Roadworks or road closures starting today or tomorrow. Information provided by Elgin via Roadworks.org

A3021/A3054 Whippingham Road, East Cowes, Isle Of Wight
04 February — 06 February
Delays likely Traffic control (two-way signals)
Works location: Whippingham Road From Junction With Folly Lane To The Junction Of Lushington Hill
Works description: Access To Bt Boxes Required To Recover Redundant Cable.
Responsibility for works: BT
Current status: Advanced planning

A3055 East Hill Road, Ryde, Isle Of Wight
03 February — 05 February
Delays possible Traffic control (two-way signals)
Works location: East Hill Road From Appley Road To The Strand
Works description: Access To Bt Boxes Required To Recover Redundant Cable.
Responsibility for works: BT
Current status: Advanced planning

B3326 The Strand, Ryde, Isle Of Wight
03 February — 05 February
Delays possible Traffic control (two-way signals)
Works location: The Strand From East Hill Road To Monkton Street
Works description: Access To Bt Boxes Required To Recover Redundant Cable.
Responsibility for works: BT
Current status: Advanced planning

B3399/B3401 Freshwater Road, Shalfleet, Isle Of Wight
03 February — 05 February
Delays possible Traffic control (two-way signals)
Works location: Mark Williams Waivered Section 58. In C/W Approx 170m East Of Jcn Dodpits Lane, Freshwater Road
Works description: Replace 1 Jointbox Frame And Cover(S) (625mm X 625mm) In Carriageway
Responsibility for works: BT
Current status: Advanced planning

B3401 Sun Hill, Calbourne, Isle Of Wight
04 February — 06 February
Delays possible Traffic control (two-way signals)
Works location: From Jct Elm Rd / Sunhill To O/S Calbourne Telephone Exchange.
Works description: Access To Bt Boxes Required To Recover Redundant Cable. 2 Way Rolling Traffic Lights Are Required. Pedestrian Barriers Will Be Used Where Applicable. No Work Will Take Place At Bus Stops Or Junctions. Work Will Take Place From 08.00 To 16.00. Some Work May Take Place Over The Weekend
Responsibility for works: BT
Current status: Advanced planning

Elm Lane, Calbourne, Isle Of Wight
04 February — 06 February
Delays possible Traffic control (two-way signals)
Works location: Fro Jct A3054 / Elm Lane. To Jct Elm Ln / Sunhill.
Works description: Start 08.00ccess To Bt Boxes Required To Recover Redundant Cable. 2 Way Rolling Traffic Lights Are Required. Pedestrian Barriers Will Be Used Where Applicable. No Work Will Take Place At Bus Stops Or Junctions. Work Will Take Place From 08.00 To 16.00. Some Work Will May Take Place Over The Weekend
Responsibility for works: BT
Current status: Advanced planning

Hunnyhill, Newport, Isle Of Wight
03 February — 16 February
Delays possible Traffic control (multi-way signals)
Works location: Newport: From St James Street Lower, North To Junction Of Banner Lane (Ml 220143, Ml 200145 And Ml 220146): :; Sl Cip Sc
Works description: Install N? 16 Lanterns (N? 13 Columns) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Hunnycross Way, Newport, Isle Of Wight
03 February — 16 February
Delays possible Traffic control (multi-way signals)
Works location: Newport: From Junction Of Hunny Hill, East To Riverway (Ml 220148):
Works description: Install N? 13 Lanterns (N? 13 Columns) 1 Warning Sign & 2 Route/Direction Signs Newport
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Whitecross Lane, Lake, Isle Of Wight
04 February — 06 February
Delays possible Traffic control (Stop/Go boards)
Works location: Lake: Merrie Gardens To Lark Rise: Whitecross Lane-Lake
Works description: Infill Longitudinal Joint On Centre Line Approx 10m In Length, Stop/Go Tm Lake
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3054 West Street, Ryde, Isle Of Wight
03 February — 05 February
Delays unlikely Some carriageway incursion
Works location: 34, West St,Ryde
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

A3055 Cross Street, Ryde, Isle Of Wight
03 February — 05 February
Delays unlikely Some carriageway incursion
Works location: Montana House,Cross Street,Ryde
Works description: – Remedial Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

A3055 Cross Street, Ryde, Isle Of Wight
03 February — 24 February
Delays unlikely Some carriageway incursion
Works location: O/S Nationwide
Works description: Scaffold (1st Choice Scaffolding
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

A3055 Pier Street, Ventnor, Isle Of Wight
04 February — 11 February
Delays unlikely Some carriageway incursion
Works location: Os 21a
Works description: Gsmr/Hse Cut Off – So35174
Responsibility for works: Southern Gas Networks Plc
Current status: Advanced planning

A3055 School Green Road, Freshwater, Isle Of Wight
03 February — 05 February
Delays unlikely No carriageway incursion
Works location: Frm Os 2 Stroud Road To Os So 150 Across Stroud Playing Fields To Opp 89, School Green Road
Works description: Build 3 Concrete Chamber 915mm X 445mm X 965mm Deep In Footway,Install 25m Of 2 Poly Ducts In Footway,Install 304m Of 2 Poly Ducts In Verge
Responsibility for works: BT
Current status: Advanced planning

Alvington Road, Carisbrooke, Isle Of Wight
03 February — 05 February
Delays unlikely Some carriageway incursion
Works location: 110, Alvington Road, Newport,Iow
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Ash Lane, Carisbrooke, Isle Of Wight
03 February — 05 February
Delays unlikely Some carriageway incursion
Works location: Pandora, Ash Lane, Newport, Po305lt
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

B3341 Castle Road, Newport, Isle Of Wight
03 February — 11 February
Delays unlikely Traffic control (give & take)
Works location: Os 27
Works description: Lay New Service From Nearside Carriageway To Site
Responsibility for works: Southern Gas Networks Plc
Current status: Advanced planning

B3395 Station Road, St Helens, Isle Of Wight
03 February — 05 February
Delays unlikely Some carriageway incursion
Works location: 27, Station Rd, St. Helens, Ryde
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

B3399 Emmett Hill, Chale, Isle Of Wight
04 February — 10 February
Delays unlikely Some carriageway incursion
Works location: O/S Tel Exchange , Emmett Hill
Works description: Build 1 Concrete Chamber 1310mm X 610mm X 1265mm Deep In Footway,Erect/Renew 1 Pcp Cabinet And Base (600mm X 300mm X 1000mm),Install 10m Of 2 Poly Ducts In Carriageway
Responsibility for works: BT
Current status: Advanced planning

Bourn Close, Binstead, Isle Of Wight
03 February — 05 February
Delays unlikely Some carriageway incursion
Works location: 17, Bourn Cl, Ryde
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Bourn Close, Binstead, Isle Of Wight
03 February — 10 February
Delays unlikely Some carriageway incursion
Works location: Os 10
Works description: Emergency Gas Escape In Progress.
Responsibility for works: Southern Gas Networks Plc
Current status: Advanced planning

Brook Path, Shanklin, Isle Of Wight
04 February — 17 February
Delays unlikely Traffic control (give & take)
Works location: Shanklin: Link Footway Between Collingwood Road & Brook Road (F40640): Brook Path-Shanklin
Works description: Footway Re-Construction And Surfacing (Fwl: Bit Slurry) Shanklin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Swanmore Road, Ryde, Isle Of Wight
03 February — 05 February
Delays unlikely Some carriageway incursion
Works location: 61, Swanmore Rd, Ryde
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

High Park Road, Ryde, Isle Of Wight
03 February — 05 February
Delays unlikely Some carriageway incursion
Works location: 83a, High Park Rd, Ryde
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Park Road, Ryde, Isle Of Wight
03 February — 05 February
Delays unlikely Some carriageway incursion
Works location: 11, Park Rd, Ryde
Works description: – Repair Leaking Stop Tap
Responsibility for works: Southern Water
Current status: Advanced planning

Hunnyhill, Newport, Isle Of Wight
03 February — 05 February
Delays unlikely Some carriageway incursion
Works location: 51
Works description: – Core Remedial Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Collingwood Path, Shanklin, Isle Of Wight
04 February — 17 February
Delays unlikely Traffic control (give & take)
Works location: Shanklin: Link Footway Between Carters Avenue & Collingwood Road (F40637): Collingwood Path-Shanklin
Works description: Footway Re-Construction And Surfacing (Fwl: Bit Fullrecon) Shanklin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Cothey Way, Ryde, Isle Of Wight
03 February — 16 February
Delays unlikely Traffic control (give & take)
Works location: Ryde: From Brading Road, East, Then North To Bullen Road (Ml 341301 & Ml 341303):
Works description: Install N? 7 Lanterns (N? 5 Columns) Ryde
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Downs View Road, St Helens, Isle Of Wight
03 February — 05 February
Delays unlikely Some carriageway incursion
Works location: 47, Downs View Rd, St. Helens, Ryde
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Esplanade, Seaview, Isle Of Wight
03 February — 16 February
Delays unlikely Traffic control (give & take)
Works location: Seaview: From High Street, West To Bluett Avenue (Ml 330505 & Ml 330507):
Works description: Install N? 4 Lanterns (N? 3 Columns) 1 Residents Parking Permit With Times, 1 Warning Sign, 1 Lit Warning Sign & 1 No Waiting Sign Seaview
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Esplanade, Shanklin, Isle Of Wight
03 February — 05 February
Delays unlikely Some carriageway incursion
Works location: Public Toilets, Esplanade , Shanklin, Isle Of Wight.
Works description: Relay Comm Pipe.
Responsibility for works: Southern Water
Current status: Advanced planning

High Street, Seaview, Isle Of Wight
03 February — 16 February
Delays unlikely Traffic control (give & take)
Works location: Seaview: From Junction Of Madeira Road, North To Esplanade (Ml 330507):
Works description: Install N? 2 Lanterns (N? 2 Columns) 2 Warning Signs Seaview
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Howard Road, Shanklin, Isle Of Wight
04 February — 06 February
Delays unlikely No carriageway incursion
Works location: Broken F/W Cover Os Linden , Howard Road
Works description: Replace 1 Jointbox Frame And Cover(S) (915mm X 445mm) In Footway
Responsibility for works: BT
Current status: Advanced planning

Lincoln Way, Bembridge, Isle Of Wight
03 February — 05 February
Delays unlikely Some carriageway incursion
Works location: 42, Lincoln Way, Bembridge
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Lugley Street, Newport, Isle Of Wight
03 February — 16 February
Delays unlikely Some carriageway incursion
Works location: O/S 15
Works description: Scaffold (1st Choice Scaffolding)
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Nelson Crescent, Ryde, Isle Of Wight
03 February — 05 February
Delays unlikely Some carriageway incursion
Works location: 11 Nelson Crescent, Ryde, Isle Of Wight.
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Recreation Ground Road, Newport, Isle Of Wight
03 February — 05 February
Delays unlikely Some carriageway incursion
Works location: 4 Recreation Ground Rd, Newport, Po305ah
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Ryde Road, Seaview, Isle Of Wight
03 February — 05 February
Delays unlikely Some carriageway incursion
Works location: Kildare, Ryde Road , Seaview, Isle Of Wight.
Works description: – Connect New Water Supply
Responsibility for works: Southern Water
Current status: Advanced planning

Sandcove Rise, Seaview, Isle Of Wight
03 February — 05 February
Delays unlikely Some carriageway incursion
Works location: 8, Sandcove Rise, Seaview
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Surrey Street, Ryde, Isle Of Wight
03 February — 05 February
Delays unlikely Some carriageway incursion
Works location: 23b, Surrey St, Ryde
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Sutton Close, Ryde, Isle Of Wight
03 February — 05 February
Delays unlikely Some carriageway incursion
Works location: 25, Sutton Cl, Ryde, Po331dh
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Two Penny Tube, Shanklin, Isle Of Wight
04 February — 17 February
Delays unlikely Traffic control (give & take)
Works location: Shanklin: Link Footway Between North Road & Spring Gardens (F40646): Two Penny Tube-Shanklin
Works description: Footway Re Construction And Surfacing (Fwl: Bit 50% Partrecon) Shanklin
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Watergate Road, Newport, Isle Of Wight
04 February — 13 February
Delays unlikely Traffic control (give & take)
Works location: Os 1 Adj To St Georges School
Works description: Lay New Main From Nearside Carriageway To Site
Responsibility for works: Southern Gas Networks Plc
Current status: Advanced planning

Winston Avenue, Binstead, Isle Of Wight
03 February — 05 February
Delays unlikely Some carriageway incursion
Works location: 42 Winston Avenue, Ryde, Isle Of Wight .
Works description: – Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning

Youngwoods Copse, Newchurch, Isle Of Wight
03 February — 16 February
Delays unlikely Traffic control (give & take)
Works location: Newchurch: Whole Length Of Road From Hoolwood Road (Ml 440441): Youngwoods Copse-Newchurch
Works description: Footway Re Construction And Surfacing (Fwl: Bit Partrecon) Newchurch
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning

Image: Stew Dean under CC BY 2.0