Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
Roadworks or road closures starting today or tomorrow.
A3020 Blackwater Road, Newport, Isle Of Wight
17 July — 23 July
Delays likely Traffic control (two-way signals)
Works location: Approx 260m South Of Shide Rd On Blackwater Rd, A3020 To A3056 Jnc East Lane, Blackwater Road
Works description: Install 2x 100m Of Fibre Cable And Sub-Duct Into Duct
Responsibility for works: BT
Current status: Advanced planning
A3020 High Street, Godshill, Isle Of Wight
17 July — 18 July
Delays likely Traffic control (Stop/Go boards)
Works location: Godshill: O/S Hair Design: High Street-Godshill:; Ops Hub
Works description: Repair C/W Depression. Patch 2x7m. Total 14sqm. Tm=Two Way Temp Lights (Cw: Pothole) Godshi
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3054 Yarmouth Road, Calbourne, Isle Of Wight
17 July — 18 July
Delays likely Traffic control (two-way signals)
Works location: Calbourne: Yarmouth Road-Calbourne, On West Bound Carriageway 160metres Passed Three Gates Farm: Yarmouth Road-Calbourne
Works description: Idr , Priority Please . Iron Work To Road Gully Is Raised By 27mm And Carriageway Has Also Sunk Around The Frame. Tm= Two Way Lights Or Stop/Go Boards (Cw: Irnwk Not Exceed +Or- 20mm) Calbou
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3054 Yarmouth Road, Cranmore, Isle Of Wight
17 July — 18 July
Delays likely Traffic control (two-way signals)
Works location: Cranmore: Yarmouth Road-Calbourne, On West Bound Carriageway 230metres Passed Three Gates Farm, At Guyers Heath.: Yarmou
Works description: Idr , Carriageway Has Sunk/ Come-Away From Around A Road Gully, Please Cut Out And Fill With Dbm. Tm= Two Way Lights Cranmo
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3055 Steephill Road, Ventnor, Isle Of Wight
17 July — 18 July
Delays likely Road closure
Works location: Ventnor: Tm – R/C Required: :; Scheduler Ops Hub
Works description: Sub Con – Works As Per Quote No. Hc/ Gc367 Grind Tree/ Remove Trees Ventno
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Argyll Street, Ryde, Isle Of Wight
16 July — 29 July
Delays likely Traffic control (multi-way signals)
Works location: Ryde: From West Street, West To Pellhurst Road (Ml 310542 And Ml 310543): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install No 13 Lanterns (No 7 Columns) 2 Warning Signs Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3329/A3055 Avenue Road, Sandown, Isle Of Wight
17 July — 21 July
Delays likely Traffic control (two-way signals)
Works location: 42-44 Avenue Road , Sandown,Isle Of Wight.
Works description: – Replace Sewer M/H Frame & Cover
Responsibility for works: Southern Water
Current status: Advanced planning
B3330 St Johns Hill, Ryde, Isle Of Wight
17 July — 21 July
Delays likely Traffic control (two-way signals)
Works location: 28 St. Johns Hill, Ryde, Isle Of Wight.
Works description: – Reinstate Road Markings.
Responsibility for works: Southern Water
Current status: Advanced planning
Church Road, Binstead, Isle Of Wight
16 July — 11 August
Delays likely Road closure
Works location: Binstead: From Pitts Lane To Quarr Road (Ml340503): Church Road-Binstead:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Br-Stren:R/H4, Barell Cambered Roads – F1 – 100mm Channel Strengthen, Shaping And 30mm Fibrovia Surfac Course Overlay) Binste
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3020 Newport Road, Godshill, Isle Of Wight
16 July — 18 July
Delays possible Traffic control (two-way signals)
Works location: 77m Towards Rookley From Dubbers,Newport Road,Godshill,Iow.
Works description: – Replace Sewer M/H Frame & Cover In Carriageway
Responsibility for works: Southern Water
Current status: Advanced planning
A3055 Brading Road, Ryde, Isle Of Wight
17 July — 21 July
Delays possible Some carriageway incursion
Works location: Windward, Brading Road
Works description: – Interin To Perm
Responsibility for works: Southern Water
Current status: Advanced planning
A3055 High Street, Brading, Isle Of Wight
16 July — 18 July
Delays possible Some carriageway incursion
Works location: 8 High Street
Works description: Perm Reinstatement Of F/Way
Responsibility for works: Southern Water
Current status: Advanced planning
A3055 Sandown Road, Lake, Isle Of Wight
16 July — 18 July
Delays possible Some carriageway incursion
Works location: 35 Sandown Rd
Works description: Perm Reinstatement Of F/Way
Responsibility for works: Southern Water
Current status: Advanced planning
B3323 Pyle Street, Newport, Isle Of Wight
16 July — 22 July
Delays possible Some carriageway incursion
Works location: O/S 68
Works description: Scaffold
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3325 Nodes Road, Northwood, Isle Of Wight
16 July — 18 July
Delays possible Traffic control (two-way signals)
Works location: 66 Nodes Road , Cowes, Isle Of Wight.
Works description: Install New Water Service Connection
Responsibility for works: Southern Water
Current status: Advanced planning
B3330 St Johns Hill, Ryde, Isle Of Wight
17 July — 21 July
Delays possible Some carriageway incursion
Works location: 2 St Johns Rd
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning
Long Lane, Newport, Isle Of Wight
16 July — 29 July
Delays possible Traffic control (two-way signals)
Works location: Newport: From Staplers Road, South East To Junction Of Buckbury Lane (Ml 240209 And Ml 240107): :; Sl Cip Scheme Sl Cip
Works description: Install No 15 Lanterns (No 12 Columns And 2 Pb’S) 3 Bus Stops, 1 Warning Sign And 1 Lit Vehicle Activation Sign Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning