Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
Roadworks or road closures starting today or tomorrow.
A3021/A3054 Whippingham Road, East Cowes, Isle Of Wight
12 August — 14 August
Delays likely Traffic control (two-way signals)
Works location: East Cowes: Opposite The Entrance To Barton Manor On The N/B C/Way Towards E. Cowes: Whippingham Road-East Cowes:; Sched
Works description: Idr – Surface Around Gully Cover Has Broken Out Leaving Ironwork Exposed Appx 40mm Fill In P/H Tm – Stop/Go Boards East C
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3054 Kite Hill, Wootton, Isle Of Wight
13 August — 15 August
Delays likely Traffic control (two-way signals)
Works location: Wootton: O/S Nightingale House And Opp Culverden House: Kite Hill-Wootton:; Scheduler Ops Hub
Works description: Make Safe/ In Fill Tack Coat And 6mm Overlay (Patch Repair Approx 4.5 Sq.M In Westbound Lane. 2 X Areas Of Depression. 4sq.M O/S Nightingale Hse And 0.5 Sq.M Opp Culverden Hse) Tm=2 X Way Temp Lights Wootto
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3055 High Street, Brading, Isle Of Wight
13 August — 15 August
Delays likely Traffic control (two-way signals)
Works location: Brading: O/S Brading Youth And Community Centre On The Ryde Bound Side Of The C/Way By The Bus Stop: High Street-Brading
Works description: Make Safe – Road Surface Push-Up That Is Showing Evidence Of Vehicles Bottoming Out On It By Plaining/ Breaking Out Ridge, Tack Coat And Overlay (Approx Size Of Area 1.50 X .80) Tm – Two Way Temp Lights (Cw: Pothole) Bradin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Albert Street, Cowes, Isle Of Wight
13 August — 13 September
Delays likely Road closure
Works location: Cowes: From Victoria Road To Princes Street (Ml140181): Albert Street-Cowes:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Br-Stren:R/H4, Barell Cambered Roads – F1 – 100mm Channel Strengthen, Shaping And 30mm Fibrovia Surfac Course Overlay) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3326 Monkton Street, Ryde, Isle Of Wight
13 August — 14 August
Delays likely Road closure
Works location: Ryde: O/S 47 Monkton Street: Monkton Street-Ryde:; Scheduler Ops Hub
Works description: Repair C/W Patch 1.45 X 2.0 X 100mm Depth. Tm=Road Closure . (Cw: Pothole) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Buona Vista Road, Ventnor, Isle Of Wight
13 August — 13 September
Delays likely Road closure
Works location: Ventnor: From Dudley Road South To Its Full Adopted Length (Ml 560331): Buona Vista Road-Ventnor:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Fibrovia:U/H4, Resurface 30mm Fibrovia Plus Regulating/Patching (Kerbed=Inlay/Unkerbed=Overlay)-Urban: H4) Ventno
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Bedbury Lane, Freshwater, Isle Of Wight
12 August — 13 September
Delays likely Road closure
Works location: Freshwater: From Queens Road 300m East Thereof (Ml630206): Bedbury Lane-Freshwater:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Freshw
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Car Park Dudley Road, Ventnor, Isle Of Wight
13 August — 12 September
Delays likely Road closure
Works location: Ventnor: Dudley Road Car Park Ventnor (Cp064): Dudley Road-Ventnor:; Eric Longworth
Works description: Car Park Reconstruction, Planing And Resurfacing. (Cp-Recon:U/H4, Car Park – Full Reconstruction – 135mm Foambase, 25mm Ac6 Surface) Ventno
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Car Park Medina Avenue, Newport, Isle Of Wight
13 August — 13 September
Delays likely Road closure
Works location: Newport: Medina Avenue Car Park (Cp012): :; Eric Longworth
Works description: Car Park Reconstruction, Planing And Resurfacing. (Cp-Stren:R/H4, Car Park – Strengthening Overlay – 60mm Foambase, 25mm Ac10 Surface) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Grove Road, Ventnor, Isle Of Wight
