Check our weekly list of roadworks and road closures for more precise details of when works will start in your area.
Roadworks or road closures starting today or tomorrow.
B3399 Brighstone Road, Brook, Isle Of Wight
06 August — 13 September
Delays likely Road closure
Works location: Brook: From A Point 120m West, To A Point 130m East Of Hulverstone Lane (Ml630117): Brighstone Road-Brook:; Cw Cip Schem
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren110:R/H3, Strengthen 25mm Ul-M 65psv And 85mm Foambase-Rural:H3) Brook
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Car Park Wheelrs Bay, Ventnor, Isle Of Wight
06 August — 06 September
Delays likely Road closure
Works location: Ventnor: Wheelers Bay Car Park Ventnor (Cp063): Wheelers Bay Road-Ventnor:; Eric Longworth
Works description: Car Park Reconstruction, Planing And Resurfacing. (Cp-Stren:U/H4, Car Park – Strengthening Inlay – 60mm Foambase, 25mm Ac6 Surface) Ventno
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Clatterford Shute, Newport, Isle Of Wight
06 August — 06 September
Delays likely Road closure
Works location: Newport: From Clatterford Road To Millers Lane (Ml240241): Clatterford Shute-Newport:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:R/H4, Strengthen 30mm Fibrovia And 70mm Foambase-Rural:H4) Newpor
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Oaklyn Gardens, Shanklin, Isle Of Wight
06 August — 06 September
Delays likely Road closure
Works location: Shanklin: From Witbank Gardens 250m North East Thereof (Ml440277): Oaklyn Gardens-Shanklin:; Eric Longworth
Works description: Carriageway Reconstruction, Planing And Resurfacing. (Ff-Stren100:U/H4, F1-Strengthen 30mm Fibrovia And 70mm Foambase-Urban:H4) Shankl
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
A3054 Binstead Road, Ryde, Isle Of Wight
05 August — 07 August
Delays possible Some carriageway incursion
Works location: Former Wight Motors
Works description: Remedial Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning
B3323 Pyle Street, Newport, Isle Of Wight
06 August — 08 August
Delays possible Some carriageway incursion
Works location: Kandy Box, Pyle Street
Works description: Interim To Perm Reinstatement
Responsibility for works: Southern Water
Current status: Advanced planning
B3330 St Johns Hill, Ryde, Isle Of Wight
05 August — 07 August
Delays possible Some carriageway incursion
Works location: 28 St. Johns Hill, Ryde, Isle Of Wight.
Works description: – Reinstate Road Markings.
Responsibility for works: Southern Water
Current status: Advanced planning
Winford Road, Newchurch, Isle Of Wight
06 August — 14 August
Delays possible Traffic control (two-way signals)
Works location: Os Sunnybrow
Works description: Relay Service From Nearside Carriageway To Site
Responsibility for works: Southern Gas Networks Plc
Current status: Advanced planning
Whitwell Road, Godshill, Isle Of Wight
06 August — 07 August
Delays possible Traffic control (two-way signals)
Works location: Godshill: 20 Metres North Of Bt Pole A3.: :; Scheduler Ops Hub
Works description: Gully Grille Broken And Needs Replacement. Tm – Very Busy, Fast Road 2 Way T/L’S Godshi
Responsibility for works: Island Roads on behalf of the Isle of Wight Council
Current status: Advanced planning
Image: Hills_Alive under CC BY 2.0