Road works road closed signs

Roadworks and road closures: 21st January

Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.

Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

A3054 Fairlee Road, Newport, Isle Of Wight
21 January — 23 January
Delays likely Traffic control (two-way signals)
Works location: Newport: Opposite 211: Fairlee Road-Newport – 19081
Works description: Gully Tanker To Jet Gully / Investigate Exploded Footway (Prow: Obstruction) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Brading Road, Ryde, Isle Of Wight
21 January — 23 January
Delays likely Traffic control (Stop/Go boards)
Works location: Ryde: On The S/B C/Way Towards Brading Just Before Whitefield Forest Touring Park: Brading Road-Ryde – 21265
Works description: Idr – Blocked Gully Causing Ponding To Side Of C/Way Needs Clean And Flush (Gl: Non Functioning Gully) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 Binstead Hill, Binstead, Isle Of Wight
22 January — 24 January
Delays possible Some carriageway incursion
Works location: Binstead Hill From Binstead Road To Quarr Hill
Works description: Access To Bt Boxes Required To Recover Redundant Cable.
Responsibility for works: BT
Current status: Advanced planning

A3054 Elenors Grove, Binstead, Isle Of Wight
22 January — 24 January
Delays possible Some carriageway incursion
Works location: Elenors Grove From Quarr Hill To Kite Hill
Works description: Access To Bt Boxes Required To Recover Redundant Cable.
Responsibility for works: BT
Current status: Advanced planning

A3054 Fairlee Road, Newport, Isle Of Wight
21 January — 23 January
Delays possible Some carriageway incursion
Works location: 172, Fairlee Rd, Newport
Works description: – Interim To Perm Reinstatment
Responsibility for works: Southern Water
Current status: Advanced planning

A3054 Quarr Hill, Binstead, Isle Of Wight
22 January — 24 January
Delays possible Some carriageway incursion
Works location: Quarr Hill From Binstead Hill To Elenors Grove
Works description: Access To Bt Boxes Required To Recover Redundant Cable.
Responsibility for works: BT
Current status: Advanced planning

B3395 Church Road, Bembridge, Isle Of Wight
21 January — 23 January
Delays possible Traffic control (two-way signals)
Works location: Church Street From Sherbourne Street To O/S Bembridge Telephone Exchange
Works description: Access To Bt Boxes Required To Recover Redundant Cable.
Responsibility for works: BT
Current status: Work in progress

B3395 Embankment Road, Bembridge, Isle Of Wight
21 January — 23 January
Delays possible Traffic control (two-way signals)
Works location: Embankment Road From Latimer Road To Kings Road
Works description: Access To Bt Boxes Required To Recover Redundant Cable.
Responsibility for works: BT
Current status: Work in progress

B3395 Kings Road, Bembridge, Isle Of Wight
21 January — 23 January
Delays possible Traffic control (two-way signals)
Works location: Kings Road From Embankment Road To Sherbourne Street
Works description: Access To Bt Boxes Required To Recover Redundant Cable.
Responsibility for works: BT
Current status: Work in progress

B3395 Sherbourne Street, Bembridge, Isle Of Wight
21 January — 23 January
Delays possible Traffic control (two-way signals)
Works location: Sherbourne Street From Kings Road To Church Road
Works description: Access To Bt Boxes Required To Recover Redundant Cable.
Responsibility for works: BT
Current status: Work in progress

B3399 Newport Road, Freshwater, Isle Of Wight
21 January — 03 February
Delays possible Traffic control (two-way signals)
Works location: From Jcn Wilmingham Lane To Jcn Afton Rd In B3399 On Newport Road
Works description: Install 5x 100m Of Fibre Cable And Sub-Duct Into Duct
Responsibility for works: BT
Current status: Work in progress

Bullys Hill, Brading, Isle Of Wight
21 January — 23 January
Delays possible Traffic control (Stop/Go boards)
Works location: Brading: : Bullys Hill-Brading
Works description: Sub Con Groundsells Gc840 Quotation For The Cutting Around The Light Columns On Bullys Hill To Lower Adgestone Road, Brading. There Are 5 Light Columns Affected By Young Saplings And Branches. We Have Priced To Carry Out The Following Works: 1. Opposite Lyndhurst Remove Ash Saplings And Conifer Branches. 2. Opposite Hornsey Rise Remove Sycamore And Thorn Saplings. 3. Outside Down Edge Remove Small Thorn Around Column. 4. Opposite Willow Tree Remove Sycamore And Ash Saplings. 5. Corner Of
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Ashey Road, Ryde, Isle Of Wight
22 January — 30 January
Delays possible Traffic control (two-way signals)
Works location: Os 13
Works description: Lay New Main From Nearside Footway To Site
Responsibility for works: Southern Gas Networks Plc
Current status: Advanced planning

A3055 High Street, Ventnor, Isle Of Wight
22 January — 26 January
Delays unlikely Some carriageway incursion
Works location: O/S 32 , High Street
Works description: Replace 1 Jointbox Frame And Cover(S) (625mm X 625mm) In Carriageway
Responsibility for works: BT
Current status: Advanced planning

Anderri Way, Shanklin, Isle Of Wight
21 January — 23 January
Delays unlikely Some carriageway incursion
Works location: 19, Anderri Way, Shanklin, Po377ef
Works description: -Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

B3321 Clarence Road, East Cowes, Isle Of Wight
22 January — 30 January
Delays unlikely Traffic control (give & take)
Works location: Os 15
Works description: Relay Service From Mid Carriageway To Site
Responsibility for works: Southern Gas Networks Plc
Current status: Advanced planning

B3341 Castle Road, Newport, Isle Of Wight
21 January — 23 January
Delays unlikely Some carriageway incursion
Works location: 123, Castle Road, Newport, Isle Of Wight.
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

B3341 Medina Avenue, Newport, Isle Of Wight
21 January — 23 January
Delays unlikely Some carriageway incursion
Works location: 60a, Medina Ave, Newport
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

B3341 Medina Avenue, Newport, Isle Of Wight
21 January — 23 January
Delays unlikely Some carriageway incursion
Works location: Medina Dental Laboratory Ltd 119b, Medina Ave, Newport
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

B3399 Chale Street, Chale, Isle Of Wight
22 January — 26 January
Delays unlikely No carriageway incursion
Works location: O/S Malthouse, Chale Street
Works description: Build 1 Concrete Chamber 1310mm X 610mm X 1265mm Deep In Footway
Responsibility for works: BT
Current status: Advanced planning

B3399 Main Road, Brighstone, Isle Of Wight
22 January — 26 January
Delays unlikely No carriageway incursion
Works location: Opp Jcn Upper Lane Btwn O/S South View To 50m East , Main Road
Works description: Build 1 Concrete Chamber 1310mm X 610mm X 1265mm Deep In Footway,Install 49m Of 1 Way Poly Duct In Verge
Responsibility for works: BT
Current status: Advanced planning

Bonchurch Village Road, Ventnor, Isle Of Wight
21 January — 23 January
Delays unlikely Some carriageway incursion
Works location: Fernwood Cottage, Bonchurch Village Road,, Ventnor, Po381rg
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Gills Cliff Road, Ventnor, Isle Of Wight
21 January — 23 January
Delays unlikely Some carriageway incursion
Works location: 8, Gills Cliff Road, Ventnor, Iow
Works description: – Interim To Pem Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Fort Street, Sandown, Isle Of Wight
21 January — 03 February
Delays unlikely Traffic control (give & take)
Works location: Sandown: From Culver Parade, West To Column 5 (Ml 440149):
Works description: Install N? 1 Lantern (N? 1 Column) Sandown
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Work in progress

Fort Street, Sandown, Isle Of Wight
22 January — 23 January
Delays unlikely Some carriageway incursion
Works location: Fort Street Sandown
Works description: Cw Reinstatement To Rectify For Ha Defect
Responsibility for works: BT
Current status: Advanced planning

Station Avenue, Sandown, Isle Of Wight
22 January — 04 February
Delays unlikely Traffic control (give & take)
Works location: Sandown: From Junction Of St Johns Road, East To Albert Road (Ml 430146 & Ml 430147):
Works description: Install N? 4 Lanterns (N? 4 Columns) 1 Lit Warning Sign Sandown
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Elm Lane, Calbourne, Isle Of Wight
21 January — 22 January
Delays unlikely No carriageway incursion
Works location: S58 Doesnt Affect Works, In Soft O/S The Design Centre On,, Elm Lane
Works description: Remedial Works In Verge To Redo Ha Defect
Responsibility for works: BT
Current status: Advanced planning

Chale Lane, Chale, Isle Of Wight
22 January — 26 January
Delays unlikely No carriageway incursion
Works location: 18m North From Jcn Of Newman Lane On , Chale Lane
Works description: Build 1 Concrete Chamber 1310mm X 610mm X 1265mm Deep In Footway
Responsibility for works: BT
Current status: Advanced planning

Staplers Road, Newport, Isle Of Wight
21 January — 23 January
Delays unlikely Some carriageway incursion
Works location: 138 Flat 1, Staplers Rd, Newport
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Park Road, Ryde, Isle Of Wight
21 January — 29 January
Delays unlikely Some carriageway incursion
Works location: O/S 46
Works description: Fault Locating, Excavation & Works To Repair Low Voltage Mains Fault To Restore Existing Supplies, Backfill And Reinstate.
Responsibility for works: Southern Electric
Current status: Work in progress