12 August — 30 August
Delays likely Road closure
Works location: Ventnor: From Mitchell Avenue To Spring Hill (Ml540174): Grove Road-Ventnor:; Cw Cip Scheme Cw Cip Scheme
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Fibrovia:R/H4, Resurface 30mm Fibrovia Plus Regulating/Patching (Kerbed=Inlay/Unkerbed=Overlay)-Rural:H4) Ventno
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3055 Afton Road, Freshwater, Isle Of Wight
13 August — 15 August
Delays possible Traffic control (Stop/Go boards)
Works location: Opp Jnc Newport Road On, Afton Road
Works description: Replace 1 Jointbox Frame And Cover(S) (2315mm X 737mm) In Footway
Responsibility for works: BT
Current status: Advanced planning
B3325 Park Road, Cowes, Isle Of Wight
13 August — 15 August
Delays possible Traffic control (two-way signals)
Works location: Cowes: O/S 165 / 167: Park Road-Cowes:; Scheduler Ops Hub
Works description: Plane Out Hump, Tack Coat And Overlay At Edge C/W (Pushed Up). (Approx Size Of Patch 2.6m X 1.2m) * Temp Traffic Lights. Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3327 St Johns Road, Wroxall, Isle Of Wight
13 August — 15 August
Delays possible Traffic control (Stop/Go boards)
Works location: Os Highlands, St Johns Road
Works description: Replace 1 Jointbox Frame And Cover(S) (2285mm X 680mm) In Carriageway
Responsibility for works: BT
Current status: Advanced planning
B3341 St Johns Place, Newport, Isle Of Wight
12 August — 26 August
Delays possible Traffic control (two-way signals)
Works location: Newport: From Trafalgar Road, South To Medina Avenue (Ml 210082): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install No 2 Lanterns (No 2 Columns) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3341 Trafalgar Road, Newport, Isle Of Wight
12 August — 26 August
Delays possible Traffic control (two-way signals)
Works location: Newport: From St James Street Upper, West To Carisbrooke Road (Ml 230090 And Ml 230089): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install No 16 Lanterns (No 11columns) 3 Lit Warning Signs, 1 Power Supply Socket, 1 Lit Amber Flashing Sign And 1 Lit Vehicle Speed Activated Sign Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3395 Sandown Road, Bembridge, Isle Of Wight
13 August — 15 August
Delays possible Traffic control (two-way signals)
Works location: Bembridge: Right On Corner Of W/B C/Way Opposite Entrance To Britten Norman: Sandown Road-Bembridge:; Scheduler Ops Hub
Works description: Idr – Tack Coat/ Overlay Edge Of C/Way Where Disintegrated And Needs A Patch 1.60 X .70 X 50/100mm Deep Tm – Two Way Temp Lights Bembri
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Gate Lane, Freshwater, Isle Of Wight
12 August — 14 August
Delays possible Traffic control (Stop/Go boards)
Works location: Section 81/Cch Ref 1577336 C/W O/S Lisarda , Gate Lane
Works description: Replace 1 Jointbox Frame And Cover(S) (1220mm X 680mm) In Carriageway
Responsibility for works: BT
Current status: Advanced planning
Oakhill Road, Seaview, Isle Of Wight
13 August — 27 August
Delays possible Traffic control (two-way signals)
Works location: Seaview: From Springvale Road, South To Calthorpe Road (Ml 320087, Ml 340382, Ml 340383 And Ml 340384): :; Sl Cip Scheme
Works description: Install No 8 Lanterns (No 8 Columns) 1 No Waiting Sign Seavie
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Puckpool Hill, Seaview, Isle Of Wight
13 August — 27 August
Delays possible Traffic control (two-way signals)
Works location: Seaview: From Appley Road, North To Springvale Road (Ml 320090, Ml330376, Ml 330377 And Ml Ml 330378): :; Sl Cip Scheme
Works description: Install No 10 Lanterns (No 10 Columns) 1 Bus Stop, 1 No Ball Game Sign, 4 No Waiting Sign, 1 Route/Direction Sign, 3 Warning Signs And 1 Advert Banner Seavie
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Image: Ell R Brown under CC BY 2.0