Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
Roadworks or road closures starting today or tomorrow.
A3020 Blackwater Road, Newport, Isle Of Wight
30 July — 01 August
Delays likely Traffic control (multi-way signals)
Works location: Newport: Junction Of Blactwater Road And Blackwater Hollow: Blackwater Road-Newport:; Scheduler Ops Hub
Works description: 3x P/H’S .30 X .30 X 50mm Just Beyond Give And Take Way Markings On Turning Towards Rookley .20 X .20 X 50mm Just Beyond Give And Take Way Markings On Turning Towards Rookley .20 X .20 X 50mm On Newport Bound C/Way Tm – Three Way Temp Lights Or Mobile Works With Stop And Go Boards Higher Priority Than 28 Days Because Of Location But Not Expecting A 24 Hr Response (Cw: Pothole) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Albert Street, Cowes, Isle Of Wight
30 July — 24 August
Delays likely Road closure
Works location: Cowes: From Victoria Road To Princes Street (Ml140181): Albert Street-Cowes:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Br-Stren:R/H4, Barell Cambered Roads – F1 – 100mm Channel Strengthen, Shaping And 30mm Fibrovia Surfac Course Overlay) Cowes
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3401 High Street, Carisbrooke, Isle Of Wight
30 July — 01 August
Delays likely Traffic control (two-way signals)
Works location: Carisbrooke: From Junction Of Alvington Road, /East To Carisbrooke Road (Ml 210072, 210098, 310099, 220097, 240165): :;
Works description: Install No 17 Lanterns ( No 3 Columns) 1 Parking Restriction Sign, 2 Bus Stops, 1 Route/Direction Sign, 2 Warning Signs, 2 Public Notices, 1 Festive Decoration And 2 Large Lit Vehicle Activation Signs Carisb
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Car Park Garfield Road, Ryde, Isle Of Wight
30 July — 05 September
Delays likely Road closure
Works location: Ryde: Garfield Road Car Park (Cp034): Car Park Garfield Road-Ryde:; Eric Longworth
Works description: Car Park Reconstruction, Planing And Resurfacing. (Cp-Stren:U/H4, Car Park – Strengthening Inlay – 60mm Foambase, 25mm Ac6 Surface) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Church Road, Binstead, Isle Of Wight
30 July — 30 August
Delays likely Road closure
Works location: Binstead: From Pitts Lane To Quarr Road (Ml340503): Church Road-Binstead:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Br-Stren:R/H4, Barell Cambered Roads – F1 – 100mm Channel Strengthen, Shaping And 30mm Fibrovia Surfac Course Overlay) Binste
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Church Road, Binstead, Isle Of Wight
30 July — 30 August
Delays likely Road closure
Works location: Binstead: From Pitts Lane To Ladies Walk (Ml342319): Church Road-Binstead:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Br-Stren:R/H4, Barell Cambered Roads – F1 – 100mm Channel Strengthen, Shaping And 30mm Fibrovia Surfac Course Overlay) Binste
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Victoria Place, Ryde, Isle Of Wight
30 July — 30 August
Delays likely Road closure
Works location: Ryde: From Victoria Street West To The End Of Road (Ml : Victoria Place-Ryde:; Stacey Terrett
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3020 Newport Road, Godshill, Isle Of Wight
31 July — 01 August
Delays possible Traffic control (two-way signals)
Works location: Godshill: Newport Road North Of Godshill, Jct With Chequers Inn Road.: Newport Road-Godshill:; Scheduler Ops Hub
Works description: A Btcover Has Been Covered And Needs Road Surface Clearing Away And The Surround Made Good. Cover Measures 1x2metres Tm Will Require Temp 2way Lights As The Site Is Directly Opposite A Junction. Godshi
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
B3323 Clatterford Road, Newport, Isle Of Wight
31 July — 04 August
Delays possible Traffic control (two-way signals)
Works location: Newport: From Junction Of Carisbrooke High Street, South To Bowcombe Road (Ml 230069, Ml 230070 And Ml 230071): :; Sl Ci
Works description: Install No 15 Lanterns (No 8 Columns) 2 Warning Signs, 2 Bus Stops And 1 No Waiting Sign Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Long Lane, Newport, Isle Of Wight
30 July — 01 August
Delays possible Traffic control (two-way signals)
Works location: Newport: O/S New Holland Agriculture On The Arreton Bound Side Of The C/Way: Long Lane-Newport:; Ops Hub
Works description: Idr – Infill/ Make Safe C/W P/H 1.70 X .30 X 45mm Tm – Two Way Temp Lights C/Way (Cw: Pothole) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Priory Road, Carisbrooke, Isle Of Wight
31 July — 04 August
Delays possible Traffic control (multi-way signals)
Works location: Carisbrooke: From Clatterford Road, North To Gunville Road ( Ml 240165): :; Sl Cip Scheme Sl Cip Scheme
Works description: Install No 7 Lanterns ( No 1 Columns And 5 X Pb) Carisb
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning