Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
Roadworks or road closures starting today or tomorrow.
A3055 Rowborough Lane, Brading, Isle Of Wight
19 June — 23 June
Delays likely Traffic control (multi-way signals)
Works location: Brading: From High Street, North To Beaper Shute (310042): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install No 6 Lanterns ( No 6 Cols) 4 Warning Signs And 1 Route/Direction Bradin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3323 Carisbrooke Road, Newport, Isle Of Wight
19 June — 19 June
Delays likely Traffic control (two-way signals)
Works location: Newport: O/S Lane Between 114 And 120 Carisbrooke Road: Carisbrooke Road-Newport:; Scheduler Ops Hub
Works description: Idr – Old Reinstatement Is Starting To Pick Out On The Edges Patching Would Be Best 1.5 X 2m But If Not Feasible – Needs Levelling With Bitmac Along Sunken Edges .20 X .30 .50 X .20 1.0 X .20 Tm – Two Way Temp Lights (Cw: Pothole) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3401 Calbourne Road, Newport, Isle Of Wight
20 June — 15 August
Delays likely Road closure
Works location: Newport: From A Point 250m South West Of Betty Haunt Lane A Further 255m South West (Ml220091): Calbourne Road-Newport:;
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren150:U/H2, Strengthen 25mm Ul-M 65psv And 125mm Hdm50-Urban:H2) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Burnt House Lane, Newport, Isle Of Wight
20 June — 03 July
Delays likely Road closure
Works location: Newport: From 494m East Of Pan Lane A Further 300 M East (Ml 440188): Burnt House Lane-Newport:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Fibrovia:R/H4, Resurface 30mm Fibrovia Plus Regulating/Patching (Kerbed = Inlay/Unkerbed = Overlay) Rural:H4 Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Burnt House Lane, Newport, Isle Of Wight
20 June — 03 July
Delays likely Road closure
Works location: Newport: From The Access To Little Sullens To Little East Standen Farm Cottages (Ml 440191): Burnt House Lane-Newport:;
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Fibrovia:R/H4, Resurface 30mm Fibrovia Plus Regulating/Patching (Kerbed + Inlay/Unkerbed = Overlay) Rural:H4 Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Burnt House Lane, Newport, Isle Of Wight
20 June — 03 July
Delays likely Road closure
Works location: Newport: From Great East Standen Farn Access To The Access To Little Sullens (Ml 440190): Burnt House Lane-Newport:; Sta
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Fibrovia:R/H4, Resurface 30mm Fibrovia Plus Regulating/Patching (Kerbed = Inlay/Unkerbed = Overlay) Rural:H4 Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Market Street, Ventnor, Isle Of Wight
20 June — 18 July
Delays likely Road closure
Works location: Ventnor: From High Street To Albert Street (Ml541264): Market Street-Ventnor
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Ventno
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3054 Bridge Road, Yarmouth, Isle Of Wight
19 June — 24 June
Delays possible Traffic control (two-way signals)
Works location: Outside Norton Grange Halletts Shute To Outside Carpark River Road Yarmouth Isle Of Wight Po41 0nt
Works description: 2 Way Rolling Lights Required For Safe Access To Underground Structure – Cabling For New Customer Connection.Working Hours 09.30 To 15.30. No 2 Setups At The Same Time
Responsibility for works: BT
Current status: Advanced planning
A3054 Bridge Road, Yarmouth, Isle Of Wight
19 June — 02 July
Delays possible Traffic control (multi-way signals)
Works location: Junc Of Bridge Road And Gas Works Lane Fw Cw
Works description: To Connect New Main Feeding Gasworks Lane
Responsibility for works: Southern Gas Networks Plc
Current status: Advanced planning
A3054 Halletts Shute, Yarmouth, Isle Of Wight
19 June — 24 June
Delays possible Traffic control (two-way signals)
Works location: Outside Norton Grange Halletts Shute To Outside Carpark River Road Yarmouth Isle Of Wight Po41 0nt
Works description: 2 Way Rolling Lights Required For Safe Access To Underground Structure – Cabling For New Customer Connection.Working Hours 09.30 To 15.30. No 2 Setups At The Same Time
Responsibility for works: BT
Current status: Advanced planning
A3054 River Road, Yarmouth, Isle Of Wight
19 June — 24 June
Delays possible Traffic control (two-way signals)
Works location: Outside Norton Grange Halletts Shute To Outside Carpark River Road Yarmouth Isle Of Wight Po41 0nt
Works description: 2 Way Rolling Lights Required For Safe Access To Underground Structure – Cabling For New Customer Connection.Working Hours 09.30 To 15.30. No 2 Setups At The Same Time.
Responsibility for works: BT
Current status: Advanced planning
B3330 Carpenters Road, Brading, Isle Of Wight
19 June — 23 June
Delays possible Traffic control (multi-way signals)
Works location: Brading: From Junction Of Beaper Shute And Rowborough Lane, East To Upper Green Road (Ml320069, 320071, 320072, 320073):
Works description: Install No 12 Lanterns ( No 3 Columns And 4 X Pb) 4 Warning Signs And 1 Lit Vehicle Activation Sign Bradin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning