Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
Roadworks or road closures starting today or tomorrow.
A3054 High Street, Wootton, Isle Of Wight
02 July — 02 July
Delays likely Traffic control (two-way signals)
Works location: Wootton: O/S No.98: High Street-Wootton:; Scheduler Ops Hub
Works description: Idr – Fh Cover Reinstatement Is Starting To Crack Up And Sink Needs Reinstating By Whoever Is Responsible For These Covers 1.10 X .90 X 100/150mm Tm – Two Way Temp Lights Or Stop And Go Boards (Cw: Pothole) Wootto
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3055 Sandown Road, Shanklin, Isle Of Wight
02 July — 04 July
Delays likely Traffic control (multi-way signals)
Works location: Shanklin: From Junction Of Wilton Park Road, North To Skew Bridge (Ml 410037, Ml 410038, Ml 410039 And Ml 410040): :; Sl
Works description: Install No 19 Lanterns (No 14 Columns) 2 Bus Stops, 3 Route/Direction Signs, 5 Warning Signs And 1 Lit Vehicle Activation Sign Shankl
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3323 Carisbrooke Road, Newport, Isle Of Wight
02 July — 10 July
Delays likely Traffic control (two-way signals)
Works location: Os 95
Works description: Lay New Service From Nearside Carriageway To Site
Responsibility for works: Southern Gas Networks Plc
Current status: Advanced planning
B3323 St James Street, Newport, Isle Of Wight
02 July — 04 July
Delays likely Traffic control (give & take)
Works location: Os No. 120 (Lower St James Street)
Works description: Remedial Works To Be Carried Out – Self Core Failure
Responsibility for works: Southern Gas Networks Plc
Current status: Advanced planning
B3327 Mitchell Avenue, Ventnor, Isle Of Wight
02 July — 21 July
Delays likely Road closure
Works location: Ventnor: From Springhill To Macrocarpa Road (Ml 520066): Mitchell Avenue-Ventnor:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Recon225:U/H2, Reconstruction 25mm Ul-M 65psv, 75mm Hdm Binder, 125mm Foambase-Urban:H2 Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Carters Road, Ryde, Isle Of Wight
03 July — 29 August
Delays likely Road closure
Works location: Ryde: From Ashey Road 657m West (Ml320230): Carters Road-Ryde:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H2, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Rural:H2) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Carters Road, Ryde, Isle Of Wight
03 July — 30 August
Delays likely Road closure
Works location: Ryde: From Upton Road 380m East (Ml 320229): Carters Road-Ryde:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H2, Strengthen 25mm Ul-M 65psv And 75mm Hdm50-Rural:H2) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Northcliff Gardens, Shanklin, Isle Of Wight
02 July — 31 July
Delays likely Road closure
Works location: Shanklin: From St Martins Avenue To St Boniface Cliff Gardens (Ml441298): Northcliff Gardens-Shanklin:; Cw Cip Scheme Cw
Works description: Carriageway Reconstruction, Planing And Resurfacing.(Ff-Fibrovia:U/H4,Resurface 30mm Fibrovia Plus Regulating/Patching(Kerbed=Inlay/Unkerbed=Overlay)-Urban:H4) Shankl
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Whitesmith Road, Newport, Isle Of Wight
02 July — 03 July
Delays likely Road closure
Works location: Newport: Middle Of Carriageway, Junction Of Forest Road: Whitesmith Road-Newport:; Scheduler Ops Hub
Works description: Carriageway Repair Works (X2 Potholes Present, However A 1.5m2 Area To Be Patched 0.5mx0.4mx55mm 0.4mx0.3mx35mm Tm Road Closure Required (Cw: Pothole) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3054 Queens Road, Ryde, Isle Of Wight
03 July — 03 July
Delays possible Traffic control (two-way signals)
Works location: Ryde: O/S Ryde Junior School, Near Jct West St: Queens Road-Ryde:; Scheduler Ops Hub
Works description: Repair Area Of Wheel Push To Level Ridge. 2700x400x50mm. Tm=Gandt (Early / Late Start Due To Location?) (Cw: Pothole) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Elm Lane, Calbourne, Isle Of Wight
02 July — 04 July
Delays possible Traffic control (two-way signals)
Works location: 35 And 47 ,155 ,195 Meters From Jcn With A3054, Elm Lane
Works description: Locate And Excavate 4 Blockage In Existing Duct
Responsibility for works: BT
Current status: Advanced planning
Staplers Road, Newport, Isle Of Wight
02 July — 02 July
Delays possible Traffic control (two-way signals)
Works location: 22a Staplers Road Newport Isle Of Wight Po30 2dd
Works description: Access Required To Underground Bt Structure To Restore Service – No Structural Changes – Highway Will Be Unaffected. Work Being Carried Out On Existing Bt Plant
Responsibility for works: BT
Current status: Advanced planning
Queens Close, Freshwater, Isle Of Wight
03 July — 03 July
Delays possible Traffic control (two-way signals)
Works location: Ryde: O/S Ryde Junior School, Near Jct West St: Queens Road-Ryde:; Scheduler Ops Hub
Works description: Repair Area Of Wheel Push To Level Ridge. 2700x400x50mm. Tm=Gandt (Early / Late Start Due To Location?) (Cw: Pothole) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Image: daquellamanera under CC BY 2.0