Colwell Lane, Totland, Isle Of Wight
21 January — 23 January
Delays unlikely Some carriageway incursion
Works location: Silcombe Court,Colwell Lane,Freshwater,Iow
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Devonia Gardens, Brading, Isle Of Wight
21 January — 22 January
Delays unlikely Some carriageway incursion
Works location: In C/W And Soft O/S Heron Cottage , Devonia Gardens
Works description: Remedial Required For Ha Defect Broken/Cracked Edging Kerbs In Carriageway
Responsibility for works: BT
Current status: Advanced planning

Downsview Road, Bembridge, Isle Of Wight
21 January — 23 January
Delays unlikely Some carriageway incursion
Works location: 30, Downs Veiw Road , Bembridge, Iow
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Esplanade, Shanklin, Isle Of Wight
21 January — 23 January
Delays unlikely Some carriageway incursion
Works location: The Steamer Inn,Esplanade,Shanklin,Iow.
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Fraser Close, Cowes, Isle Of Wight
21 January — 23 January
Delays unlikely Some carriageway incursion
Works location: 4, Fraser Cl, Cowes, Po317qb
Works description: – Interim To Perm Reinstatment
Responsibility for works: Southern Water
Current status: Advanced planning

Grange Road, East Cowes, Isle Of Wight
21 January — 22 January
Delays unlikely No carriageway incursion
Works location: In F/W Os 5 To Across C/W To In F/W Os 2 At Entrance To School, Grange Road
Works description: Repair Ha Defect In Concrete In Footway
Responsibility for works: BT
Current status: Advanced planning

Harvey Close, East Cowes, Isle Of Wight
21 January — 23 January
Delays unlikely Some carriageway incursion
Works location: 55 Beatrice Avenue, East Cowes, Isle Of Wight.
Works description: – Install New Water Connection.
Responsibility for works: Southern Water
Current status: Advanced planning

Kitbridge Road, Newport, Isle Of Wight
21 January — 23 January
Delays unlikely Some carriageway incursion
Works location: 8, Kitbridge Rd, Newport, Po305rf
Works description: – Interim To Perm Reinstatment
Responsibility for works: Southern Water
Current status: Advanced planning

Laburnam Close, Newport, Isle Of Wight
21 January — 23 January
Delays unlikely Traffic control (give & take)
Works location: Newport: Whole Length Of Road From Shide Road (Ml 260306): Laburnam Close-Newport
Works description: Footway Re Construction And Surfacing (Fwr:Bit Full Recon) Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Longmead Road, Ryde, Isle Of Wight
21 January — 22 January
Delays unlikely No carriageway incursion
Works location: Jnc Quarry Road, O/S 57, Longmead Road
Works description: Remedial Works To Repair Highways Defect In Concrete
Responsibility for works: BT
Current status: Advanced planning

Meadow Green, Newport, Isle Of Wight
21 January — 23 January
Delays unlikely Some carriageway incursion
Works location: 4, Meadow Grn, Newport
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Meadow Green, Newport, Isle Of Wight
21 January — 23 January
Delays unlikely Some carriageway incursion
Works location: 8, Meadow Grn, Newport
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Mount Pleasant Road, Newport, Isle Of Wight
21 January — 23 January
Delays unlikely Some carriageway incursion
Works location: 12 Mount Pleasant Road, Newport ,Isle Of Wight.
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Nelson Road, Newport, Isle Of Wight
21 January — 23 January
Delays unlikely Some carriageway incursion
Works location: 36 Linden Road , Newport, Isle Of Wight.
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

New Street, Newport, Isle Of Wight
21 January — 23 January
Delays unlikely Some carriageway incursion
Works location: 58, New St, Newport
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Park Mews, Sandown, Isle Of Wight
21 January — 03 February
Delays unlikely Traffic control (give & take)
Works location: Sandown: From Station Road, North East To Dead End (Ml 440361):
Works description: Install N? 6 Lanterns (N? 6 Columns) Sandown
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Work in progress

Parsonage Road, Sandown, Isle Of Wight
21 January — 23 January
Delays unlikely Some carriageway incursion
Works location: 4, Parsonage Rd, Sandown
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Princes Esplanade, Gurnard, Isle Of Wight
21 January — 29 January
Delays unlikely Some carriageway incursion
Works location: O/S 1
Works description: Fault Locating, Excavation & Works To Repair Low Voltage Mains Fault To Restore Existing Supplies, Backfill And Reinstate.
Responsibility for works: Southern Electric
Current status: Work in progress

Shore Road, Ventnor, Isle Of Wight
21 January — 23 January
Delays unlikely Some carriageway incursion
Works location: The Wheelhouse, Shore Road,Ventnor
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Shorwell Footpath 28, Shorwell, Isle Of Wight
22 January — 26 January
Delays unlikely No carriageway incursion
Works location: R/O Seven Acres On , Shorwell Footpath 28
Works description: Build 1 Concrete Chamber 915mm X 445mm X 965mm Deep In Footway,Build 1 Precast Jointing Chamber (725mm X 225mm) 600mm Dep
Responsibility for works: BT
Current status: Advanced planning

Image: Stew Dean under CC BY 2.0