
Delays unlikely Traffic control (give & take)
Works location: Cowes: From Granville Road, North East To Market Hill (Ml 140142 And Ml 140141): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install No 4 Lanterns (No 2 Columns) 1 Warning Sign, 1 Parking Restriction Sign And 1 No Waiting Sign Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Whitecross Avenue, Shanklin, Isle Of Wight
12 December — 16 December
Delays unlikely Traffic control (give & take)
Works location: Shanklin: From Princes Way, North, Then East To Dead End (Ml 440237, Ml 440272, Ml 440312 And Ml 440313): :; Sl Cip Sche
Works description: Install No 12 Lanterns ( No 9 Columns) 1 Warning Sign, 5 Bus Stops And 1 Post Box Shankl
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Wilkes Road, Sandown, Isle Of Wight
12 December — 16 December
Delays unlikely Traffic control (give & take)
Works location: Sandown: From High Street, North To York Road (Ml 441378): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install No 3 Lanterns ( No 3 Columns) 1 Residents Parking Permit Signs And 1 Lit Warning Sign Sandow
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Winton Street, Ryde, Isle Of Wight
12 December — 16 December
Delays unlikely Traffic control (give & take)
Works location: Ryde: From Monkton Street, West To Trinity Street (Ml 340471): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install No 4 Lanterns (No 4 Columns) 2 Warning Signs Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Image: Stew Dean under CC BY 2.0