Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
Roadworks or road closures starting today or tomorrow.
A3056 Hale Common, Arreton, Isle Of Wight
28 August — 29 August
Delays likely Traffic control (two-way signals)
Works location: Arreton: O/S Westview: Hale Common-Arreton:; Scheduler Ops Hub
Works description: Make Safe (Tack Coat And Overlay) C/W Deefect 1.2×0.5x40mm Tm= Stop/Go Arreto
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Alverstone Road, Newchurch, Isle Of Wight
27 August — 27 September
Delays likely Road closure
Works location: Newchurch: From Skinners Lane 310m East (Ml430136): Alverstone Road-Newchurch:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing, (Ff-Recon 160:R/H3, Strengthen 25mm Ul-M 65psv And 135mm Foambase-Rural:H3) Newchu
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3330 Eddington Road, St Helens, Isle Of Wight
27 August — 09 September
Delays possible Traffic control (two-way signals)
Works location: St Helens: From Nettlestone Green, South To Upper Green Road (Ml 330076, Ml 330077, Ml 330078, Ml 330080 And Ml 330081):
Works description: Install No 12 Lanterns (No 5 Columns And 4 Pb’S) 4 Bus Stops And 1 Warning Sign St Hel
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3395 Embankment Road, Bembridge, Isle Of Wight
28 August — 10 September
Delays possible Traffic control (two-way signals)
Works location: Bembridge: From Junction Of Station Road And Latimer Road, South East To Last Light (Ml 320130 And Ml 320131): :; Sl Cip
Works description: Install No 6 Lanterns (No 4 Columns) 2 Route/Direction Signs, 1 Warning Sign And 2 Bus Stops Bembri
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3399 Limerstone Road, Shorwell, Isle Of Wight
28 August — 01 September
Delays possible Traffic control (two-way signals)
Works location: In C/W And Soft Os Monkspath (Surgery), Limerstone Road
Works description: Build 1 Concrete Chamber 915mm X 445mm X 965mm Deep In Footway,Install 18m Of 1 Way Poly Duct In Carriageway,Install 3m Of 1 Way Poly Duct In Verge
Responsibility for works: BT
Current status: Advanced planning
Mersley Downs Road, Arreton, Isle Of Wight
28 August — 29 August
Delays possible Traffic control (two-way signals)
Works location: Arreton: On E/B C/Way Just Before Turning To Duxmore Farm: Mersley Downs Road-Arreton:; Scheduler Ops Hub
Works description: Idr -Make Safe Using Tack Coat/ Overlay To Egde Of C/Way Failure P/H 3.60 X .50 X 40mm Tm – May Require Stop/ Go Boards Arreto
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Hillway Road, Bembridge, Isle Of Wight
28 August — 29 August
Delays possible Traffic control (two-way signals)
Works location: Bembridge: On The Jnc With Howgate Road: Hillway Road-Bembridge:; Andrew Telfer
Works description: Remove Ridges, Tack Coat, Overlay To Large Push-Up In Centre Of The C/Way Making The Surface Very Uneven. Size Approx 3.90 X 1.70 And 50/100mm Deep Bembri
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning